COMMERCIALLY.caOfficeBuildings.ca
OfficeBuildings.ca / Deerfoot Business Centre · Calgary office building record
Deerfoot Business Centre · Calgary office building record

7575 8 St NE

Office use recorded by City permits (roll code X034) · mid-rise office building · built 2000 · 7575 8 St NE

3D render of 7575 8 St NE, a 17 m mid-rise office building in Deerfoot Business Centre, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 7575 8 St NE highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

7575 8 St NE is a 17 m mid-rise office building in Deerfoot Business Centre, Calgary, recorded on the City assessment roll as built in 2000. Its main structure is the 310th tallest office roof of the 775 ranked in this record, and 4th of 11 in Deerfoot Business Centre. The City assesses the parcel at $9.0M on the 2026 roll, 214th of 822 sites in the record by assessed value. 102 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 4 building permits and 0 development permits on the parcel, the largest a $675,000 office permit for alteration, applied for in 2017.

LiDAR roof height17 m
Storey-equivalent (derived)4
Footprint2,441 m²
Parcel17,111 m²
Year built (roll)2000
Assessed 2026$9.0M
Structures on parcel1
Nearest CTrain4.9 km
Civic address
7575 8 St NE, Calgary, AB
Community
Deerfoot Business Centre (DBC)
City sub-property use
X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
Land use district
I-B — Industrial - Business (Industrial)
Height rank
#310 of 785 citywide · #4 of 10 in Deerfoot Business Centre
Footprint to parcel
14% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 009023516
Coordinates
51.11922, -114.044613
Why this building is in the record

The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 13 permits in the City’s Office classes between 2000 and 2024, 1 of them for new office construction. The building may hold other uses as well. Every building included this way.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

17 mN20 mLiDAR roof outlines · City of Calgary · true scale
17 m · 2,441 m²
4.5 m structure7.4 m structure8.5 m structure8.9 m structure10.5 m structure17 m · 2,441 m² footprintN50 mFootprints within 234 m · City of Calgary
Context within 234 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Deerfoot Business Centre median and tallest, and against the city.

7575 8 St NE17 mDeerfoot Business Centre median16.2 mDeerfoot Business Centre tallest23.9 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: McKnight Westwinds, 4.9 km straight-line (route 202).

Plus 15

Outside the Plus 15 network area.

Cycling

No mapped bikeway lies within 400 m of the parcel.

Winter access

The parcel fronts a Priority 2 snow and ice clearing route, 8 m from its edge. Priority 2 routes are cleared after the Priority 1 network.

Accessible crossing

No accessible pedestrian signal lies within 400 m of the parcel.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

102 scheduled transit trips call within 300 m of this parcel on a representative weekday, 16 of them between 07:00 and 09:00, across 1 route and 2 stops. The closest stop is EB 72 AV NE @ 8 ST NE, 168 m away.

Service classTrips on the service day
REGULAR102

Routes: 32 Huntington/Sunridge.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 009023516 · X034

$0$7.8M$15.6M$23.4M$31.1M200520082011201420172020202320262005 roll: $11.0M2006 roll: $11.9M2007 roll: $15.8M2008 roll: $17.3M2009 roll: $20.9M2010 roll: $16.2M2011 roll: $17.7M2012 roll: $15.2M2013 roll: $20.5M2014 roll: $21.2M2015 roll: $28.8M2016 roll: $26.6M2017 roll: $23.8M2018 roll: $18.2M2019 roll: $13.1M2020 roll: $13.1M2021 roll: $13.0M2022 roll: $9.2M2023 roll: $8.3M2024 roll: $8.8M2025 roll: $9.0M2026 roll: $9.0M$9.0M (2026)
Published values by roll year
Roll yearAssessed valueChange
2005$11.0M—
2006$11.9M8.4%
2007$15.8M32.6%
2008$17.3M9.6%
2009$20.9M20.7%
2010$16.2M-22.5%
2011$17.7M9.2%
2012$15.2M-14.1%
2013$20.5M34.8%
2014$21.2M3.6%
2015$28.8M36.0%
2016$26.6M-7.8%
2017$23.8M-10.5%
2018$18.2M-23.4%
2019$13.1M-28.1%
2020$13.1M-0.1%
2021$13.0M-0.5%
2022$9.2M-29.8%
2023$8.3M-8.9%
2024$8.8M6.1%
2025$9.0M1.2%
2026$9.0M0.3%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

0122012: 0 development permits2012: 0 building permits122013: 0 development permits2013: 0 building permits132014: 0 development permits2014: 0 building permits142015: 0 development permits2015: 0 building permits152016: 0 development permits2016: 0 building permits162017: 0 development permits2017: 1 building permit172018: 0 development permits2018: 0 building permits182019: 0 development permits2019: 0 building permits192020: 0 development permits2020: 0 building permits202021: 0 development permits2021: 0 building permits212022: 0 development permits2022: 0 building permits222023: 0 development permits2023: 1 building permit232024: 0 development permits2024: 2 building permits242025: 0 development permits2025: 0 building permits252026: 0 development permits2026: 0 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 0 since 2012

None located on this parcel since 2012.

Recent building permits 4 since 2012 · 4 in the City’s office class

AppliedPermitClass · workEst. costStatus
2024-09-11BP2024-192273402 - Office · Fire/ Security Alarm
Fire Alarm Panel Replacement - Duncan Building
$20,000Completed
2024-02-09BP2024-022413402 - Office · Alteration
Leasehold Improvements
$155,000Completed
2023-01-31BP2023-012113402 - Office · Fire/ Security Alarm
Lower 15 existing manual pull stations
$8,000Completed
2017-01-17BP2017-004033402 - Office · Alteration
Group D Office
$675,000Completed

Declared estimated project cost across all 4 non-residential building permits on the parcel since 2012: $858,000. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

7 inspection results are published against 4 of the 4 building permits on this parcel, from 2017-04-21 to 2025-06-13.

What was inspected

01234Documents and directives: 44Documentsand directives

Result of each visit

OutcomeInspections
Acceptable5
Not Acceptable2

Stage

Inspection typeCount
Progress6
Final1
The 7 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2025-06-13BP2024-02241ProgressAll DirectivesAcceptableNo further building inspections required permission to return washrooms for the clients use.
2025-06-05BP2024-02241ProgressAll DirectivesNot AcceptableInspections can be booked at inspections.calgary.ca ecall the Building Inspection, and on the day of the inspection have the required document, and Proof that all trade permits are completed, ready to email to the building safety codes officer doing the inspection on that day. File can be completed when the required do
2025-06-05BP2024-02241ProgressAll DocumentsNot AcceptableNBC AE Division C 2.4.2. Schedules of Professional Involvement All schedules must have the building permit number, address, and the professionals stamp / seal.
2024-10-25BP2024-19227ProgressAll DirectivesAcceptableNo further building inspections required.
2023-06-05BP2023-01211ProgressGeneral Inspection ObservationsAcceptableTenant Improvement Inspections Observations were: Inspection called, scope of work is for 15 manual pull stations dropped, as noted in the engineers letter.Work is completed. Existing pull stations extended (dropped). Received fire alarm verification.
2023-06-05BP2023-01211ProgressField Level Hazard Assessment (FLHA)AcceptableField Level Hazard Assessment: No work site safety issues noted. Guards in place. PPE worn. Weather sunny.
2017-04-21BP2017-00403Final—AcceptableWork is complete. Close File.

An inspection result is a record of one visit, not a verdict on the building. 2 of these 7 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 0 as of 2026-09-24

No City of Calgary business licence is recorded at this address or inside this parcel.

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 7315 8 St NE8.5 m · built 1999 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 113 m
  • 7661 10 St NE7.4 m · built 1999 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 193 m
  • 7326 10 St NE15.5 m · built 1999 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 410 m
  • 1120 68 Ave NEheight n/a · built 1997 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 532 m
  • 6815 8 St NE23.9 m · built 1981 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 555 m
  • 105 7136 11 St NE17 m · built 2017 · Office Condo · 5 accounts · Deerfoot Business Centre · 591 m

7575 8 St NE questions

Answers drawn from the record.

How tall is 7575 8 St NE?

The main structure on the parcel has a LiDAR roof height of 17 m in The City of Calgary’s 3D building data, a storey-equivalent of about 4 at 3.9 m per storey.

When was 7575 8 St NE built?

The City’s assessment roll records 2000 as the year of construction.

What is the assessed value of 7575 8 St NE?

The City of Calgary assesses this parcel at $9.0M in total on the 2026 roll, 214th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 7575 8 St NE zoned?

The parcel is designated I-B, Industrial - Business, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 7575 8 St NE?

McKnight Westwinds Station, 4.9 km in a straight line from the parcel centroid.

Who is in 7575 8 St NE?

No City of Calgary business licence is recorded at this address or inside the parcel. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 7575 8 St NE been inspected?

The City publishes 7 inspection results against 4 permits here, between 2017-04-21 and 2025-06-13. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 7575 8 St NE?

102 scheduled transit trips call within 300 m of the parcel on a representative weekday, 16 of them in the morning peak, across 1 route. The closest stop is EB 72 AV NE @ 8 ST NE, 168 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at 7575 8 St NE?

No mapped bikeway lies within 400 m. The parcel fronts a Priority 2 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at 7575 8 St NE?

No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.

Is office space available at 7575 8 St NE?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.