COMMERCIALLY.caCommercially × Real BrokerOfficeBuildings.ca
OfficeBuildings.ca / Downtown Commercial Core · Calgary office building record
Downtown Commercial Core · Calgary office building record

615 Macleod Trail SE

Office · high-rise office building · built 1972 · 615 Macleod Trail SE

3D render of 615 Macleod Trail SE, a 62.8 m high-rise office building in Downtown Commercial Core, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 615 Macleod Trail SE highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

615 Macleod Trail SE is a 62.8 m high-rise office building in Downtown Commercial Core, Calgary, recorded on the City assessment roll as built in 1972. Its main structure is the 74th tallest office roof of the 775 ranked in this record, and 60th of 119 in Downtown Commercial Core. The City assesses the parcel at $12.4M on the 2026 roll, 169th of 822 sites in the record by assessed value. A Plus 15 walkway touches the parcel. The nearest CTrain platform is City Hall, 136 m away in a straight line. 1,389 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 33 building permits and 9 development permits on the parcel, the largest a $4.3M office permit for alteration, applied for in 2014.

Street-level 3D view of 615 Macleod Trail SE, Calgary, from the southeast
From the street: an eye-level view from the southeast, about 60 m away. Same model, same source; not a photograph.
LiDAR roof height62.8 m
Storey-equivalent (derived)16
Footprint3,543 m²
Parcel3,637 m²
Year built (roll)1972
Assessed 2026$12.4M
Structures on parcel2
Nearest CTrain136 m
Civic address
615 Macleod Trail SE, Calgary, AB
Community
Downtown Commercial Core (DNC)
City sub-property use
C101 Office · all Office sites
Land use district
CR20-C20/R20 — Commercial - Residential Core (Commercial - Core)
Height rank
#74 of 785 citywide · #60 of 111 in Downtown Commercial Core
Footprint to parcel
97% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 068228402
Coordinates
51.046725, -114.058892
Own or manage 615 Macleod Trail SE?

Slav Loban and the Commercially × Real Broker team give Calgary commercial owners a confidential pricing opinion based on the public record shown on this page: assessment history, permits, land use and the surrounding market. It is a broker’s opinion of value, not a formal appraisal. You do not need to be ready to list to start the conversation.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

62.8 mN20 mLiDAR roof outlines · City of Calgary · true scale
62.8 m · 2,774 m² · 9.8 m · 769 m²
4.5 m structure8.2 m structure9.4 m structure9.4 m structure9.5 m structure9.5 m structure10.1 m structure10.5 m structure16.9 m structure30.5 m structure32.2 m structure57.5 m structure82.3 m structure82.3 m structurePlus 15 — Bridge EnclosedPlus 15 — Open to SkyPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Bridge Open to SkyPlus 15 — EnclosedPlus 15 — Open to SkyPlus 15 — Open to SkyPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Bridge Open to SkyPlus 15 — Bridge EnclosedPlus 15 — Open to SkyPlus 15 — Open to SkyPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Bridge Enclosed9.8 m · 769 m² footprint62.8 m · 2,774 m² footprintCity Hall CTrainN50 mFootprints within 156 m · City of Calgary
Context within 156 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Downtown Commercial Core median and tallest, and against the city.

615 Macleod Trail SE62.8 mDowntown Commercial Core median66.2 mDowntown Commercial Core tallest243.2 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: City Hall, 136 m straight-line (route 201/202). Planned Green Line station 7 Avenue SW is 629 m away (Downtown Segment, per the City’s Green Line map).

Other office buildings near City Hall Station →

Plus 15

The City’s Plus 15 walkway geometry touches this parcel; the plan above shows the connected segments in lime. Confirm access points, hours and the interior route with the building.

Cycling

The best-rated cycling facility within 400 m of the parcel is a protected lane (Cycle Track), 221 m away.

Winter access

The parcel fronts a Priority 1 snow and ice clearing route, 13 m from its edge. Priority 1 routes are cleared first after a snowfall.

Accessible crossing

The nearest accessible pedestrian signal is at 7 Avenue and Macleod Trail, 72 m from the parcel.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

1,389 scheduled transit trips call within 300 m of this parcel on a representative weekday, 182 of them between 07:00 and 09:00, across 15 routes and 21 stops. The closest stop is NB Macleod TR @ 7 AVE SE, 71 m away.

Service classTrips on the service day
LRT672
REGULAR474
BRT118
MAX107
EXPRESS18

Routes: 1 Bowness/Forest Lawn · 4 Huntington · 5 North Haven · 10 City Hall/Southcentre · 24 Ogden · 90 Bridgeland/University of Calgary · 101 Inglewood · 117 McKenzie Towne Express · 131 East Bow Express · 151 New Brighton Express · 201 Red Line - Somerset - Bridlewood/Tuscany CTrain · 202 Blue Line - Saddletowne/69 Street CTrain · 302 BRT Southeast/City Centre · 500 Airport Express · MP MAX Purple City Centre/East Hills.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

Paid on-street parking within 200 m

127 metered stalls across 15 City parking zones touching this walking radius, at $1.00 to $4.50 per hour depending on zone and time of day. Maximum stay 15 to 120 minutes. Tariff zones 2, 4a, 4c.

Enforced 0710-1750 MON-FRI, 0910-1750 SAT; 0840-1520 MON-FRI, 0910-1750 SAT; 0910-1450 MON-FRI; 0910-1520 MON-SAT.

Closest zone

6 Av SE, Fr MacLeod Tr SE To 1 St SE — 26 m from the parcel, 7 parallel stalls, tariff zone 2, 60-minute maximum.

WhenRate
Mon-Fri 9:00 AM to 11:00 AM$3.00 per Hour
Mon-Fri 11:00 AM to 1:30 PM$3.50 per Hour
Mon-Fri 1:30 PM to 3:30 PM$2.50 per Hour
No Parking at this timeSee Street Signs
Saturday: 9:00 AM to 6:00 PM$1.00 per Hour
Sunday/Holidays:Free parking
Free parking to 7 AMSee Signs /Parking Restrictions

The City of Calgary On-Street Parking Zones with Rates, retrieved 2026-09-24. Counts cover Active paid parking zones only: loading bays, taxi stands, accessible stalls and permit-only zones are excluded, and off-street parkades are not in this dataset. Tariffs and enforcement hours change; confirm on the sign.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 068228402 · Office

Series not charted. The City’s published values for this roll number change by more than half or double between years, which usually signals a re-numbered, split or partially assessed account rather than a market movement. The published figures are listed below without a trend claim.

Published values by roll year
Roll yearAssessed valueChange
2005$12.6M—
2006$15.2M20.6%
2007$20.7M35.8%
2008$29.3M41.9%
2009$25.7M-12.4%
2010$17.4M-32.3%
2011$15.6M-10.5%
2012$16.9M8.6%
2013$37.3M120.8%
2014$72.3M93.9%
2015$75.2M4.0%
2016$62.5M-16.9%
2017$33.6M-46.2%
2018$15.1M-55.0%
2019$9.0M-40.6%
2020$8.2M-8.9%
2021$6.5M-20.9%
2022$5.2M-19.0%
2023$5.4M3.2%
2024$7.9M45.3%
2025$12.3M56.7%
2026$12.4M1.1%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

052012: 3 development permits2012: 7 building permits122013: 1 development permit2013: 9 building permits132014: 2 development permits2014: 3 building permits142015: 1 development permit2015: 6 building permits152016: 1 development permit2016: 2 building permits162017: 1 development permit2017: 1 building permit172018: 0 development permits2018: 1 building permit182019: 0 development permits2019: 1 building permit192020: 0 development permits2020: 3 building permits202021: 0 development permits2021: 0 building permits212022: 0 development permits2022: 0 building permits222023: 0 development permits2023: 0 building permits232024: 0 development permits2024: 0 building permits242025: 0 development permits2025: 0 building permits252026: 0 development permits2026: 0 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 9 since 2012

AppliedPermitCategory · descriptionStatus
2017-05-01DP2017-1750Renovations - Non-Residential
EXTERIOR RENOVATIONS: OFFICE (EXTERIOR AWNINGS - 2)
Released
Approval
2016-12-29DP2016-5303Change of Use - Permitted Use
CHANGE OF USE: RESTAURANT: LICENSED - SMALL
Released
Approval
2015-01-22DP2015-0239Change of Use - With Change to Site Plan
CHANGES TO SITE PLAN: MULTI-USE COMMERCIAL (NEW RAILINGS & PLANTERS)
Released
Approval
2014-04-21DP2014-1759Signs - Discretionary Use
NEW: SIGN - CLASS B (FASCIA SIGN)
Released
Approval
2014-01-10DP2014-0088Signs - Discretionary Use
NEW: SIGN - CLASS B (FASCIA SIGNS - 2), SIGN - CLASS D (PROJECTION SIGN); REVISIONS: EXTERIOR RENOVATIONS (CANOPY)
Released
Approval
2013-03-28DP2013-1288Signs - Discretionary Use
SIGN - CLASS B: FASCIA SIGN; SIGN - CLASS D: PROJECTING SIGN
Cancelled
2012-12-11DP2012-5207Renovations - Non-Residential
REVISION: EXTERIOR RENOVATIONS (STAIRWAY ENTRANCE FINISH)
Released
Approval
2012-10-25DP2012-4528Change of Use - Discretionary Use or Relaxations Required
CHANGE OF USE: RESTAURANT - FOOD SERVICE ONLY
Cancelled

Recent building permits 33 since 2012 · 23 in the City’s office class

AppliedPermitClass · workEst. costStatus
2020-10-30BP2020-159613402 - Office · Alteration
Modernization and refurbishment of the Kitchen/staff room within an existing office suite - 1000 615 MACLEOD TR SE
$50,000Issued Permit
2020-10-01BP2020-142194002 - Vacant · Alteration
Leasehold improvements
$100,000Issued Permit
2020-03-12BP2020-030542303 - Bridge (+15) · Alteration
Plus 15 Enclosed Walkway Restoration (Rocky Mountain Plaza)
$440,000Completed
2019-08-08BP2019-105903402 - Office · Alteration
extention of existing exterior conc wall and screen
$8,000Expired
2018-05-25BP2018-063373402 - Office · Alteration
Fire Alarm Upgrade at Rocky Mountain Plaza
$3,000Completed
2017-08-04BP2017-101323402 - Office · Alteration
Replacement of Two Exterior Canopies on the South and East Elevation of Rocky Mountain Plaza
$84,000Completed
2016-11-22BP2016-142533402 - Office · Alteration
Interior Alteration - US Consulate
$200,000Completed
2016-05-26BP2016-055914002 - Vacant · Alteration
group D - interior alterations - no tenant
$160,000Completed

Declared estimated project cost across all 33 non-residential building permits on the parcel since 2012: $14.9M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

164 inspection results are published against 29 of the 33 building permits on this parcel, from 2012-12-17 to 2021-03-16. The most recent occupancy inspection was accepted on 2021-03-16. 31 inspections used a life-safety checklist and 3 a barrier-free checklist.

What was inspected

0204060Fire separations and fire resistance: 77Fireseparations and fire resistanceFirestopping: 1717FirestoppingEmergency lighting and exit signs: 22Emergencylighting and exit signsBarrier-free: 33Barrier-freeAlarm and suppression: 11Alarmand suppressionDocuments and directives: 7777Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection95
Acceptable with Conditions34
Acceptable25
Not Acceptable10

Stage

Inspection typeCount
Progress102
Final44
Framing13
Occupancy5
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2021-03-16BP2020-03054OccupancyGeneralAcceptable- Building permit completed.
2021-03-15BP2020-03054OccupancyDIRECTIVESNot AcceptableFile complete upon receipt of documents - Please email the requested documentation to the undersigned.
2021-03-15BP2020-03054OccupancyDOCUMENTS CommercialNot AcceptableC1 and/or C2 letters required and the fire stop listings required as previously requested on September 22-2020.
2021-03-15BP2020-03054FinalDIRECTIVESNot AcceptableFile complete upon receipt of documents
2020-09-22BP2020-03054ProgressDOCUMENTS CommercialAcceptable Add InspectionC1 and/or C2 letters required , prior to occupancy.
2020-09-22BP2020-03054ProgressFIRESTOPPINGAcceptable Add Inspection3.1.9. Ensure all rough-ins will acept the fire stop system Fire stopping parkade 3 level to 1 level. And electrical room level 1. Ensure fire stopping can be viewed at inspection.
2020-09-22BP2020-03054ProgressEMERGENCY LIGHTING & EXIT SIGNSAcceptable Add Inspection*3.4.5.1. Exit sign is to be a green pictogram
2020-09-22BP2020-03054ProgressFIRESTOPPINGAcceptable Add InspectionFire stopping to be an approved tested method. Assemblies of fire stopping is required at final.
2020-09-22BP2020-03054ProgressDIRECTIVESAcceptable Add InspectionContractor to complete items, then may continue
2020-02-07BP2019-10590ProgressDIRECTIVESAcceptable Add InspectionCall 311 to book your inspection.
2018-06-11BP2018-06337FinalDIRECTIVESAcceptableFire alarm upgrades are complete. No deficiencies noted at time of inspection. Received fire alarm verification. Permit file closed.
2017-12-15BP2017-10132FinalDIRECTIVESAcceptableReceived P. Eng review letter. File closed.
2017-11-30BP2017-10132FinalDOCUMENTS CommercialAcceptable Add InspectionP. Eng. review required for the as built.
2017-11-30BP2017-10132FinalDIRECTIVESAcceptable Add InspectionConstruction of two exterior canopies are complete.

An inspection result is a record of one visit, not a verdict on the building. 10 of these 164 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 2 as of 2026-09-24

Licensed businessAddressLicence typeStatusLicensed since
Stone Bowl615 Macleod Trail SEAlcohol Beverage Sales (Restaurant), Food Service - Premises (Seating)Licensed2014
Tim Hortons #5029615 Macleod Trail SEFood Service - Premises (Seating), Retail Dealer - PremisesLicensed2013

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

615 Macleod Trail SE questions

Answers drawn from the record.

How tall is 615 Macleod Trail SE?

The main structure on the parcel has a LiDAR roof height of 62.8 m in The City of Calgary’s 3D building data, a storey-equivalent of about 16 at 3.9 m per storey.

When was 615 Macleod Trail SE built?

The City’s assessment roll records 1972 as the year of construction.

What is the assessed value of 615 Macleod Trail SE?

The City of Calgary assesses this parcel at $12.4M in total on the 2026 roll, 169th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 615 Macleod Trail SE zoned?

The parcel is designated CR20-C20/R20, Commercial - Residential Core, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 615 Macleod Trail SE?

City Hall Station, 136 m in a straight line from the parcel centroid.

Who is in 615 Macleod Trail SE?

The City of Calgary business licence register lists 2 licensed businesses at this address or inside the parcel as of 2026-09-24, shown in the occupiers section. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 615 Macleod Trail SE been inspected?

The City publishes 164 inspection results against 29 permits here, between 2012-12-17 and 2021-03-16. 31 used a life-safety checklist such as fire separations, firestopping or emergency lighting. 3 used the barrier-free checklist. The most recent occupancy inspection was accepted on 2021-03-16. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 615 Macleod Trail SE?

1,389 scheduled transit trips call within 300 m of the parcel on a representative weekday, 182 of them in the morning peak, across 15 routes. The closest stop is NB Macleod TR @ 7 AVE SE, 71 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at 615 Macleod Trail SE?

The best-rated cycling facility within 400 m is a protected lane, 221 m away. The parcel fronts a Priority 1 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at 615 Macleod Trail SE?

The City of Calgary's tariff record shows 127 paid on-street stalls in 15 zones within 200 m of the parcel, at $1.00 to $4.50 per hour. The closest is 6 Av SE, Fr MacLeod Tr SE To 1 St SE, 26 m away. Loading bays, taxi stands, accessible stalls and off-street parkades are not counted, and rates change, so confirm on the sign.

Is office space available at 615 Macleod Trail SE?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.