COMMERCIALLY.caOfficeBuildings.ca
OfficeBuildings.ca / Deerfoot Business Centre · Calgary office building record
Deerfoot Business Centre · Calgary office building record

1120 68 Ave NE

Office use recorded by City permits (roll code X034) · building · built 1997 · 1120 68 Ave NE

3D render of 1120 68 Ave NE, a building in Deerfoot Business Centre, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 1120 68 Ave NE highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

1120 68 Ave NE is a building in Deerfoot Business Centre, Calgary, recorded on the City assessment roll as built in 1997. The City assesses the parcel at $9.8M on the 2026 roll, 201st of 822 sites in the record by assessed value. 102 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 8 building permits and 4 development permits on the parcel, the largest a $2.0M indust/manufacture misc. permit for alteration, applied for in 2012.

LiDAR roof height—
Storey-equivalent (derived)—
Footprint0 m²
Parcel23,111 m²
Year built (roll)1997
Assessed 2026$9.8M
Structures on parcel0
Nearest CTrain4.4 km
Civic address
1120 68 Ave NE, Calgary, AB
Community
Deerfoot Business Centre (DBC)
City sub-property use
X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
Land use district
I-B — Industrial - Business (Industrial)
Height rank
—
Footprint to parcel
0% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 009023201
Coordinates
51.11653, -114.03831
Why this building is in the record

The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 7 permits in the City’s Office classes between 2007 and 2026. The building may hold other uses as well. Every building included this way.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

No LiDAR structure attributed to this parcel.

4 m structure8.6 m structure9.8 m structure10.8 m structure15.5 m structure17 m structureN50 mFootprints within 257 m · City of Calgary
Context within 257 m. Grey footprints darken with height; lime is the Plus 15 network.

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: McKnight Westwinds, 4.4 km straight-line (route 202).

Plus 15

Outside the Plus 15 network area.

Cycling

No mapped bikeway lies within 400 m of the parcel.

Winter access

The parcel fronts a Priority 2 snow and ice clearing route, 8 m from its edge. Priority 2 routes are cleared after the Priority 1 network.

Accessible crossing

No accessible pedestrian signal lies within 400 m of the parcel.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

102 scheduled transit trips call within 300 m of this parcel on a representative weekday, 16 of them between 07:00 and 09:00, across 1 route and 5 stops. The closest stop is NB 10 ST NE @ 68 AV NE, 79 m away.

Service classTrips on the service day
REGULAR102

Routes: 32 Huntington/Sunridge.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 009023201 · X034

$0$6.7M$13.4M$20.1M$26.7M200520082011201420172020202320262005 roll: $7.7M2006 roll: $8.2M2007 roll: $14.4M2008 roll: $16.4M2009 roll: $18.0M2010 roll: $17.6M2011 roll: $16.2M2012 roll: $16.9M2013 roll: $19.7M2014 roll: $21.2M2015 roll: $24.0M2016 roll: $24.8M2017 roll: $19.5M2018 roll: $19.2M2019 roll: $10.3M2020 roll: $10.0M2021 roll: $7.2M2022 roll: $5.5M2023 roll: $5.2M2024 roll: $6.5M2025 roll: $5.0M2026 roll: $9.8M$9.8M (2026)
Published values by roll year
Roll yearAssessed valueChange
2005$7.7M—
2006$8.2M6.4%
2007$14.4M76.7%
2008$16.4M13.7%
2009$18.0M10.1%
2010$17.6M-2.5%
2011$16.2M-7.7%
2012$16.9M4.0%
2013$19.7M16.6%
2014$21.2M7.7%
2015$24.0M13.3%
2016$24.8M3.2%
2017$19.5M-21.4%
2018$19.2M-1.6%
2019$10.3M-46.0%
2020$10.0M-3.5%
2021$7.2M-27.9%
2022$5.5M-23.6%
2023$5.2M-5.5%
2024$6.5M25.0%
2025$5.0M-23.2%
2026$9.8M95.4%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

0122012: 1 development permit2012: 2 building permits122013: 0 development permits2013: 0 building permits132014: 0 development permits2014: 0 building permits142015: 0 development permits2015: 0 building permits152016: 0 development permits2016: 1 building permit162017: 0 development permits2017: 1 building permit172018: 0 development permits2018: 0 building permits182019: 0 development permits2019: 0 building permits192020: 0 development permits2020: 0 building permits202021: 0 development permits2021: 0 building permits212022: 0 development permits2022: 1 building permit222023: 0 development permits2023: 1 building permit232024: 1 development permit2024: 0 building permits242025: 0 development permits2025: 1 building permit252026: 2 development permits2026: 1 building permit26Development permitsBuilding permits (non-residential)

Recent development permits 4 since 2012

AppliedPermitCategory · descriptionStatus
2026-06-12DP2026-03436Industrial - Other Areas
NEW: GENERAL INDUSTRIAL - LIGHT (2 BUILDINGS)
Hold
2026-01-23DP2026-00390Signs - Discretionary Use
NEW: SIGN - CLASS C (FREESTANDING SIGN)
Released
Approval
2024-10-31DP2024-07773Industrial - Other Areas
NEW: GENERAL INDUSTRIAL - LIGHT - (BIKE STALL LOCATION RELAXATION)
Cancelled
Approval
2012-07-23DP2012-3078Industrial - Other Areas
ADDITION: OFFICE (GARAGE); REVISION: CHANGES TO SITE PLAN (GARBAGE ENCLOSURE)
Released
Approval

Recent building permits 8 since 2012 · 4 in the City’s office class

AppliedPermitClass · workEst. costStatus
2026-02-09BP2026-019523402 - Office · Alteration
Interior Alterations
$300,000Completed
2025-03-12BP2025-042133402 - Office · Alteration
interior
$220,000Completed
2023-07-06BP2023-107903402 - Office · Alteration
Office Interior Alterations- New tenant fit out
$1.1MCompleted
2022-06-27BP2022-112073402 - Office · Alteration
Interior alterations.
$430,000Completed
2017-07-18BP2017-090452124 - Laboratory · Alteration
Fire Alarm Upgrade - Group F2 - Novatel
$1,500Completed
2016-02-05BP2016-009972199 - Indust/Manufacture Misc. · Alteration$10,000Completed
2012-09-07BP2012-125242306 - Parking Garage · Addition
Novatel Garage - New Addition
$216,800Completed
2012-07-12BP2012-095372199 - Indust/Manufacture Misc. · Alteration
INTERIOR ALTERATION AND USE
$2.0MCompleted

Declared estimated project cost across all 8 non-residential building permits on the parcel since 2012: $4.3M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

56 inspection results are published against 8 of the 8 building permits on this parcel, from 2012-10-02 to 2026-05-19. The most recent occupancy inspection was accepted on 2013-09-19. 5 inspections used a life-safety checklist.

What was inspected

02040Fire separations and fire resistance: 11Fireseparations and fire resistanceEmergency lighting and exit signs: 22Emergencylighting and exit signsDocuments and directives: 4242Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection39
Acceptable7
Acceptable with Conditions6
Not Acceptable4

Stage

Inspection typeCount
Progress42
Final11
Occupancy3
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2026-05-19BP2026-01952FinalAll DirectivesAcceptable Add InspectionInspections can be booked at inspections.calgary.ca - Attending SCO seen fire stopping completed at entrances to new suite. Fire separation was completed as per submitted drawings.
2025-06-09BP2025-04213FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections are required. Permission to occupy granted. Please note, as this is not a change of use, a new occupancy permit is not Reissued/granted.
2025-05-29BP2025-04213FinalAll DirectivesNot AcceptableCorrect noted deficiencies and recall building inspection. The builder to Recall the Building Inspection, and on the day of the inspection have the required document, ready to email to the building safety codes officer doing the inspection on that day. File can be completed when the required document has been provided
2025-05-29BP2025-04213FinalAll DocumentsNot AcceptableNBC AE Division C 2.4.1.3. Fire Suppression System Designs (Sprinkler VI) . The verification that was provided has the wrong address. Please do not email any documentation to the person named at the bottom of this notice
2025-05-15BP2025-04213ProgressAll DocumentsAcceptable with ConditionsNBC AE Division C 2.4.1.4. Fire Alarm System Designs (Fire Alarm VI) Please do not email any documentation to the person named at the bottom of this notice
2025-05-15BP2025-04213ProgressAll DirectivesAcceptable with ConditionsInspections can be booked at inspections.calgary.ca The building final should only be called once all deficiencies are completed, and Electrical trade permit is closed ( proof that all trade permits are completed required). Please do not email any documentation to the person named at the bottom of this notice.
2025-05-15BP2025-04213ProgressAll DocumentsAcceptable with ConditionsNBC AE Division C 2.4.1.3. Fire Suppression System Designs (Sprinkler VI) Please do not email any documentation to the person named at the bottom of this notice
2025-05-15BP2025-04213ProgressNBC AE 3.4. ExitsAcceptable with ConditionsNBC AE Division B 3.4.5.1. Exit Signs Provide exit signs over or adjacent to every exit door in the building. If necessary, provide directional exit signage in floor areas to indicate the direction of travel to the exits.
2025-05-15BP2025-04213ProgressNBC AE 3.1. GeneralAcceptable with ConditionsNBC AE Division B 3.1.8.3. Continuity of Fire Separations As discussed with the site contact. all abandoned holes through the slab. must be fire stopped with a firestopping system.
2025-05-15BP2025-04213ProgressAll DocumentsAcceptable with ConditionsNBC AE Division C 2.4.2. Schedules of Professional Involvement Provide Schedule C-1 from the Coordinating Registered Professional and Schedule C-2 from the Registered Professionals of Record for architecture, mechanical, and electrical engineering
2024-07-16BP2023-10790Final—AcceptableRECEIVED STRUCTURAL C2 PROFESSIONAL RESPONSIBILITY CLARIFICATION As requested by the city please pass on this letter regarding the company changes related to the signing and stamping of the mechanical and electrical City schedules for the General Dynamics project. Regarding the electrical signing of the schedules, MP+P
2023-12-06BP2022-11207FinalGarage InspectionAcceptableNo Further Building Inspections Required.
2023-11-24BP2022-11207FinalDirectivesAcceptable Add InspectionCall 311 to book an inspection To complete the building final .Note to the building safety codes officer, no site inspection required. File can be completed when proof that EP2023-16078 (Related to the elevator) trade permit is completed, and is available for the building safety codes officer. The owner to recall the i
2023-11-24BP2022-11207Final—Acceptable Add InspectionReceived for the file : Architects / Designers schedules C-1/2 and C-2, Schedules from Structural, Mechanical, Electrical Engineers, Sprinkler Verification, Fire Alarm Verification, AEDERSA letter of compliance, and the fire stopping summary.

An inspection result is a record of one visit, not a verdict on the building. 4 of these 56 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 0 as of 2026-09-24

No City of Calgary business licence is recorded at this address or inside this parcel.

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 105 7136 11 St NE17 m · built 2017 · Office Condo · 5 accounts · Deerfoot Business Centre · 134 m
  • 7326 10 St NE15.5 m · built 1999 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 192 m
  • 7661 10 St NE7.4 m · built 1999 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 480 m
  • 7315 8 St NE8.5 m · built 1999 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 510 m
  • 7575 8 St NE17 m · built 2000 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 532 m
  • 6815 8 St NE23.9 m · built 1981 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 564 m

1120 68 Ave NE questions

Answers drawn from the record.

How tall is 1120 68 Ave NE?

No LiDAR structure could be attributed to this parcel in the current City 3D building layer.

When was 1120 68 Ave NE built?

The City’s assessment roll records 1997 as the year of construction.

What is the assessed value of 1120 68 Ave NE?

The City of Calgary assesses this parcel at $9.8M in total on the 2026 roll, 201st of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 1120 68 Ave NE zoned?

The parcel is designated I-B, Industrial - Business, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 1120 68 Ave NE?

McKnight Westwinds Station, 4.4 km in a straight line from the parcel centroid.

Who is in 1120 68 Ave NE?

No City of Calgary business licence is recorded at this address or inside the parcel. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 1120 68 Ave NE been inspected?

The City publishes 56 inspection results against 8 permits here, between 2012-10-02 and 2026-05-19. 5 used a life-safety checklist such as fire separations, firestopping or emergency lighting. The most recent occupancy inspection was accepted on 2013-09-19. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 1120 68 Ave NE?

102 scheduled transit trips call within 300 m of the parcel on a representative weekday, 16 of them in the morning peak, across 1 route. The closest stop is NB 10 ST NE @ 68 AV NE, 79 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at 1120 68 Ave NE?

No mapped bikeway lies within 400 m. The parcel fronts a Priority 2 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at 1120 68 Ave NE?

No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.

Is office space available at 1120 68 Ave NE?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.