105 7136 11 St NE
Office Condo · 5 separately assessed accounts · mid-rise office building · built 2017 · 105 7136 11 St NE

105 7136 11 St NE is a 17 m mid-rise office building in Deerfoot Business Centre, Calgary, recorded on the City assessment roll as built in 2017. Its main structure is the 309th tallest office roof of the 775 ranked in this record, and 3rd of 11 in Deerfoot Business Centre. The City assesses the 5 accounts on the parcel at $10.0M on the 2026 roll, 196th of 822 sites in the record by assessed value. 102 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 8 building permits and 4 development permits on the parcel, the largest a $14.0M office permit for new construction, applied for in 2015.
- Civic address
- 105 7136 11 St NE, Calgary, AB
- Community
- Deerfoot Business Centre (DBC)
- City sub-property use
- C121 Office Condo × 5 · all Office Condo sites
- Land use district
- I-B — Industrial - Business (Industrial)
- Height rank
- #309 of 785 citywide · #3 of 10 in Deerfoot Business Centre
- Footprint to parcel
- 49% of the parcel under LiDAR footprints
- Parcel pieces
- 1 titled piece · roll 202825485 and 4 more
- Coordinates
- 51.117244, -114.036765
Slav Loban and the Commercially × Real Broker team give Calgary commercial owners a confidential pricing opinion based on the public record shown on this page: assessment history, permits, land use and the surrounding market. It is a broker’s opinion of value, not a formal appraisal. You do not need to be ready to list to start the conversation.
Massing and site plan
Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →
How it compares
Roof height against the Deerfoot Business Centre median and tallest, and against the city.
Access
Public-geometry tests only; confirm routes, entrances and hours with the building.
CTrain
Nearest station: McKnight Westwinds, 4.4 km straight-line (route 202).
Plus 15
Outside the Plus 15 network area.
Cycling
No mapped bikeway lies within 400 m of the parcel.
Winter access
The parcel fronts a Priority 2 snow and ice clearing route, 15 m from its edge. Priority 2 routes are cleared after the Priority 1 network.
Accessible crossing
No accessible pedestrian signal lies within 400 m of the parcel.
Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.
Transit service
Scheduled Calgary Transit service at the door, not only the distance to a platform.
102 scheduled transit trips call within 300 m of this parcel on a representative weekday, 16 of them between 07:00 and 09:00, across 1 route and 5 stops. The closest stop is WB 68 AV NE @ 11ST NE, 164 m away.
| Service class | Trips on the service day |
|---|---|
| REGULAR | 102 |
Routes: 32 Huntington/Sunridge.
Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.
Parking
What the City’s own tariff record says about kerbside parking beside this parcel.
No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.
Assessment history
5 separately assessed accounts sit on this parcel (office condominium units or split accounts). 2026 assessed values range $1.5M to $2.5M, median $1.8M, total $10.0M. Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.
Roll 202825485 (highest-assessed account on the parcel) · Office Condo
Published values by roll year
| Roll year | Assessed value | Change |
|---|---|---|
| 2021 | $2.2M | — |
| 2022 | $2.4M | 10.6% |
| 2023 | $2.1M | -12.4% |
| 2024 | $2.2M | 4.7% |
| 2025 | $2.5M | 11.3% |
| 2026 | $2.5M | 2.0% |
Development and building permits
Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.
Recent development permits 4 since 2012
| Applied | Permit | Category · description | Status |
|---|---|---|---|
| 2020-03-23 | DP2020-1814 | Signs - Permitted Use NEW: SIGN - CLASS B (FASCIA SIGN) | Released Approval |
| 2019-06-25 | DP2019-3255 | Change of Use - Discretionary Use or Relaxations Required CHANGE OF USE: CONFERENCE AND EVENT FACILITY | Released Approval |
| 2017-02-22 | DP2017-0640 | Signs - Discretionary Use NEW: SIGN - CLASS C (FREESTANDING SIGN) | Released Approval |
| 2012-01-20 | DP2012-0213 | Industrial - Other Areas NEW: OFFICE | Released Approval |
Recent building permits 8 since 2012 · 4 in the City’s office class
| Applied | Permit | Class · work | Est. cost | Status |
|---|---|---|---|---|
| 2025-10-22 | BP2025-20696 | 5299 - Medical Misc. · Alteration Interior alterations | $500,000 | Completed |
| 2025-04-24 | BP2025-07367 | 5117 - Commercial School · Alteration SkyCAD 11 ST | $250,000 | Completed |
| 2022-05-13 | BP2022-07977 | 3402 - Office · Alteration YGC & KV Office-Swift Building Tenant Improvement | $115,000 | Expired |
| 2022-03-14 | BP2022-03783 | 3507 - Community Centre · Alteration Banquet Hall Swift Building - Conference and Event facility | $290,000 | Expired |
| 2021-12-09 | BP2021-20914 | 3402 - Office · Alteration Interior alterations. | $93,690 | Issued Permit |
| 2020-02-18 | BP2020-01923 | 3402 - Office · Alteration New tenant fit out. | $618,000 | Completed |
| 2019-08-21 | BP2019-11383 | 4002 - Vacant · Alteration Swift Center - 3rd Floor Demising Wall | $15,000 | Completed |
| 2015-09-11 | BP2015-11835 | 3402 - Office · New New 3 storey office building | $14.0M | Completed |
Declared estimated project cost across all 8 non-residential building permits on the parcel since 2012: $15.9M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.
Inspections
What City inspectors recorded against the permits on this parcel.
29 inspection results are published against 4 of the 8 building permits on this parcel, from 2015-11-17 to 2026-04-10.
What was inspected
Result of each visit
| Outcome | Inspections |
|---|---|
| Acceptable Add Inspection | 19 |
| Acceptable with Conditions | 5 |
| Not Acceptable | 3 |
| Acceptable | 2 |
Stage
| Inspection type | Count |
|---|---|
| Progress | 28 |
| Final | 1 |
The 14 most recent inspection results
| Date | Permit | Stage | Checklist | Outcome | Inspector note |
|---|---|---|---|---|---|
| 2026-04-10 | BP2025-20696 | Final | All Directives | Acceptable | No deficiencies noted. No further building inspections are required. |
| 2025-07-25 | BP2025-07367 | Progress | All Directives | Acceptable | No further building inspections required permission to occupy granted. |
| 2025-07-22 | BP2025-07367 | Progress | NBC AE 3.1. General | Acceptable Add Inspection | NBC AE Division B 3.1.9.4. Combustible Piping Penetrations The 4-inch combustible pipe, on the main floor, partially through the wall and the 2 inch at an angle must be fire stopped with a system listing. To be reviewed at the building Inspection final. |
| 2025-07-22 | BP2025-07367 | Progress | All Directives | Acceptable Add Inspection | Inspections can be booked at inspections.calgary.ca The building final should only be called once all deficiencies are completed, and trade permits closed (proof that all trade permits are completed required), and all required documents are available on site for the buildings safety codes officer to have for the file. |
| 2025-07-15 | BP2025-07367 | Progress | All Directives | Not Acceptable | Previous noted deficiencies have not been corrected. Recall when completed. The building inspection should not be recalled until a hard copy of all required fire stopping penetrations are on site. Builder to review all penetrations on the underside as seen from the first floor |
| 2025-06-27 | BP2025-07367 | Progress | All Directives | Not Acceptable | Previous noted deficiencies have not been corrected. Recall when completed. Call a Building Progress fire stopping and fire separation inspection, prior to covering. Contractor is to ensure that any new penetrations or damaged areas in the fire separation are repair and sealed as necessary. |
| 2025-06-27 | BP2025-07367 | Progress | NBC AE 3.1. General | Not Acceptable | NBC AE Division B 3.1.9.4. Combustible Piping Penetrations If the fire stopping collar is used it must be installed as per the listing currently no anchors are installed |
| 2020-03-30 | BP2020-01923 | Progress | DOCUMENTS Commercial | Acceptable with Conditions | Sprinkler Verification Required at final |
| 2020-03-30 | BP2020-01923 | Progress | DOCUMENTS Commercial | Acceptable with Conditions | Fire Alarm Verification Required at final |
| 2020-03-30 | BP2020-01923 | Progress | DIRECTIVES | Acceptable with Conditions | Contractor to complete items, then may continue Ok to drywall walls and install ceilings call final next |
| 2020-03-30 | BP2020-01923 | Progress | DOCUMENTS Commercial | Acceptable with Conditions | Require Fire Stop Test Design Summary For any systems used |
| 2020-03-30 | BP2020-01923 | Progress | DOCUMENTS Commercial | Acceptable with Conditions | Occupancy Application is required with sign off or proof of final inspection from Electrical Mechanical and Plumbing Inspectors |
| 2017-02-01 | BP2015-11835 | Progress | — | Acceptable Add Inspection | Reviewed fire stopping of floor penetrations in concealed area for 3 Rd floor. OK to proceed. Endure to call for inspection when fire stopping of curtain wall starts. |
| 2017-01-11 | BP2015-11835 | Progress | — | Acceptable Add Inspection | Reviewed Fire stopping of floor penetrations in concealed areas for the 2nd floor. Ensure that all combustible piping throng slab over 2 " has wrap strips or collars as per systems listing. OK to proceed. |
An inspection result is a record of one visit, not a verdict on the building. 3 of these 29 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.
The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.
Occupiers and licensed businesses
The public record of who operates on the parcel, labelled by source.
Businesses licensed by the City on this parcel 1 as of 2026-09-24
| Licensed business | Address | Licence type | Status | Licensed since |
|---|---|---|---|---|
| Lk Pharmacy | 7136 11 St NE | Retail Dealer - Premises | Licensed | 2026 |
Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.
No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.
Nearby office buildings
The six nearest office building sites in the record, by straight-line distance between parcel centroids.
Where this building sits in the record
Every collection this building belongs to, from the same public data shown above.
105 7136 11 St NE questions
Answers drawn from the record.
How tall is 105 7136 11 St NE?
The main structure on the parcel has a LiDAR roof height of 17 m in The City of Calgary’s 3D building data, a storey-equivalent of about 4 at 3.9 m per storey.
When was 105 7136 11 St NE built?
The City’s assessment roll records 2017 as the year of construction.
What is the assessed value of 105 7136 11 St NE?
The City of Calgary assesses the 5 accounts on this parcel at $10.0M in total on the 2026 roll, 196th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.
What is 105 7136 11 St NE zoned?
The parcel is designated I-B, Industrial - Business, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.
Which CTrain station is closest to 105 7136 11 St NE?
McKnight Westwinds Station, 4.4 km in a straight line from the parcel centroid.
Who is in 105 7136 11 St NE?
The City of Calgary business licence register lists 1 licensed business at this address or inside the parcel as of 2026-09-24, shown in the occupiers section. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.
Has 105 7136 11 St NE been inspected?
The City publishes 29 inspection results against 4 permits here, between 2015-11-17 and 2026-04-10. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.
How good is transit at 105 7136 11 St NE?
102 scheduled transit trips call within 300 m of the parcel on a representative weekday, 16 of them in the morning peak, across 1 route. The closest stop is WB 68 AV NE @ 11ST NE, 164 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.
Can staff cycle or get there in winter at 105 7136 11 St NE?
No mapped bikeway lies within 400 m. The parcel fronts a Priority 2 snow and ice clearing route. These are straight-line tests against City layers.
Where can visitors park at 105 7136 11 St NE?
No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.
Is office space available at 105 7136 11 St NE?
This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.
Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.
Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.