COMMERCIALLY.caOfficeBuildings.ca
OfficeBuildings.ca / Downtown Commercial Core · Calgary office building record
Downtown Commercial Core · Calgary office building record

Eighth Avenue Place East Tower

Office · building · built 2010 · 525 8 Ave SW

LiDAR roof height
Storey-equivalent (derived)
Footprint0 m²
Parcel5,872 m²
Year built (roll)2010
Assessed 2026$402.1M
Structures on parcel0
Nearest CTrain170 m
Civic address
525 8 Ave SW, Calgary, AB
Community
Downtown Commercial Core (DNC)
City sub-property use
C101 Office · all Office sites
Land use district
CR20-C20/R20 — Commercial - Residential Core (Commercial - Core)
Height rank
Site coverage
0% of parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 201816683
Coordinates
51.045321, -114.072425

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

No LiDAR structure attributed to this parcel.

7.6 m structure9.3 m structure9.3 m structure10.2 m structure10.3 m structure10.3 m structure11.9 m structure12.5 m structure12.5 m structure19.3 m structure23.6 m structure27 m structure27.5 m structure30 m structure31.2 m structure31.2 m structure51.6 m structure108.7 m structurePlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — Enclosed4th Street SW CTrainN50 mFootprints within 174 m · City of Calgary
Context within 174 m. Grey footprints darken with height; lime is the Plus 15 network.

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: 4th Street SW, 170 m straight-line (route 201/202). Planned Green Line station 7 Avenue SW is 375 m away (Downtown Segment, per the City’s Green Line map).

Other office buildings near 4th Street SW Station →

Plus 15

The City’s Plus 15 walkway geometry touches this parcel; the plan above shows the connected segments in lime. Confirm access points, hours and the interior route with the building.

Named building record

Public-domain building facts from Wikidata attached by location. Where a stated height differs from the LiDAR roof, the difference usually reflects spires, screens or datum.

Name
Eighth Avenue Place East Tower
Description
skyscraper in Calgary, Canada
Stated height
212.3 m (LiDAR roof null m)
Floors
49
Opened
2011
Identifier
Wikidata Q122474969 (CC0)
Name
Eighth Avenue Place West Tower
Description
skyscraper in Calgary, Canada
Stated height
176.7 m (LiDAR roof null m)
Floors
40
Opened
2014
Identifier
Wikidata Q122475410 (CC0)

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 201816683 · Office

$0$212.6M$425.2M$637.8M$850.3M2013201620192022202520262013 roll: $562.0M2014 roll: $648.6M2015 roll: $787.4M2016 roll: $709.7M2017 roll: $536.8M2018 roll: $506.8M2019 roll: $393.5M2020 roll: $402.4M2021 roll: $360.0M2022 roll: $337.1M2023 roll: $389.9M2024 roll: $399.3M2025 roll: $404.8M2026 roll: $402.1M$402.1M (2026)
Published values by roll year
Roll yearAssessed valueChange
2013$562.0M
2014$648.6M15.4%
2015$787.4M21.4%
2016$709.7M-9.9%
2017$536.8M-24.4%
2018$506.8M-5.6%
2019$393.5M-22.4%
2020$402.4M2.3%
2021$360.0M-10.5%
2022$337.1M-6.4%
2023$389.9M15.7%
2024$399.3M2.4%
2025$404.8M1.4%
2026$402.1M-0.7%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

0510152012: 0 development permits2012: 8 building permits122013: 1 development permit2013: 6 building permits132014: 0 development permits2014: 4 building permits142015: 2 development permits2015: 13 building permits152016: 0 development permits2016: 13 building permits162017: 1 development permit2017: 12 building permits172018: 0 development permits2018: 9 building permits182019: 0 development permits2019: 8 building permits192020: 0 development permits2020: 7 building permits202021: 1 development permit2021: 15 building permits212022: 0 development permits2022: 10 building permits222023: 0 development permits2023: 13 building permits232024: 2 development permits2024: 8 building permits242025: 0 development permits2025: 8 building permits252026: 0 development permits2026: 12 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 7 since 2012

AppliedPermitCategory · descriptionStatus
2024-01-19DP2024-00444Signs - Discretionary Use - Third Party Signs
TEMPORARY USE: SIGN - CLASS G (DIGITAL THIRD PARTY ADVERTISING SIGN - 3 YEARS)
Released
Approval
2024-01-17DP2024-00364Signs - Discretionary Use - Third Party Signs
TEMPORARY USE: SIGN - CLASS G (DIGITAL THIRD PARTY ADVERTISING SIGN - 3 YEARS)
Released
Approval
2021-12-14DP2021-8960Signs - Discretionary Use - Third Party Signs
TEMPORARY USE: SIGN - CLASS F (THIRD PARTY ADVERTISING SIGN - 5 YEARS)
Released
Approval
2017-08-16DP2017-3757Change of Use - Discretionary Use or Relaxations Required
CHANGE OF USE: LIQUOR STORE
Released
Approval
2015-11-19DP2015-4829Change of Use - Discretionary Use or Relaxations Required
CHANGE OF USE: MEDICAL CLINIC
Released
Approval
2015-04-09DP2015-1373Change of Use - Permitted Use
CHANGE OF USE: FINANCIAL INSTITUTION
Released
Approval
2013-03-27DP2013-1252Change of Use - Discretionary Use or Relaxations Required
CHANGE OF USE: ATHLETIC & RECREATIONAL FACILITY
Released
Approval

Recent building permits 146 since 2012 · 111 in the City’s office class

AppliedPermitClass · workEst. costStatus
2026-09-15BP2026-176653402 - Office · Improvement$125,000Pending Plans Review Assignment
2026-09-03BP2026-168993402 - Office · Improvement$6.3MPending Plans Review Assignment
2026-07-29BP2026-143383402 - Office · Improvement
Group D Office 3.2.2.56.
$126,827Issued Permit
2026-06-29BP2026-120543402 - Office · Improvement
Interior Alteration
$1.8MIssued Permit
2026-06-25BP2026-117433402 - Office · Improvement
Interior Alteration
$165,000Issued Permit
2026-05-28BP2026-094703402 - Office · Improvement
Interior Alteration - Whitecap
$270,000Issued Permit
2026-05-19BP2026-087203402 - Office · Improvement
Interior Alteration
$10,550Issued Permit
2026-05-12BP2026-081983402 - Office · Improvement
Interior Alteration
$415,000Issued Permit

Declared estimated project cost across all 146 non-residential building permits on the parcel since 2012: $83.5M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • Eighth Avenue Building505 8 Ave SW31.2 m · built 1954 · Office · Downtown Commercial Core · 46 m
  • Eighth Avenue Place585 8 Ave SWheight n/a · built 2014 · Office · Downtown Commercial Core · 66 m
  • Royal Bank of Canada Building409 8 Ave SW23.6 m · built 1954 · Office · Downtown Commercial Core · 89 m
  • 530 8 Ave SW108.7 m · built 1982 · Office · Downtown Commercial Core · 114 m
  • 407 8 Ave SW51.6 m · built 1966 · Office · Downtown Commercial Core · 116 m
  • 510 8 Ave SW27.5 m · built 1987 · Office/Retail · Downtown Commercial Core · 129 m

Eighth Avenue Place East Tower questions

Answers drawn from the record.

How tall is Eighth Avenue Place East Tower?

No LiDAR structure could be attributed to this parcel in the current City 3D building layer.

When was Eighth Avenue Place East Tower built?

The City’s assessment roll records 2010 as the year of construction. Wikidata records 2011 as the opening year.

Which CTrain station is closest to Eighth Avenue Place East Tower?

4th Street SW Station, 170 m in a straight line from the parcel centroid.

Is office space available at Eighth Avenue Place East Tower?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC) — The City of Calgary, retrieved 2026-09-21. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.