COMMERCIALLY.caCommercially × Real BrokerOfficeBuildings.ca
OfficeBuildings.ca / Downtown Commercial Core · Calgary office building record
Downtown Commercial Core · Calgary office building record

Triad Building

Office · mid-rise office building · built 1956 · 535 7 Ave SW

3D render of Triad Building (535 7 Ave SW), a 19.3 m mid-rise office building in Downtown Commercial Core, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with Triad Building highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

Triad Building (535 7 Ave SW) is a 19.3 m mid-rise office building in Downtown Commercial Core, Calgary, recorded on the City assessment roll as built in 1956. Its main structure is the 266th tallest office roof of the 775 ranked in this record, and 104th of 119 in Downtown Commercial Core. The City assesses the parcel at $2.8M on the 2026 roll, 546th of 822 sites in the record by assessed value. A Plus 15 walkway touches the parcel. The nearest CTrain platform is 4th Street SW, 65 m away in a straight line. 2,239 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 3 building permits and 1 development permit on the parcel, the largest a $1.3M tv studio-no seats permit for alteration, applied for in 2014. It appears on the City’s Inventory of Evaluated Historic Resources as Triad Building.

LiDAR roof height19.3 m
Storey-equivalent (derived)5
Footprint1,122 m²
Parcel1,200 m²
Year built (roll)1956
Assessed 2026$2.8M
Structures on parcel1
Nearest CTrain65 m
Civic address
535 7 Ave SW, Calgary, AB
Community
Downtown Commercial Core (DNC)
City sub-property use
C101 Office · all Office sites
Land use district
CR20-C20/R20 — Commercial - Residential Core (Commercial - Core)
Height rank
#266 of 785 citywide · #104 of 111 in Downtown Commercial Core
Footprint to parcel
94% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 067074708
Coordinates
51.046527, -114.073466
Own or manage Triad Building?

Slav Loban and the Commercially × Real Broker team give Calgary commercial owners a confidential pricing opinion based on the public record shown on this page: assessment history, permits, land use and the surrounding market. It is a broker’s opinion of value, not a formal appraisal. You do not need to be ready to list to start the conversation.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

19.3 mN20 mLiDAR roof outlines · City of Calgary · true scale
19.3 m · 1,122 m²
4.8 m structure5.8 m structure5.9 m structure6.2 m structure7.6 m structure9.3 m structure9.3 m structure9.3 m structure10.3 m structure10.9 m structure12.3 m structure12.7 m structure14.7 m structure27.5 m structure47.5 m structure108.7 m structure125.3 m structurePlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Enclosed19.3 m · 1,122 m² footprint6th Street SW CTrain4th Street SW CTrainN50 mFootprints within 150 m · City of Calgary
Context within 150 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Downtown Commercial Core median and tallest, and against the city.

Triad Building19.3 mDowntown Commercial Core median66.2 mDowntown Commercial Core tallest243.2 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: 4th Street SW, 65 m straight-line (route 201/202). Planned Green Line station 7 Avenue SW is 397 m away (Downtown Segment, per the City’s Green Line map).

Other office buildings near 4th Street SW Station →

Plus 15

The City’s Plus 15 walkway geometry touches this parcel; the plan above shows the connected segments in lime. Confirm access points, hours and the interior route with the building.

Cycling

The best-rated cycling facility within 400 m of the parcel is a protected lane (Cycle Track), 9 m away.

Winter access

The parcel fronts a Priority 1 snow and ice clearing route, 9 m from its edge. Priority 1 routes are cleared first after a snowfall.

Accessible crossing

The nearest accessible pedestrian signal is at 7 Avenue and 5 Street, 40 m from the parcel.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

2,239 scheduled transit trips call within 300 m of this parcel on a representative weekday, 320 of them between 07:00 and 09:00, across 28 routes and 24 stops. The closest stop is SB 5 ST SW @ 7 AVE SW, 35 m away.

Service classTrips on the service day
REGULAR1,046
LRT672
MAX373
BRT121
EXPRESS27

Routes: 1 Bowness/Forest Lawn · 2 Mount Pleasant/Killarney 17 Av SW · 3 Sandstone/Elbow Dr SW · 4 Huntington · 5 North Haven · 6 Killarney/26 Av SW · 7 Marda Loop · 13 Altadore · 15 Deerfoot Meadows · 17 Renfrew/Ramsay · 22 Richmond Rd SW · 62 Hidden Valley · 64 MacEwan · 66 Lakeview · 101 Inglewood · 109 Harvest Hills · 116 Coventry Hills · 117 McKenzie Towne Express · 131 East Bow Express · 142 Panorama · 151 New Brighton Express · 201 Red Line - Somerset - Bridlewood/Tuscany CTrain · 202 Blue Line - Saddletowne/69 Street CTrain · 302 BRT Southeast/City Centre · 500 Airport Express · 503 Symons Valley Express · MG MAX Green North Pointe/ City Centre · MY MAX Yellow Woodpark/City Centre.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

Paid on-street parking within 200 m

123 metered stalls across 22 City parking zones touching this walking radius, at $1.00 to $4.75 per hour depending on zone and time of day. Maximum stay 30 to 120 minutes. Tariff zones 4a, 4b, 4c, 4d.

Enforced 0710-1750 MON-FRI, 0910-1750 SAT; 0840-1520 MON-FRI; 0840-1520 MON-FRI, 0910-1750 SAT; 0910-1520 MON-FRI.

Closest zone

8 Av SW, Fr 4 St SW To 5 St SW — 58 m from the parcel, 3 parallel stalls, tariff zone 4d, 120-minute maximum.

WhenRate
Mon-Fri 7:00 AM to 9:00 AM$2.75 per Hour
Mon-Fri 9:00 AM to 1:30 PM$4.00 per Hour
Mon-Fri 1:30 PM to 3:30 PM$3.75 per Hour
Mon-Fri 3:30 PM to 6:00 PM$3.25 per Hour
Saturday: 9:00 AM to 6:00 PM$1.00 per hour
Sunday/Holidays:Free parking
Free parking to 7am Mon-FriSee Signs /Parking Restrictions

The City of Calgary On-Street Parking Zones with Rates, retrieved 2026-09-24. Counts cover Active paid parking zones only: loading bays, taxi stands, accessible stalls and permit-only zones are excluded, and off-street parkades are not in this dataset. Tariffs and enforcement hours change; confirm on the sign.

Heritage inventory

The City of Calgary Inventory of Evaluated Historic Resources records the following on this parcel.

Triad Building

Construction year
1956
Architect
Rule Wynn and Rule
Style
Modern
Typology
Office
Development era
1946 to 1956 (Oil Boom)
Original use
Commerce
Planning theme
Business and Industry
Designation
Inventory listing only
Inventory class
CWHR

Heritage Character Statement

A Modern style office building - it features large flat wall surfaces with expressed structural grid and defined modular glazing panels. Constructed by Triad Oil, it was part of the post WWII building boom of oil company headquarters in the west end of downtown Calgary. It is one of the few remaining office structures from this era.

Summary History

Following a major oil discovery at Leduc, Alberta in 1947, Calgary quickly emerged as the administrative centre of western Canada's petroleum industry. Very little major construction had taken place in the city since before the Great Depression, and oil company representatives initially made their headquarters in hotel rooms and aging office buildings. The first major project to address the increased demand for office space was the Barron Building, designed by Cawston and Stevenson and completed in 1951. This

Source: The City of Calgary Inventory of Evaluated Historic Resources, entry 472.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 067074708 · Office

Series not charted. The City’s published values for this roll number change by more than half or double between years, which usually signals a re-numbered, split or partially assessed account rather than a market movement. The published figures are listed below without a trend claim.

Published values by roll year
Roll yearAssessed valueChange
2005$3.0M—
2006$3.6M20.9%
2007$6.3M74.7%
2008$7.6M21.9%
2009$7.3M-4.6%
2010$4.9M-33.3%
2011$3.9M-19.8%
2012$3.6M-6.4%
2013$8.0M118.4%
2014$10.0M25.5%
2015$10.5M5.2%
2016$8.5M-19.1%
2017$7.4M-13.3%
2018$7.4M0.0%
2019$7.0M-4.6%
2020$6.6M-6.7%
2021$6.4M-2.0%
2022$5.5M-14.1%
2023$4.7M-15.4%
2024$4.9M5.6%
2025$3.5M-28.9%
2026$2.8M-20.5%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

0122012: 0 development permits2012: 0 building permits122013: 0 development permits2013: 0 building permits132014: 0 development permits2014: 2 building permits142015: 0 development permits2015: 1 building permit152016: 1 development permit2016: 0 building permits162017: 0 development permits2017: 0 building permits172018: 0 development permits2018: 0 building permits182019: 0 development permits2019: 0 building permits192020: 0 development permits2020: 0 building permits202021: 0 development permits2021: 0 building permits212022: 0 development permits2022: 0 building permits222023: 0 development permits2023: 0 building permits232024: 0 development permits2024: 0 building permits242025: 0 development permits2025: 0 building permits252026: 0 development permits2026: 0 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 1 since 2012

AppliedPermitCategory · descriptionStatus
2016-07-15DP2016-2924Signs - Permitted Use with Relaxation
NEW: SIGN - CLASS B (FASCIA SIGN) - SIGN AREA
Lapsed
Approval

Recent building permits 3 since 2012 · 1 in the City’s office class

AppliedPermitClass · workEst. costStatus
2015-12-18BP2015-160543402 - Office · Alteration
Fire alarm upgrade throughout building.
$108,000Completed
2014-03-17BP2014-033932354 - Tv Studio-No Seats · Alteration
Interior Alteration
$1.3MFile Closed
2014-02-24BP2014-022862354 - Tv Studio-No Seats · Alteration
Interior demolition
$75,000Completed

Declared estimated project cost across all 3 non-residential building permits on the parcel since 2012: $1.5M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

15 inspection results are published against 3 of the 3 building permits on this parcel, from 2014-05-12 to 2016-02-04. The most recent occupancy inspection was accepted on 2014-10-31. 4 inspections used a life-safety checklist.

What was inspected

0510Firestopping: 44FirestoppingDocuments and directives: 1111Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection13
Acceptable2

Stage

Inspection typeCount
Occupancy5
Framing4
Final3
Progress3
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2016-02-04BP2015-16054FinalDOCUMENTS CommercialAcceptable Add InspectionP. Eng. review required - alarm verification letter from the Engineer required.
2016-02-04BP2015-16054FinalFIRESTOPPINGAcceptable Add InspectionFire stopping to be an approved tested method. - provide ulc listing information
2016-02-04BP2015-16054FinalDIRECTIVESAcceptable Add InspectionFile complete upon receipt of documents
2014-10-31BP2014-02286OccupancyDIRECTIVESAcceptableWork is complete. Close file.
2014-08-01BP2014-03393OccupancyDIRECTIVESAcceptable Add InspectionOccupancy inspection of the third floor is complete. Partial occupancy has been granted for this floor. Fire stopping is complete in the rack room (12 penetrations). Call for final inspection.
2014-08-01BP2014-03393OccupancyFIRESTOPPINGAcceptable Add InspectionFirestopping Fire stop penetration at top of wall in the coffee bar( room 108).
2014-06-16BP2014-03393OccupancyFIRESTOPPINGAcceptable Add InspectionFirestopping Fire stop the three new cored holes in the slab within the rack in the rack room (#128). Three existing holes to be grouted in.
2014-06-16BP2014-03393OccupancyDIRECTIVESAcceptable Add InspectionPartial occupancy has been granted the 3rd and 2nd floor open office spaces.
2014-05-30BP2014-03393ProgressFIRESTOPPINGAcceptable Add InspectionFire stop shall be installed to the underside of the slab as well to prevent rock wool insulation from falling out and provide a continuity of the fire separation of the slab. Check at final.
2014-05-30BP2014-03393ProgressDIRECTIVESAcceptable Add InspectionProgress inspection of the fire stopping is complete. One penetration is still required to be fire stopped in the wall. Hole had to relocate due to obstructions below with mechanical system. Correct and continue. You may proceed to board. Call for final next.
2014-05-30BP2014-02286ProgressDIRECTIVESAcceptableDemolition work is complete. Close file.
2014-05-12BP2014-03393FramingDIRECTIVESAcceptable Add InspectionProgress inspection is complete for the main, 2nd & 3rd floor. Call for fire stopping inspection. Some of the walls were not framed at time of inspection, but there are no penetrations within. Contractor may proceed with framing and boarding of the walls.
2014-05-12BP2014-03393FramingDOCUMENTS CommercialAcceptable Add InspectionC1 and/or C2 letters required For final.
2014-05-12BP2014-03393FramingDOCUMENTS CommercialAcceptable Add InspectionRequire Fire Stop Test Design Summary For the through slab penetrations (rack room-mech.).

An inspection result is a record of one visit, not a verdict on the building. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 0 as of 2026-09-24

No City of Calgary business licence is recorded at this address or inside this parcel.

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 530 8 Ave SW108.7 m · built 1982 · Office · Downtown Commercial Core · 44 m
  • 707 5 St SW125.3 m · built 2015 · Office · Downtown Commercial Core · 88 m
  • 510 8 Ave SW27.5 m · built 1987 · Office/Retail · Downtown Commercial Core · 89 m
  • 601 5 St SW125.8 m · built 2007 · Office · Downtown Commercial Core · 112 m
  • Barron Building620 8 Ave SW12.3 m · built 1940 · Office · Downtown Commercial Core · 113 m
  • 607 8 Ave SW61 m · built 2007 · Office · Downtown Commercial Core · 124 m

Triad Building questions

Answers drawn from the record.

How tall is Triad Building?

The main structure on the parcel has a LiDAR roof height of 19.3 m in The City of Calgary’s 3D building data, a storey-equivalent of about 5 at 3.9 m per storey.

When was Triad Building built?

The City’s assessment roll records 1956 as the year of construction. The heritage inventory records 1956.

What is the assessed value of Triad Building?

The City of Calgary assesses this parcel at $2.8M in total on the 2026 roll, 546th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is Triad Building zoned?

The parcel is designated CR20-C20/R20, Commercial - Residential Core, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to Triad Building?

4th Street SW Station, 65 m in a straight line from the parcel centroid.

Who is in Triad Building?

No City of Calgary business licence is recorded at this address or inside the parcel. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has Triad Building been inspected?

The City publishes 15 inspection results against 3 permits here, between 2014-05-12 and 2016-02-04. 4 used a life-safety checklist such as fire separations, firestopping or emergency lighting. The most recent occupancy inspection was accepted on 2014-10-31. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at Triad Building?

2,239 scheduled transit trips call within 300 m of the parcel on a representative weekday, 320 of them in the morning peak, across 28 routes. The closest stop is SB 5 ST SW @ 7 AVE SW, 35 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at Triad Building?

The best-rated cycling facility within 400 m is a protected lane, 9 m away. The parcel fronts a Priority 1 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at Triad Building?

The City of Calgary's tariff record shows 123 paid on-street stalls in 22 zones within 200 m of the parcel, at $1.00 to $4.75 per hour. The closest is 8 Av SW, Fr 4 St SW To 5 St SW, 58 m away. Loading bays, taxi stands, accessible stalls and off-street parkades are not counted, and rates change, so confirm on the sign.

Is office space available at Triad Building?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.