| 2019-08-22 | BP2019-03515 | Occupancy | — | Acceptable Add Inspection | All Trade Inspections, including Fire and Health are to be completed |
| 2019-08-22 | BP2019-03515 | Occupancy | DOCUMENTS Commercial | Acceptable Add Inspection | ENgineers acceptance letter required for interior stairwell construction. |
| 2019-06-13 | BP2019-03515 | Framing | FIRE ALARM SYSTEM | Acceptable Add Inspection | Pull stations are required at exit doors |
| 2019-06-13 | BP2019-03515 | Framing | DOCUMENTS Commercial | Acceptable Add Inspection | Occupancy Application To be signed off by all required Inspectors, including Fire and Health, prior to calling for Building Occupancy |
| 2019-06-13 | BP2019-03515 | Framing | DOCUMENTS Commercial | Acceptable Add Inspection | P. Eng. review required For structural alterations to floor to permit stair access to second floor. |
| 2019-06-13 | BP2019-03515 | Framing | DOCUMENTS Commercial | Acceptable Add Inspection | A separate Mechanical Permit may be required, it is unclear that the new Mechanical system in this tenancy does not appear to have been inspected as part of the Base Building Permits issued. Contractor to confirm that the system has been inspected prior to covering. |
| 2019-05-24 | BP2019-01381 | Occupancy | FIRE RESISTANCE & FIRE SEPARATIONS PT 3 | Acceptable with Conditions | 3.1.9 Service penetrations must be tightly sealed around the basement ceilings service penetrations. |
| 2019-05-21 | BP2019-01381 | Progress | FIRE RESISTANCE & FIRE SEPARATIONS PT 3 | Acceptable Add Inspection | Fire resistance and Fire Separations as per the building permit scope of work, please provide a 1 hour fire resistance rating to the existing main floor structure. Fire rated gypsum board is required, as discussed on site. |
| 2019-05-21 | BP2019-01381 | Progress | DOCUMENTS Commercial | Acceptable Add Inspection | Fire Alarm Verification - if work was done to the fire alarm. |
| 2019-05-21 | BP2019-01381 | Progress | DOCUMENTS Commercial | Acceptable Add Inspection | Sprinkler Verification - if work was done to the sprinklers. |
| 2019-05-21 | BP2019-01381 | Progress | DIRECTIVES | Acceptable Add Inspection | Correct items and RECALL inspection - interior |
| 2019-04-01 | BP2018-15692 | Framing | DIRECTIVES | Acceptable Add Inspection | Note: This building permit is for base building only. Please ensure new tenants/shops have new building permits obtained for occupancy. |
| 2019-04-01 | BP2018-15692 | Framing | DOCUMENTS Commercial | Acceptable Add Inspection | P. Eng. review required for the new door opening in the basement level. |
| 2019-04-01 | BP2018-15692 | Framing | DOCUMENTS Commercial | Acceptable Add Inspection | Fire Alarm Verification at final inspection. |