COMMERCIALLY.caCommercially × Real BrokerOfficeBuildings.ca
OfficeBuildings.ca / Eau Claire · Calgary office building record
Eau Claire · Calgary office building record

Canterra Tower

Office · office tower · built 1987 · 400 3 Ave SW

3D render of Canterra Tower (400 3 Ave SW), a 172.4 m office tower in Eau Claire, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with Canterra Tower highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

Canterra Tower (400 3 Ave SW) is a 172.4 m office tower in Eau Claire, Calgary, recorded on the City assessment roll as built in 1987. Its main structure is the 6th tallest office roof of the 775 ranked in this record, and the tallest in Eau Claire. The City assesses the parcel at $114.0M on the 2026 roll, 20th of 822 sites in the record by assessed value. A Plus 15 walkway touches the parcel. The nearest CTrain platform is 4th Street SW, 480 m away in a straight line. 425 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 99 building permits and 4 development permits on the parcel, the largest a $2.8M office permit for alteration, applied for in 2023.

LiDAR roof height172.4 m
Storey-equivalent (derived)44
Footprint2,753 m²
Parcel6,487 m²
Year built (roll)1987
Assessed 2026$114.0M
Structures on parcel3
Nearest CTrain480 m
Civic address
400 3 Ave SW, Calgary, AB
Community
Eau Claire (EAU)
City sub-property use
C101 Office · all Office sites
Land use district
DC — Direct Control (Direct Control)
Height rank
#6 of 785 citywide · #1 of 8 in Eau Claire
Footprint to parcel
42% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 067235101
Coordinates
51.050994, -114.070784
Own or manage Canterra Tower?

Slav Loban and the Commercially × Real Broker team give Calgary commercial owners a confidential pricing opinion based on the public record shown on this page: assessment history, permits, land use and the surrounding market. It is a broker’s opinion of value, not a formal appraisal. You do not need to be ready to list to start the conversation.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

172.4 mN20 mLiDAR roof outlines · City of Calgary · true scale
172.4 m · 2,146 m² · 17.4 m · 358 m² · 9.5 m · 249 m²
5.6 m structure7.8 m structure8.2 m structure9.4 m structure13.3 m structure13.8 m structure13.8 m structure14.4 m structure16.9 m structure56.7 m structure101.9 m structure124.9 m structure143.4 m structure166.1 m structurePlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — Open to SkyPlus 15 — UnclassifiedPlus 15 — Open to SkyPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge Open to SkyPlus 15 — Bridge Open to SkyPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — UnclassifiedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Open to SkyPlus 15 — Bridge EnclosedPlus 15 — Open to SkyPlus 15 — Enclosed9.5 m · 249 m² footprint17.4 m · 358 m² footprint172.4 m · 2,146 m² footprintN50 mFootprints within 179 m · City of Calgary
Context within 179 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Eau Claire median and tallest, and against the city.

Canterra Tower172.4 mEau Claire median102.1 mEau Claire tallest172.4 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: 4th Street SW, 480 m straight-line (route 201/202). Planned Green Line station Eau Claire is 254 m away (TBD, per the City’s Green Line map).

Other office buildings near 4th Street SW Station →

Plus 15

The City’s Plus 15 walkway geometry touches this parcel; the plan above shows the connected segments in lime. Confirm access points, hours and the interior route with the building.

Cycling

The best-rated cycling facility within 400 m of the parcel is a protected lane (Cycle Track), 153 m away.

Winter access

The parcel fronts a Priority 1 snow and ice clearing route, 11 m from its edge. Priority 1 routes are cleared first after a snowfall.

Accessible crossing

The nearest accessible pedestrian signal is at 3 Avenue and 3 Street, 76 m from the parcel. The closest signalised crossing, 2 Avenue and 3 Street at 71 m, has no accessible signal recorded.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

425 scheduled transit trips call within 300 m of this parcel on a representative weekday, 49 of them between 07:00 and 09:00, across 15 routes and 9 stops. The closest stop is EB 2 AV SW @ 3 ST SW, 96 m away.

Service classTrips on the service day
REGULAR337
MAX74
EXPRESS14

Routes: 1 Bowness/Forest Lawn · 2 Mount Pleasant/Killarney 17 Av SW · 7 Marda Loop · 13 Altadore · 15 Deerfoot Meadows · 62 Hidden Valley · 64 MacEwan · 109 Harvest Hills · 116 Coventry Hills · 117 McKenzie Towne Express · 131 East Bow Express · 142 Panorama · 151 New Brighton Express · 500 Airport Express · MY MAX Yellow Woodpark/City Centre.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

Paid on-street parking within 200 m

451 metered stalls across 61 City parking zones touching this walking radius, at $1.00 to $4.50 per hour depending on zone and time of day. Maximum stay 20 to 180 minutes. Tariff zones 4a, 4b, 5.

Enforced 0710-1750 MON-FRI, 0910-1750 SAT; 0710-1750 MON-FRI,0910-1750 SAT; 0840-1520 MON-FRI, 0910-1750 SAT; 0910-1520 MON-FRI.

Closest zone

3 Av SW, Fr 3 St SW To 4 St SW — 4 m from the parcel, 6 parallel stalls, tariff zone 5, 120-minute maximum.

WhenRate
Mon-Fri 9:00 AM to 11:00 AM$4.00 per Hour
Mon-Fri 11:00 AM to 1:30 PM$4.25 per Hour
Mon-Fri 1:30 PM to 3:30 PM$3.25 per Hour
Mon-Fri 3:30 PM to 6:00 PM$2.25 per Hour
Saturday: 9:00 AM to 6:00 PM$1.00 per Hour
Sunday/Holidays:Free parking
Free parking to 9 AMSee Signs /Parking Restrictions

The City of Calgary On-Street Parking Zones with Rates, retrieved 2026-09-24. Counts cover Active paid parking zones only: loading bays, taxi stands, accessible stalls and permit-only zones are excluded, and off-street parkades are not in this dataset. Tariffs and enforcement hours change; confirm on the sign.

Named building record

Public-domain building facts from Wikidata attached by location. Where a stated height differs from the LiDAR roof, the difference usually reflects spires, screens or datum.

Name
Canterra Tower
Description
skyscraper
Stated height
177 m (LiDAR roof 172.4 m)
Floors
45
Opened
1988
Architect
WZMH Architects
Style
postmodern architecture
Identifier
Wikidata Q1033771 (CC0)

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 067235101 · Office

$0$148.3M$296.6M$444.8M$593.1M200520082011201420172020202320262005 roll: $203.2M2006 roll: $282.0M2007 roll: $361.0M2008 roll: $502.3M2009 roll: $485.7M2010 roll: $412.9M2011 roll: $361.6M2012 roll: $360.5M2013 roll: $471.3M2014 roll: $514.2M2015 roll: $549.2M2016 roll: $512.8M2017 roll: $447.2M2018 roll: $428.4M2019 roll: $320.8M2020 roll: $284.5M2021 roll: $245.0M2022 roll: $188.5M2023 roll: $217.2M2024 roll: $126.6M2025 roll: $115.0M2026 roll: $114.0M$114.0M (2026)
Published values by roll year
Roll yearAssessed valueChange
2005$203.2M—
2006$282.0M38.8%
2007$361.0M28.0%
2008$502.3M39.1%
2009$485.7M-3.3%
2010$412.9M-15.0%
2011$361.6M-12.4%
2012$360.5M-0.3%
2013$471.3M30.7%
2014$514.2M9.1%
2015$549.2M6.8%
2016$512.8M-6.6%
2017$447.2M-12.8%
2018$428.4M-4.2%
2019$320.8M-25.1%
2020$284.5M-11.3%
2021$245.0M-13.9%
2022$188.5M-23.1%
2023$217.2M15.2%
2024$126.6M-41.7%
2025$115.0M-9.2%
2026$114.0M-0.9%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

05102012: 0 development permits2012: 7 building permits122013: 1 development permit2013: 5 building permits132014: 0 development permits2014: 9 building permits142015: 0 development permits2015: 6 building permits152016: 2 development permits2016: 7 building permits162017: 0 development permits2017: 7 building permits172018: 0 development permits2018: 10 building permits182019: 1 development permit2019: 6 building permits192020: 0 development permits2020: 3 building permits202021: 0 development permits2021: 6 building permits212022: 0 development permits2022: 2 building permits222023: 0 development permits2023: 7 building permits232024: 0 development permits2024: 14 building permits242025: 0 development permits2025: 7 building permits252026: 0 development permits2026: 3 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 4 since 2012

AppliedPermitCategory · descriptionStatus
2019-03-28DP2019-1462Change of Use - With Change to Site Plan
CHANGES TO SITE PLAN: MULTI-USE COMMERCIAL (LANDSCAPE)
Released
Approval
2016-11-17DP2016-4719Signs - Discretionary Use
NEW: SIGN - CLASS C (FREESTANDING SIGN)
Cancelled
2016-09-06DP2016-3656Signs - Discretionary Use
NEW: SIGN - CLASS 1 & 2 (WINDOW IDENTIFICATION SIGNS - 18, FREESTANDING IDENTIFICATION SIGN)
Released
Approval
2013-07-15DP2013-2870Change of Use - Discretionary Use or Relaxations Required
CHANGE OF USE: OFFICES
Released
Approval

Recent building permits 99 since 2012 · 87 in the City’s office class

AppliedPermitClass · workEst. costStatus
2026-08-05BP2026-147013402 - Office · Fire/ Security Alarm
Fire alarm alterations
$171,946Issued Permit
2026-04-13BP2026-058443402 - Office · Alteration
Interior alterations
$20,000Issued Permit
2026-04-06BP2026-052943402 - Office · Alteration
Interior Alterations
$185,000Completed
2025-12-05BP2025-232453402 - Office · Alteration
Interior Alterations
$2.1MIssued Permit
2025-10-15BP2025-201943402 - Office · Alteration
Interior alteration
$300,000Completed
2025-07-16BP2025-137843402 - Office · Alteration
Interior Alterations
$400,000Completed
2025-07-16BP2025-137523402 - Office · Alteration
Interior alterations - CNRL - 400 3rd Ave - North Tower Floor 20
$682,000Completed
2025-07-16BP2025-138023402 - Office · Alteration
Interior Partition Removal
$8,000Completed

Declared estimated project cost across all 99 non-residential building permits on the parcel since 2012: $43.2M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

368 inspection results are published against 79 of the 99 building permits on this parcel, from 2012-04-16 to 2026-08-24. The most recent occupancy inspection was accepted on 2023-12-07. 38 inspections used a life-safety checklist and 1 a barrier-free checklist.

What was inspected

0100200Fire separations and fire resistance: 77Fireseparations and fire resistanceFirestopping: 1414FirestoppingEmergency lighting and exit signs: 1212Emergencylighting and exit signsBarrier-free: 11Barrier-freeAlarm and suppression: 11Alarmand suppressionDocuments and directives: 231231Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection216
Acceptable75
Acceptable with Conditions55
Not Acceptable22

Stage

Inspection typeCount
Progress240
Final82
Occupancy46
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2026-08-24BP2025-13752ProgressAll DirectivesAcceptableMechanical compliance is required prior to occupancy.
2026-08-24BP2025-13752ProgressAll DirectivesAcceptableNo deficiencies noted. No further building inspections are required.
2026-08-24BP2025-11377ProgressAll DirectivesAcceptableMechanical compliance is required prior to occupancy. - Ensure Mechanical Permit has been closed.
2026-08-24BP2025-11377ProgressAll DirectivesAcceptableNo deficiencies noted. No further building inspections are required.
2026-08-24BP2025-03370ProgressAll DirectivesAcceptableNo deficiencies noted. No further building inspections are required.
2026-08-24BP2025-03370FinalAll DirectivesAcceptable with ConditionsMechanical compliance is required prior to occupancy. - Ensure Mechanical Permit has been closed.
2026-08-07BP2025-03370ProgressAll DirectivesNot AcceptableCustomer is advised to book a final inspection prior to occupancy.
2026-07-24BP2025-13802ProgressAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed.
2026-07-24BP2025-13802FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed.
2026-07-22BP2025-13802ProgressAll DirectivesNot AcceptableCustomer is advised to book a final inspection prior to occupancy.
2026-07-08BP2026-05294FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed.
2026-03-10BP2025-13784FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed.
2026-02-12BP2025-13784ProgressAll DocumentsAcceptableNBC AE Division C 2.4.2. Schedules of Professional Involvement
2026-02-12BP2025-13784ProgressAll DocumentsAcceptableNBC AE Division C 2.4.1.3. Fire Suppression System Designs (Sprinkler VI)

An inspection result is a record of one visit, not a verdict on the building. 22 of these 368 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 4 as of 2026-09-24

Licensed businessAddressLicence typeStatusLicensed since
Analog Coffee 400 Third400 3 Ave SWFood Service - Premises (Seating), Retail Dealer - PremisesLicensed2023
Canterra Printing House400 3 Ave SWManufacturerLicensed2001
Marcello'S Market & Deli400 3 Ave SWFood Service - PremisesRenewal pending2020
Prime Projects400 3 Ave SWContractor (No Provincial Licence Required)Licensed2018

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • Shell Centre400 4 Ave SW143.4 m · built 1976 · Office · Downtown Commercial Core · 105 m
  • 440 2 Ave SW101.9 m · built 2000 · Office · Eau Claire · 115 m
  • Centennial Place555 2 Ave SW166.1 m · built 2010 · Office · Eau Claire · 121 m
  • 500 4 Ave SW124.9 m · built 1973 · Office · Downtown Commercial Core · 149 m
  • 215 2 St SW155.6 m · built 2013 · Office · Eau Claire · 182 m
  • 435 4 Ave SW33.7 m · built 1977 · Office · Downtown Commercial Core · 190 m

Canterra Tower questions

Answers drawn from the record.

How tall is Canterra Tower?

The main structure on the parcel has a LiDAR roof height of 172.4 m in The City of Calgary’s 3D building data, a storey-equivalent of about 44 at 3.9 m per storey. Wikidata records an architectural height of 177 m. Wikidata records 45 floors.

When was Canterra Tower built?

The City’s assessment roll records 1987 as the year of construction. Wikidata records 1988 as the opening year.

What is the assessed value of Canterra Tower?

The City of Calgary assesses this parcel at $114.0M in total on the 2026 roll, 20th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is Canterra Tower zoned?

The parcel is designated DC, Direct Control, under the City of Calgary Land Use Bylaw. Under Direct Control the permitted uses are set by the site’s own bylaw rather than by a standard district. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to Canterra Tower?

4th Street SW Station, 480 m in a straight line from the parcel centroid.

Who is in Canterra Tower?

The City of Calgary business licence register lists 4 licensed businesses at this address or inside the parcel as of 2026-09-24, shown in the occupiers section. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has Canterra Tower been inspected?

The City publishes 368 inspection results against 79 permits here, between 2012-04-16 and 2026-08-24. 38 used a life-safety checklist such as fire separations, firestopping or emergency lighting. 1 used the barrier-free checklist. The most recent occupancy inspection was accepted on 2023-12-07. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at Canterra Tower?

425 scheduled transit trips call within 300 m of the parcel on a representative weekday, 49 of them in the morning peak, across 15 routes. The closest stop is EB 2 AV SW @ 3 ST SW, 96 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at Canterra Tower?

The best-rated cycling facility within 400 m is a protected lane, 153 m away. The parcel fronts a Priority 1 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at Canterra Tower?

The City of Calgary's tariff record shows 451 paid on-street stalls in 61 zones within 200 m of the parcel, at $1.00 to $4.50 per hour. The closest is 3 Av SW, Fr 3 St SW To 4 St SW, 4 m away. Loading bays, taxi stands, accessible stalls and off-street parkades are not counted, and rates change, so confirm on the sign.

Is office space available at Canterra Tower?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.