COMMERCIALLY.caCommercially × Real BrokerOfficeBuildings.ca
OfficeBuildings.ca / Downtown Commercial Core · Calgary office building record
Downtown Commercial Core · Calgary office building record

Bow Valley Square

Office · office tower · built 1972 · 250 6 Ave SW

3D render of Bow Valley Square (250 6 Ave SW), a 147.1 m office tower in Downtown Commercial Core, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with Bow Valley Square highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

Bow Valley Square (250 6 Ave SW) is a 147.1 m office tower in Downtown Commercial Core, Calgary, recorded on the City assessment roll as built in 1972. Its main structure is the 16th tallest office roof of the 775 ranked in this record, and 13th of 119 in Downtown Commercial Core. The City assesses the parcel at $146.5M on the 2026 roll, 18th of 822 sites in the record by assessed value. A Plus 15 walkway touches the parcel. The nearest CTrain platform is 3rd Street SW, 238 m away in a straight line. 2,665 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 405 building permits and 33 development permits on the parcel, the largest a $12.4M office permit for alteration, applied for in 2017.

Street-level 3D view of Bow Valley Square, Calgary, from the southeast
From the street: an eye-level view from the southeast, about 90 m away. Same model, same source; not a photograph.
LiDAR roof height147.1 m
Storey-equivalent (derived)38
Footprint10,241 m²
Parcel11,978 m²
Year built (roll)1972
Assessed 2026$146.5M
Structures on parcel5
Nearest CTrain238 m
Civic address
250 6 Ave SW, Calgary, AB
Community
Downtown Commercial Core (DNC)
City sub-property use
C101 Office · all Office sites
Land use district
DC — Direct Control (Direct Control)
Height rank
#16 of 785 citywide · #13 of 111 in Downtown Commercial Core
Footprint to parcel
86% of the parcel under LiDAR footprints
Parcel pieces
5 titled pieces · roll 202065025
Coordinates
51.048219, -114.067008
Own or manage Bow Valley Square?

Slav Loban and the Commercially × Real Broker team give Calgary commercial owners a confidential pricing opinion based on the public record shown on this page: assessment history, permits, land use and the surrounding market. It is a broker’s opinion of value, not a formal appraisal. You do not need to be ready to list to start the conversation.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

147.1 mN20 mLiDAR roof outlines · City of Calgary · true scale
147.1 m · 2,494 m² · 140.6 m · 2,680 m² · 123 m · 3,215 m² · 67.5 m · 1,676 m² · 8.7 m · 176 m²
3.5 m structure9.1 m structure9.7 m structure10.1 m structure10.1 m structure10.6 m structure10.8 m structure10.8 m structure12.4 m structure12.4 m structure12.6 m structure12.9 m structure13.2 m structure13.7 m structure14.6 m structure20.3 m structure31.4 m structure41.3 m structure74.8 m structure75.8 m structure112.7 m structure114.9 m structure133.4 m structure243.2 m structurePlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Open to SkyPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Open to SkyPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Open to SkyPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Open to SkyPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — EnclosedPlus 15 — Bridge EnclosedPlus 15 — Open to SkyPlus 15 — Open to SkyPlus 15 — Bridge EnclosedPlus 15 — Bridge Enclosed8.7 m · 176 m² footprint67.5 m · 1,676 m² footprint123 m · 3,215 m² footprint140.6 m · 2,680 m² footprint147.1 m · 2,494 m² footprint3rd Street SW CTrain7 Avenue SW (Green Line)N50 mFootprints within 210 m · City of Calgary
Context within 210 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Downtown Commercial Core median and tallest, and against the city.

Bow Valley Square147.1 mDowntown Commercial Core median66.2 mDowntown Commercial Core tallest243.2 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: 3rd Street SW, 238 m straight-line (route 201/202). Planned Green Line station 7 Avenue SW is 137 m away (Downtown Segment, per the City’s Green Line map).

Other office buildings near 3rd Street SW Station →

Plus 15

The City’s Plus 15 walkway geometry touches this parcel; the plan above shows the connected segments in lime. Confirm access points, hours and the interior route with the building.

Cycling

The best-rated cycling facility within 400 m of the parcel is a protected lane (Cycle Track), 290 m away.

Winter access

The parcel fronts a Priority 1 snow and ice clearing route, 8 m from its edge. Priority 1 routes are cleared first after a snowfall.

Accessible crossing

The nearest accessible pedestrian signal is at 6 Avenue and 1 Street, 138 m from the parcel. The closest signalised crossing, 5 Avenue and 2 Street at 64 m, has no accessible signal recorded.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

2,665 scheduled transit trips call within 300 m of this parcel on a representative weekday, 370 of them between 07:00 and 09:00, across 32 routes and 35 stops. The closest stop is EB 5 AV SW @ 2 ST SW, 28 m away.

Service classTrips on the service day
REGULAR1,423
LRT672
MAX481
BRT62
EXPRESS27

Routes: 1 Bowness/Forest Lawn · 2 Mount Pleasant/Killarney 17 Av SW · 3 Sandstone/Elbow Dr SW · 4 Huntington · 5 North Haven · 6 Killarney/26 Av SW · 7 Marda Loop · 10 City Hall/Southcentre · 13 Altadore · 15 Deerfoot Meadows · 17 Renfrew/Ramsay · 22 Richmond Rd SW · 24 Ogden · 62 Hidden Valley · 64 MacEwan · 66 Lakeview · 90 Bridgeland/University of Calgary · 101 Inglewood · 109 Harvest Hills · 116 Coventry Hills · 117 McKenzie Towne Express · 131 East Bow Express · 142 Panorama · 151 New Brighton Express · 201 Red Line - Somerset - Bridlewood/Tuscany CTrain · 202 Blue Line - Saddletowne/69 Street CTrain · 302 BRT Southeast/City Centre · 500 Airport Express · 503 Symons Valley Express · MG MAX Green North Pointe/ City Centre · MP MAX Purple City Centre/East Hills · MY MAX Yellow Woodpark/City Centre.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

Paid on-street parking within 200 m

316 metered stalls across 48 City parking zones touching this walking radius, at $1.00 to $4.75 per hour depending on zone and time of day. Maximum stay 30 to 120 minutes. Tariff zones 4a, 4c.

Enforced 0710-1750 MON-FRI, 0910-1750 SAT; 0710-1750 MON-FRI,0910-1750 SAT; 0710-1750 MON-SAT; 0840-1520 MON-FRI, 0910-1750 SAT.

Closest zone

6 Av SW, Fr 1 St SW To 2 St SW — 3 m from the parcel, 4 parallel stalls, tariff zone 4a, 30-minute maximum.

WhenRate
Mon-Fri 8:30 AM to 11:00 AM$3.75 per Hour
Mon-Fri 11:00 AM to 1:30 PM$4.50 per Hour
Mon-Fri 1:30 PM to 3:30 PM$3.75 per Hour
No Parking at this timeSee Street Signs
Saturday: 9:00 AM to 6:00 PM$1.00 per Hour
Sunday/Holidays:Free parking
Free parking to 7 AM Mon-FriSee Signs /Parking Restrictions

The City of Calgary On-Street Parking Zones with Rates, retrieved 2026-09-24. Counts cover Active paid parking zones only: loading bays, taxi stands, accessible stalls and permit-only zones are excluded, and off-street parkades are not in this dataset. Tariffs and enforcement hours change; confirm on the sign.

Named building record

Public-domain building facts from Wikidata attached by location. Where a stated height differs from the LiDAR roof, the difference usually reflects spires, screens or datum.

Name
Bow Valley Square
Description
building in Calgary, Alberta, Canada
Opened
1981
Architect
WZMH Architects
Identifier
Wikidata Q4950665 (CC0)

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 202065025 · Office

$0$243.0M$486.0M$728.9M$971.9M20152017201920212023202520262015 roll: $899.9M2016 roll: $769.1M2017 roll: $609.9M2018 roll: $422.5M2019 roll: $235.6M2020 roll: $308.0M2021 roll: $243.0M2022 roll: $206.7M2023 roll: $226.2M2024 roll: $230.0M2025 roll: $160.0M2026 roll: $146.5M$146.5M (2026)
Published values by roll year
Roll yearAssessed valueChange
2015$899.9M—
2016$769.1M-14.5%
2017$609.9M-20.7%
2018$422.5M-30.7%
2019$235.6M-44.2%
2020$308.0M30.8%
2021$243.0M-21.1%
2022$206.7M-14.9%
2023$226.2M9.4%
2024$230.0M1.7%
2025$160.0M-30.4%
2026$146.5M-8.4%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

020402012: 1 development permit2012: 25 building permits122013: 4 development permits2013: 30 building permits132014: 2 development permits2014: 42 building permits142015: 2 development permits2015: 19 building permits152016: 3 development permits2016: 37 building permits162017: 2 development permits2017: 25 building permits172018: 1 development permit2018: 43 building permits182019: 0 development permits2019: 33 building permits192020: 0 development permits2020: 18 building permits202021: 2 development permits2021: 21 building permits212022: 5 development permits2022: 32 building permits222023: 7 development permits2023: 33 building permits232024: 3 development permits2024: 20 building permits242025: 1 development permit2025: 16 building permits252026: 0 development permits2026: 11 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 33 since 2012

AppliedPermitCategory · descriptionStatus
2025-03-14DP2025-01520Signs - Permitted Use
NEW: SIGN - CLASS B (FASCIA SIGNS - 3)
Released
Approval
2024-07-04DP2024-04927Special Function Tents
TEMPORARY USE: SPECIAL FUNCTION - CLASS 2 (RESTAURANT: LICENSED, JULY 5 - SEPTEMBER 3, 2024) - CONSECUTIVE DAYS
Released
Approval
2024-04-04DP2024-02302Change of Use - Discretionary Use or Relaxations Required
CHANGE OF USE: AMUSEMENT ARCADE, RESTAURANT: LICENSED
Cancelled
2024-03-04DP2024-01504Outdoor Cafe
TEMPORARY USE: OUTDOOR CAFÉ (10 YEARS)
Released
Approval
2023-09-13DP2023-06402Change of Use - With Change to Site Plan
CHANGES TO SITE PLAN: MULTI-USE COMMERCIAL (FENCING)
Cancelled
2023-08-30DP2023-06058Change of Use - Permitted Use
CHANGE OF USE: OFFICE
Cancelled
2023-08-05DP2023-05373Change of Use - Permitted Use
CHANGE OF USE: OFFICE
Cancelled - Pending Refund
2023-07-31DP2023-05187Change of Use - Permitted Use
CHANGE OF USE: OFFICE
Cancelled

Recent building permits 405 since 2012 · 324 in the City’s office class

AppliedPermitClass · workEst. costStatus
2026-08-28BP2026-165003402 - Office · Alteration$29,700Pending Plans Review Assignment
2026-08-20BP2026-158863402 - Office · Alteration$1.0MPending Plans Review Assignment
2026-07-21BP2026-136483402 - Office · Alteration
Interior alterations
$700,000Issued Permit
2026-07-16BP2026-133653608 - Restaurant · Alteration
Interior Alteration
$200,000Issued Permit
2026-06-15BP2026-109513402 - Office · Alteration
Interior alteration
$4.0MIssued Permit
2026-06-11BP2026-106383402 - Office · Alteration
Interior Alteration
$110,000Issued Permit
2026-06-08BP2026-103533402 - Office · Alteration
Interior Alteration - Office
$90,000Issued Permit
2026-05-05BP2026-075923402 - Office · Alteration
Interior alterations
$465,000Issued Permit

Declared estimated project cost across all 405 non-residential building permits on the parcel since 2012: $121.9M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

1,498 inspection results are published against 341 of the 405 building permits on this parcel, from 2012-03-23 to 2026-09-04. The most recent occupancy inspection was accepted on 2026-07-21. 146 inspections used a life-safety checklist and 18 a barrier-free checklist.

What was inspected

05001000Fire separations and fire resistance: 2828Fireseparations and fire resistanceFirestopping: 5252FirestoppingEmergency lighting and exit signs: 4545Emergencylighting and exit signsBarrier-free: 1818Barrier-freeAlarm and suppression: 33Alarmand suppressionDocuments and directives: 10611061Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection670
Acceptable427
Acceptable with Conditions304
Not Acceptable97

Stage

Inspection typeCount
Progress873
Final389
Framing129
Occupancy107
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2026-09-04BP2024-18453FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed.
2026-08-19BP2022-19441FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed.
2026-07-21BP2025-19365FinalAll DirectivesAcceptable with ConditionsCorrect noted deficiencies. No further building inspections are required. - Replace exit sign as discussed, no further inspection required.
2026-07-21BP2025-19365OccupancyAll DirectivesAcceptableCorrect noted deficiencies, then may continue.
2026-07-21BP2025-19365FinalNBC AE 3.4. ExitsAcceptable with ConditionsNBC AE Division B 3.4.5.1. Exit Signs - Exit sign to be swapped out by contractor for compliant green "Running man" version as discussed.
2026-07-10BP2025-19365FinalAll DirectivesNot AcceptableElectrical compliance is required prior to occupancy. - Complete outstanding electrical permit.
2026-07-10BP2025-19365FinalAll DirectivesNot AcceptableSite is not ready for inspection. See deficiencies and recall when ready. - Recall inspection when ready.
2026-05-11BP2025-22754FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed. -Permit completed.
2026-05-06BP2025-22754FinalAll DirectivesNot AcceptableCorrect noted deficiencies and recall building inspection. -Final onsite inspection completed, when EP2026-01752 has been completed email SCO. No onsite inspection required to close out permit.
2026-05-06BP2025-22754FinalAll DirectivesNot AcceptableElectrical compliance is required prior to occupancy. -EP2026-01752 is open and is required to be completed prior to final.
2026-04-24BP2025-22459FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed.
2026-03-06BP2025-19462FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed.
2026-02-27BP2025-14467FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed.
2026-02-05BP2024-26356FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections required. File Closed.

An inspection result is a record of one visit, not a verdict on the building. 97 of these 1,498 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 43 as of 2026-09-24

Licensed businessAddressLicence typeStatusLicensed since
A&W Bow Valley202 6 Ave SWFood Service - Premises (No Seating)Licensed2015
Analog Bow Valley Square205 5 Ave SWFood Service - Premises, Retail Dealer - PremisesLicensed2021
Ark Renewable Energy205 5 Ave SWContractor (No Provincial Licence Required), Distribution ManagerLicensed2024
Bow Valley Athletic Club250 6 Ave SWAlcohol Beverage Sales (Accessory), Food Service - Premises, Massage Centre (Commercial), Personal Service (Fitness Conditioning)Renewal pending2021
Breslauer & Warren Jewellers202 6 Ave SWRetail Dealer - PremisesLicensed2018
Cantak250 6 Ave SWWholesalerLicensed2020
Casemogul250 6 Ave SWRetail Dealer - PremisesRenewal pending2018
Chick Pea (The)202 6 Ave SWFood Service - Premises (No Seating)Licensed2024
Cork Fine Wine, Liquor & Ale250 6 Ave SWLiquor Store, Retail Dealer - PremisesLicensed2012
Downtown Sports Clinics (The) - Bow Valley Square (853)205 5 Ave SWMassage Centre (Commercial)Licensed2020
Element Salon205 5 Ave SWPersonal Service, Retail Dealer - PremisesLicensed2019
Encepta255 5 Ave SWContractor (No Provincial Licence Required)Licensed2024
Flint205 5 Ave SWContractor (No Provincial Licence Required)Renewal pending2023
Garage Billiards Bar & Grill250 6 Ave SWAlcohol Beverage Sales (Drinking Est/Restaurant), Amusement Arcade, Entertainment Establishment, Food Service - Premises (Seating), Outdoor Patio, Tobacco RetailerLicensed2024
Golden Peach Wax Bar205 5 Ave SWPersonal Service, Retail Dealer - PremisesLicensed2026
Hankki Bvs202 6 Ave SWFood Service - Premises (No Seating)Renewal pending2024
Holy Grill205 5 Ave SWAlcohol Beverage Sales (Restaurant), Food Service - Premises (Seating)Renewal pending2019
Imagine Wireless250 6 Ave SWRetail Dealer - PremisesLicensed2014
Iris #605250 6 Ave SWRetail Dealer - PremisesLicensed2001
Jugo Juice205 5 Ave SWFood Service - Premises (No Seating)Licensed2009
Makloc Buildings255 5 Ave SWWholesalerLicensed2023
Mathieson & Hewitt Photographers205 5 Ave SWPhotographerLicensed2026
Mccaws Drilling And Blasting Limited202 6 Ave SWContractor (No Provincial Licence Required)Licensed2023
Mediderm Spa - Bow Valley250 6 Ave SWPersonal Service, Retail Dealer - PremisesRenewal pending2018
Morning Sun Health Foods250 6 Ave SWFood Service - Premises, Retail Dealer - PremisesLicensed2017
Mrgroc Indocan255 5 Ave SWFood Service - Premises, Retail Dealer - Premises, Tobacco Retailer, Vape RetailerLicensed2024
Olly Frescos Bow Valley Square205 5 Ave SWFood Service - PremisesLicensed2024
Our J Store205 5 Ave SWRetail Dealer - Premises, Food Service - PremisesLicensed2023
Pmo Global Services250 6 Ave SWContractor (No Provincial Licence Required)Licensed2022
Printing House (The)250 6 Ave SWManufacturerLicensed2022
Provision Infotech202 6 Ave SWRetail Dealer - PremisesLicensed2024
Shoemasters Quality Shoe Repair205 5 Ave SWRetail Dealer - PremisesLicensed2009
Starbucks Coffee #4935255 5 Ave SWRetail Dealer - Premises, Food Service - Premises (Seating), Outdoor PatioLicensed2009
Stephen Lowe Art Gallery255 5 Ave SWRetail Dealer - PremisesRenewal pending2001
Sushi Party202 6 Ave SWFood Service - Premises (No Seating)Licensed2016
The Licensing Company205 5 Ave SWRetail Dealer - PremisesLicensed2012
Tim Horton'S202 6 Ave SWFood Service - Premises (Seating), Retail Dealer - PremisesRenewal pending2017
Tim Hortons205 5 Ave SWFood Service - Premises (No Seating)Licensed2014
Tom Harris Cellular255 5 Ave SWRetail Dealer - PremisesLicensed2024
Verona Pizza205 5 Ave SWFood Service - Premises (No Seating)Renewal pending2011
Vo Kitchen255 5 Ave SWAlcohol Beverage Sales (Restaurant), Food Service - Premises (Seating)Licensed2017
Wild Orchid Flower Boutique250 6 Ave SWRetail Dealer - Premises, WholesalerRenewal pending2017
Individually licensed practitioner250 6 Ave SWMassage Centre (Commercial)Licensed2017

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown; 1 of the 43 licences on this parcel is withheld on that basis. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • Alberta Wheat Pool Building505 2 St SW41.3 m · built 1962 · Office · Downtown Commercial Core · 87 m
  • Fifth Avenue Place425 1 St SW133.4 m · built 1980 · Office · Downtown Commercial Core · 108 m
  • 316 5 Ave SW114.9 m · built 1978 · Office · Downtown Commercial Core · 133 m
  • 407 2 St SW74.8 m · built 1974 · Office · Downtown Commercial Core · 134 m
  • Intact Place311 6 Ave SW75.8 m · built 1978 · Office · Downtown Commercial Core · 141 m
  • Brookfield Place225 6 Ave SW243.2 m · built 2013 · Office · Downtown Commercial Core · 141 m

Bow Valley Square questions

Answers drawn from the record.

How tall is Bow Valley Square?

The main structure on the parcel has a LiDAR roof height of 147.1 m in The City of Calgary’s 3D building data, a storey-equivalent of about 38 at 3.9 m per storey.

When was Bow Valley Square built?

The City’s assessment roll records 1972 as the year of construction. Wikidata records 1981 as the opening year.

What is the assessed value of Bow Valley Square?

The City of Calgary assesses this parcel at $146.5M in total on the 2026 roll, 18th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is Bow Valley Square zoned?

The parcel is designated DC, Direct Control, under the City of Calgary Land Use Bylaw. Under Direct Control the permitted uses are set by the site’s own bylaw rather than by a standard district. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to Bow Valley Square?

3rd Street SW Station, 238 m in a straight line from the parcel centroid.

Who is in Bow Valley Square?

The City of Calgary business licence register lists 43 licensed businesses at this address or inside the parcel as of 2026-09-24, shown in the occupiers section. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has Bow Valley Square been inspected?

The City publishes 1,498 inspection results against 341 permits here, between 2012-03-23 and 2026-09-04. 146 used a life-safety checklist such as fire separations, firestopping or emergency lighting. 18 used the barrier-free checklist. The most recent occupancy inspection was accepted on 2026-07-21. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at Bow Valley Square?

2,665 scheduled transit trips call within 300 m of the parcel on a representative weekday, 370 of them in the morning peak, across 32 routes. The closest stop is EB 5 AV SW @ 2 ST SW, 28 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at Bow Valley Square?

The best-rated cycling facility within 400 m is a protected lane, 290 m away. The parcel fronts a Priority 1 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at Bow Valley Square?

The City of Calgary's tariff record shows 316 paid on-street stalls in 48 zones within 200 m of the parcel, at $1.00 to $4.75 per hour. The closest is 6 Av SW, Fr 1 St SW To 2 St SW, 3 m away. Loading bays, taxi stands, accessible stalls and off-street parkades are not counted, and rates change, so confirm on the sign.

Is office space available at Bow Valley Square?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.