COMMERCIALLY.caOfficeBuildings.ca
OfficeBuildings.ca / Manchester Industrial · Calgary office building record
Manchester Industrial · Calgary office building record

6227 2 St SE

Office use recorded by City permits (roll code X034) · low-rise office building · built 1998 · 6227 2 St SE

3D render of 6227 2 St SE, a 7.5 m low-rise office building in Manchester Industrial, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 6227 2 St SE highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

6227 2 St SE is a 7.5 m low-rise office building in Manchester Industrial, Calgary, recorded on the City assessment roll as built in 1998. Its main structure is the 647th tallest office roof of the 775 ranked in this record, and 17th of 40 in Manchester Industrial. The City assesses the parcel at $4.1M on the 2026 roll, 420th of 822 sites in the record by assessed value. The nearest CTrain platform is Chinook, 361 m away in a straight line. 168 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 11 building permits and 2 development permits on the parcel, the largest an $850,000 office permit for alteration, applied for in 2019.

LiDAR roof height7.5 m
Storey-equivalent (derived)2
Footprint2,882 m²
Parcel9,498 m²
Year built (roll)1998
Assessed 2026$4.1M
Structures on parcel2
Nearest CTrain361 m
Civic address
6227 2 St SE, Calgary, AB
Community
Manchester Industrial (MNI)
City sub-property use
X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
Land use district
I-G — Industrial - General (Industrial)
Height rank
#647 of 785 citywide · #17 of 39 in Manchester Industrial
Footprint to parcel
30% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 101049401
Coordinates
50.99564, -114.06101
Why this building is in the record

The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 9 permits in the City’s Office classes between 2006 and 2025. The building may hold other uses as well. Every building included this way.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

7.5 mN20 mLiDAR roof outlines · City of Calgary · true scale
7.5 m · 1,531 m² · 3.8 m · 1,351 m²
2.8 m structure3.4 m structure4 m structure4.1 m structure4.2 m structure4.2 m structure4.2 m structure4.5 m structure5.2 m structure5.3 m structure5.5 m structure6 m structure6.2 m structure6.3 m structure6.4 m structure6.4 m structure6.6 m structure7 m structure7.1 m structure7.1 m structure7.3 m structure3.8 m · 1,351 m² footprint7.5 m · 1,531 m² footprintN50 mFootprints within 197 m · City of Calgary
Context within 197 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Manchester Industrial median and tallest, and against the city.

6227 2 St SE7.5 mManchester Industrial median7.1 mManchester Industrial tallest45.2 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: Chinook, 361 m straight-line (route 201).

Other office buildings near Chinook Station →

Plus 15

Outside the Plus 15 network area.

Cycling

No mapped bikeway lies within 400 m of the parcel.

Winter access

No Priority 1 or 2 snow and ice clearing route lies within 30 m of the parcel edge.

Accessible crossing

No accessible pedestrian signal lies within 400 m of the parcel.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

168 scheduled transit trips call within 300 m of this parcel on a representative weekday, 21 of them between 07:00 and 09:00, across 4 routes and 5 stops. The closest stop is NB Centre ST S @ Glenmore TR, 209 m away.

Service classTrips on the service day
REGULAR168

Routes: 10 City Hall/Southcentre · 36 Riverbend · 41 Lynnwood · 148 Great Plains Industrial.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 101049401 · X034

Series not charted. The City’s published values for this roll number change by more than half or double between years, which usually signals a re-numbered, split or partially assessed account rather than a market movement. The published figures are listed below without a trend claim.

Published values by roll year
Roll yearAssessed valueChange
2005$4.9M—
2006$5.7M14.6%
2007$6.9M21.9%
2008$9.1M32.0%
2009$9.7M6.9%
2010$9.6M-1.2%
2011$8.6M-10.3%
2012$8.0M-7.2%
2013$8.9M11.1%
2014$7.8M-12.6%
2015$9.6M23.9%
2016$10.0M3.6%
2017$8.4M-15.5%
2018$3.1M-63.0%
2019$5.0M59.6%
2020$5.1M2.2%
2021$4.2M-17.3%
2022$3.4M-18.8%
2023$4.0M16.1%
2024$4.3M7.8%
2025$4.2M-1.9%
2026$4.1M-2.1%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

0122012: 0 development permits2012: 0 building permits122013: 1 development permit2013: 0 building permits132014: 0 development permits2014: 2 building permits142015: 0 development permits2015: 0 building permits152016: 0 development permits2016: 1 building permit162017: 0 development permits2017: 1 building permit172018: 1 development permit2018: 2 building permits182019: 0 development permits2019: 2 building permits192020: 0 development permits2020: 1 building permit202021: 0 development permits2021: 0 building permits212022: 0 development permits2022: 0 building permits222023: 0 development permits2023: 0 building permits232024: 0 development permits2024: 0 building permits242025: 0 development permits2025: 2 building permits252026: 0 development permits2026: 0 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 2 since 2012

AppliedPermitCategory · descriptionStatus
2018-10-05DP2018-4736Renovations - Non-Residential
EXTERIOR RENOVATIONS: GENERAL INDUSTRIAL - LIGHT (NEW ENTRY DOOR)
Released
Approval
2013-11-27DP2013-4916Signs - Permitted Use
NEW: SIGN - CLASS B (FASCIA SIGN)
Released
Approval

Recent building permits 11 since 2012 · 7 in the City’s office class

AppliedPermitClass · workEst. costStatus
2025-12-09BP2025-234605117 - Commercial School · Alteration—Cancelled
2025-01-28BP2025-015273402 - Office · Alteration
Interior Alterations
$50,000Completed
2020-03-30BP2020-037852399 - Indust/Utility Misc. · Repair
Repair after fire.
$195,000Completed
2019-09-04BP2019-120123402 - Office · Alteration
Interior Alteration - Sulvaris Office
$60,000Completed
2019-03-05BP2019-022453402 - Office · Alteration
POMERLEAU OFFICE RENO
$850,000Completed
2018-12-20BP2018-164764002 - Vacant · Alteration$40,000Completed
2018-04-12BP2018-040033402 - Office · Alteration
Cougar Contractors Offices Renovation
$35,000Completed
2017-11-28BP2017-155893402 - Office · Alteration
Interior alterations
$128,000Completed

Declared estimated project cost across all 11 non-residential building permits on the parcel since 2012: $1.8M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

45 inspection results are published against 9 of the 11 building permits on this parcel, from 2014-10-10 to 2025-04-23. The most recent occupancy inspection was accepted on 2019-05-03. 9 inspections used a life-safety checklist and 11 a barrier-free checklist.

What was inspected

051015Fire separations and fire resistance: 22Fireseparations and fire resistanceFirestopping: 11FirestoppingEmergency lighting and exit signs: 44Emergencylighting and exit signsBarrier-free: 1111Barrier-freeDocuments and directives: 1919Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection19
Acceptable13
Not Acceptable12
Acceptable with Conditions1

Stage

Inspection typeCount
Framing17
Final12
Progress11
Occupancy5
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2025-04-23BP2025-01527FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections are required. -- File completed.
2025-04-03BP2025-01527ProgressAll DirectivesAcceptable with ConditionsNo infractions noted. Call for Final Inspection next. - Ensure that trade permits are complete before calling for final.
2020-07-23BP2020-03785FinalGeneralAcceptableAcceptable, no further inspections required.
2020-07-21BP2020-03785FramingDIRECTIVESNot AcceptableCall 311 to book an inspection Continue with interior.
2020-07-21BP2020-03785FramingDOCUMENTS CommercialNot AcceptableP. Eng. review required . As per permit conditions. Professional Engineers field review from Sanjay Desai for the as-built structure required. Document to be available to the attending Building SCO at final inspection. .
2019-12-20BP2019-12012ProgressEMERGENCY LIGHTING & EXIT SIGNSAcceptable Add InspectionEmergency lighting required in all principal exit routes.
2019-12-20BP2019-12012ProgressFIRE RESISTANCE & FIRE SEPARATIONS PT 3Acceptable Add Inspection3.1.8 Fire separations are to be continuous Ensure all holes and joints are sealed at corridor wall. Ensure ceiling tile at perimeter of corridor wall are not in place to view smoke seal.
2019-12-20BP2019-12012ProgressFIRESTOPPINGAcceptable Add InspectionFirestopping required at penetration at floor ensure photos of fire stopping are on site at final for holes cored through floor.
2019-12-20BP2019-12012ProgressDIRECTIVESAcceptable Add InspectionCall 311 to book an inspection Call for final.
2019-12-20BP2019-12012ProgressEMERGENCY LIGHTING & EXIT SIGNSAcceptable Add Inspection*3.4.5.1. Exit sign is to be a green pictogram
2019-05-03BP2019-02245OccupancyDIRECTIVESAcceptableContractor to complete items, then may continue - work associated with this permit is complete, no additional building inspections are required.
2019-05-03BP2019-02245OccupancyWINDOWS AND DOORSAcceptable3.3.1.19. Fixed glass panels require permanent markings
2019-04-03BP2019-02245FramingBARRIER-FREE BUILDINGSAcceptable Add Inspection3.8.3.8 BFree washroom coat hook not more than 1200mm high
2019-04-03BP2019-02245FramingBARRIER-FREE BUILDINGSAcceptable Add InspectionDivision B.3.8.3.12.(1) A universal Toilette room shall d) have one water closet conforming to the requirements of Article 3.8.3.9. that has a clearance to the walls of i) not less than 285 mm and not more than 305 mm on one side, and ii) not less than 875 mm on the other side

An inspection result is a record of one visit, not a verdict on the building. 12 of these 45 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 6 as of 2026-09-24

Licensed businessAddressLicence typeStatusLicensed since
Eagle Crest Construction6223 2 St SECleaning Service (Commercial Only), Contractor (No Provincial Licence Required)Licensed2023
Foxcanada6227 2 St SEDistribution ManagerLicensed2019
Interior Heavy Equipment Operator School6227 2 St SESchool (Prov. Not Required)Licensed2026
Ironclad Earthworks6223 2 St SEContractor (No Provincial Licence Required)Licensed2025
Mty Tiki Ming6223 2 St SEWholesalerLicensed2023
Pomerleau6223 2 St SEContractor (No Provincial Licence Required)Renewal pending2017

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 100 221 62 Ave SE7.1 m · built 1965 · Office Condo · 2 accounts · Manchester Industrial · 65 m
  • 253 62 Ave SE4.2 m · built 1998 · Small Office · Manchester Industrial · 76 m
  • 245 Forge Rd SE12.8 m · built 1963 · Small Office · Fairview Industrial · 289 m
  • 5116 7005 Fairmount Dr SE15 m · built 2017 · Office Condo · 18 accounts · Fairview Industrial · 392 m
  • 5980 Centre St SE15 m · built 1967 · Office use recorded by City permits (roll code X034) · Manchester Industrial · 457 m
  • 6940 Fisher Rd SE4.6 m · built 1961 · Office use recorded by City permits (roll code X034) · Fairview Industrial · 517 m

6227 2 St SE questions

Answers drawn from the record.

How tall is 6227 2 St SE?

The main structure on the parcel has a LiDAR roof height of 7.5 m in The City of Calgary’s 3D building data, a storey-equivalent of about 2 at 3.9 m per storey.

When was 6227 2 St SE built?

The City’s assessment roll records 1998 as the year of construction.

What is the assessed value of 6227 2 St SE?

The City of Calgary assesses this parcel at $4.1M in total on the 2026 roll, 420th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 6227 2 St SE zoned?

The parcel is designated I-G, Industrial - General, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 6227 2 St SE?

Chinook Station, 361 m in a straight line from the parcel centroid.

Who is in 6227 2 St SE?

The City of Calgary business licence register lists 6 licensed businesses at this address or inside the parcel as of 2026-09-24, shown in the occupiers section. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 6227 2 St SE been inspected?

The City publishes 45 inspection results against 9 permits here, between 2014-10-10 and 2025-04-23. 9 used a life-safety checklist such as fire separations, firestopping or emergency lighting. 11 used the barrier-free checklist. The most recent occupancy inspection was accepted on 2019-05-03. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 6227 2 St SE?

168 scheduled transit trips call within 300 m of the parcel on a representative weekday, 21 of them in the morning peak, across 4 routes. The closest stop is NB Centre ST S @ Glenmore TR, 209 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at 6227 2 St SE?

No mapped bikeway lies within 400 m. No Priority 1 or 2 clearing route lies within 30 m of the parcel edge. These are straight-line tests against City layers.

Where can visitors park at 6227 2 St SE?

No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.

Is office space available at 6227 2 St SE?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.