COMMERCIALLY.caOfficeBuildings.ca
OfficeBuildings.ca / Downtown Commercial Core · Calgary office building record
Downtown Commercial Core · Calgary office building record

Eighth Avenue Place

Office · building · built 2014 · 585 8 Ave SW

LiDAR roof height
Storey-equivalent (derived)
Footprint0 m²
Parcel4,121 m²
Year built (roll)2014
Assessed 2026$307.1M
Structures on parcel0
Nearest CTrain171 m
Civic address
585 8 Ave SW, Calgary, AB
Community
Downtown Commercial Core (DNC)
City sub-property use
C101 Office · all Office sites
Land use district
CR20-C20/R20 — Commercial - Residential Core (Commercial - Core)
Height rank
Site coverage
0% of parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 201816691
Coordinates
51.045369, -114.073366

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

No LiDAR structure attributed to this parcel.

7.6 m structure8.5 m structure10.3 m structure10.9 m structure11 m structure11.2 m structure12.3 m structure19.3 m structure31.2 m structure47.5 m structure61 m structure108.7 m structurePlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Enclosed4th Street SW CTrainN50 mFootprints within 161 m · City of Calgary
Context within 161 m. Grey footprints darken with height; lime is the Plus 15 network.

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: 4th Street SW, 171 m straight-line (route 201/202). Planned Green Line station 7 Avenue SW is 430 m away (Downtown Segment, per the City’s Green Line map).

Other office buildings near 4th Street SW Station →

Plus 15

The City’s Plus 15 walkway geometry touches this parcel; the plan above shows the connected segments in lime. Confirm access points, hours and the interior route with the building.

Named building record

Public-domain building facts from Wikidata attached by location. Where a stated height differs from the LiDAR roof, the difference usually reflects spires, screens or datum.

Name
Eighth Avenue Place
Description
building complex in Calgary, Alberta, Canada
Opened
2011
Style
modern architecture
Identifier
Wikidata Q1303545 (CC0)

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 201816691 · Office

Series not charted. The City’s published values for this roll number change by more than half or double between years, which usually signals a re-numbered, split or partially assessed account rather than a market movement. The published figures are listed below without a trend claim.

Published values by roll year
Roll yearAssessed valueChange
2013$29.3M
2014$178.3M509.4%
2015$577.4M223.9%
2016$505.2M-12.5%
2017$401.3M-20.6%
2018$392.4M-2.2%
2019$300.7M-23.4%
2020$304.0M1.1%
2021$268.9M-11.6%
2022$250.4M-6.9%
2023$291.9M16.6%
2024$299.7M2.7%
2025$307.8M2.7%
2026$307.1M-0.2%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

05102012: 0 development permits2012: 1 building permit122013: 0 development permits2013: 2 building permits132014: 0 development permits2014: 13 building permits142015: 1 development permit2015: 2 building permits152016: 0 development permits2016: 1 building permit162017: 0 development permits2017: 3 building permits172018: 0 development permits2018: 5 building permits182019: 0 development permits2019: 5 building permits192020: 2 development permits2020: 0 building permits202021: 1 development permit2021: 4 building permits212022: 0 development permits2022: 1 building permit222023: 0 development permits2023: 4 building permits232024: 0 development permits2024: 4 building permits242025: 0 development permits2025: 2 building permits252026: 0 development permits2026: 2 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 4 since 2012

AppliedPermitCategory · descriptionStatus
2021-04-07DP2021-2276Change of Use - Permitted Use
CHANGE OF USE: OFFICE
Cancelled
2020-02-03DP2020-0620Signs - Permitted Use
NEW: SIGN - CLASS B (FASCIA SIGNS - 6)
Released
Approval
2020-02-03DP2020-0622Signs - Permitted Use
NEW: SIGN - CLASS B (FASCIA SIGNS - 2)
Released
Approval
2015-09-28DP2015-4058Signs - Discretionary Use
NEW: SIGN - CLASS C (FREESTANDING SIGN)
Refused
Refusal

Recent building permits 49 since 2012 · 43 in the City’s office class

AppliedPermitClass · workEst. costStatus
2026-09-09BP2026-172143106 - Retail Shop · Improvement$100,000Pending Plans Review Assignment
2026-07-09BP2026-128263401 - Bank · Improvement
ATB EAP Capital Market Renovation
$118,000Issued Permit
2025-03-07BP2025-039717103 - Special Function - Class 1 · Unspecified
Tier 3 Temporary Tents/ Structures EAP Stampede
$9,100Completed
2025-01-14BP2025-006683402 - Office · Improvement
Interior alterations
$95,000Issued Permit
2024-12-04BP2024-252573402 - Office · Improvement
Interior alterations
$111,733Issued Permit
2024-10-10BP2024-216663402 - Office · Improvement
ATB EAP 7th Floor Partial Renovation - Interior alterations
$263,600Completed
2024-08-16BP2024-171193402 - Office · Improvement
Interior alterations and demising wall
$93,000Completed
2024-06-12BP2024-117143402 - Office · Improvement
Office Interior Alteration
$780,000Completed

Declared estimated project cost across all 49 non-residential building permits on the parcel since 2012: $64.0M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • Eighth Avenue Place East Tower525 8 Ave SWheight n/a · built 2010 · Office · Downtown Commercial Core · 66 m
  • 607 8 Ave SW61 m · built 2007 · Office · Downtown Commercial Core · 82 m
  • 530 8 Ave SW108.7 m · built 1982 · Office · Downtown Commercial Core · 106 m
  • Eighth Avenue Building505 8 Ave SW31.2 m · built 1954 · Office · Downtown Commercial Core · 107 m
  • Triad Building535 7 Ave SW19.3 m · built 1956 · Office · Downtown Commercial Core · 128 m
  • Barron Building620 8 Ave SW12.3 m · built 1940 · Office · Downtown Commercial Core · 143 m

Eighth Avenue Place questions

Answers drawn from the record.

How tall is Eighth Avenue Place?

No LiDAR structure could be attributed to this parcel in the current City 3D building layer.

When was Eighth Avenue Place built?

The City’s assessment roll records 2014 as the year of construction. Wikidata records 2011 as the opening year.

Which CTrain station is closest to Eighth Avenue Place?

4th Street SW Station, 171 m in a straight line from the parcel centroid.

Is office space available at Eighth Avenue Place?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC) — The City of Calgary, retrieved 2026-09-21. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.