COMMERCIALLY.caOfficeBuildings.ca
OfficeBuildings.ca / Greenview Industrial Park · Calgary office building record
Greenview Industrial Park · Calgary office building record

625 42 Ave NE

Office use recorded by City permits (roll code X034) · low-rise office building · built 1976 · 625 42 Ave NE

3D render of 625 42 Ave NE, a 4.3 m low-rise office building in Greenview Industrial Park, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 625 42 Ave NE highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

625 42 Ave NE is a 4.3 m low-rise office building in Greenview Industrial Park, Calgary, recorded on the City assessment roll as built in 1976. Its main structure is the 764th tallest office roof of the 775 ranked in this record, and 3rd of 3 in Greenview Industrial Park. The City assesses the parcel at $4.1M on the 2026 roll, 419th of 822 sites in the record by assessed value. 264 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 10 building permits and 6 development permits on the parcel, the largest a $250,000 lab permit for alteration, applied for in 2021.

LiDAR roof height4.3 m
Storey-equivalent (derived)1
Footprint3,269 m²
Parcel12,975 m²
Year built (roll)1976
Assessed 2026$4.1M
Structures on parcel1
Nearest CTrain4.2 km
Civic address
625 42 Ave NE, Calgary, AB
Community
Greenview Industrial Park (GRI)
City sub-property use
X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
Land use district
I-G — Industrial - General (Industrial)
Height rank
#764 of 785 citywide · #3 of 3 in Greenview Industrial Park
Footprint to parcel
25% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 034199505
Coordinates
51.090239, -114.050229
Why this building is in the record

The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 7 permits in the City’s Office classes between 2001 and 2019. The building may hold other uses as well. Every building included this way.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

4.3 mN20 mLiDAR roof outlines · City of Calgary · true scale
4.3 m · 3,269 m²
2.8 m structure4.1 m structure4.3 m structure5.5 m structure7.6 m structure8.1 m structure8.3 m structure8.7 m structure8.7 m structure4.3 m · 3,269 m² footprintN50 mFootprints within 215 m · City of Calgary
Context within 215 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Greenview Industrial Park median and tallest, and against the city.

625 42 Ave NE4.3 mGreenview Industrial Park median8.3 mGreenview Industrial Park tallest9.9 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: SAIT/ACAD/Jubilee, 4.2 km straight-line (route 201). Planned Green Line station 40 Avenue N is 892 m away (TBD, per the City’s Green Line map).

Plus 15

Outside the Plus 15 network area.

Cycling

The best-rated cycling facility within 400 m of the parcel is a major street (On-Street Bikeway), 88 m away.

Winter access

The parcel fronts a Priority 2 snow and ice clearing route, 13 m from its edge. Priority 2 routes are cleared after the Priority 1 network.

Accessible crossing

No accessible pedestrian signal lies within 400 m of the parcel.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

264 scheduled transit trips call within 300 m of this parcel on a representative weekday, 31 of them between 07:00 and 09:00, across 3 routes and 9 stops. The closest stop is NB 32 AV NE @ 6 ST NE, 155 m away.

Service classTrips on the service day
REGULAR264

Routes: 4 Huntington · 5 North Haven · 38 North Crosstown.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 034199505 · X034

$0$1.4M$2.8M$4.3M$5.7M200520082011201420172020202320262005 roll: $2.2M2006 roll: $2.4M2007 roll: $3.4M2008 roll: $3.4M2009 roll: $3.8M2010 roll: $4.7M2011 roll: $2.7M2012 roll: $2.8M2013 roll: $3.5M2014 roll: $4.0M2015 roll: $4.7M2016 roll: $5.3M2017 roll: $5.0M2018 roll: $4.0M2019 roll: $3.9M2020 roll: $3.4M2021 roll: $3.6M2022 roll: $3.7M2023 roll: $3.5M2024 roll: $3.5M2025 roll: $3.8M2026 roll: $4.1M$4.1M (2026)
Published values by roll year
Roll yearAssessed valueChange
2005$2.2M—
2006$2.4M8.8%
2007$3.4M44.3%
2008$3.4M-1.2%
2009$3.8M11.9%
2010$4.7M26.4%
2011$2.7M-42.6%
2012$2.8M3.7%
2013$3.5M25.5%
2014$4.0M12.1%
2015$4.7M17.6%
2016$5.3M12.6%
2017$5.0M-4.4%
2018$4.0M-19.7%
2019$3.9M-4.2%
2020$3.4M-11.4%
2021$3.6M5.0%
2022$3.7M2.5%
2023$3.5M-4.6%
2024$3.5M0.0%
2025$3.8M8.5%
2026$4.1M8.1%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

0242012: 0 development permits2012: 0 building permits122013: 0 development permits2013: 1 building permit132014: 0 development permits2014: 0 building permits142015: 0 development permits2015: 0 building permits152016: 0 development permits2016: 0 building permits162017: 0 development permits2017: 1 building permit172018: 0 development permits2018: 0 building permits182019: 4 development permits2019: 2 building permits192020: 1 development permit2020: 1 building permit202021: 1 development permit2021: 2 building permits212022: 0 development permits2022: 2 building permits222023: 0 development permits2023: 0 building permits232024: 0 development permits2024: 0 building permits242025: 0 development permits2025: 0 building permits252026: 0 development permits2026: 1 building permit26Development permitsBuilding permits (non-residential)

Recent development permits 6 since 2012

AppliedPermitCategory · descriptionStatus
2021-06-02DP2021-3971Signs - Permitted Use
NEW: SIGN - CLASS B (FASCIA SIGN)
Released
Approval
2020-12-21DP2020-8242Change of Use - Permitted Use
CHANGE OF USE: GENERAL INDUSTRIAL - LIGHT
Released
Approval
2019-11-12DP2019-5806Renovations - Non-Residential
CHANGE OF USE: CHILD CARE SERVICE (179 CHILDREN); CHANGES TO SITE PLAN: CHILD CARE SERVICE (OUTDOOR PLAY AREA EXPANSION)
Released
Approval
2019-05-21DP2019-2520Signs - Permitted Use
NEW: SIGN - CLASS B (FASCIA SIGN)
Cancelled
2019-05-13DP2019-2363Signs - Permitted Use
NEW: SIGN - CLASS B (FASCIA SIGNS - 2)
Released
Approval
2019-03-12DP2019-1152Change of Use - With Change to Site Plan
CHANGES TO SITE PLAN: CHILD CARE SERVICE (PARKING AND GARBAGE); CHANGE OF USE: CHILD CARE SERVICE (75 CHILDREN), EXTERIOR RENOVATIONS: CHILD CARE SERVICE (DOORS AND WINDOWS)
Released
Approval

Recent building permits 10 since 2012 · 3 in the City’s office class

AppliedPermitClass · workEst. costStatus
2026-05-26BP2026-092067103 - Special Function - Class 1 · Temporary
Special Event Tents
$850Completed
2022-11-16BP2022-189185301 - Child Care Facility · Alteration
Interior Alteration, Little Scholars Daycare - Greenview, A2
$3,000Completed
2022-04-07BP2022-055387103 - Special Function - Class 1 · Temporary
Group A2 - Temporary Tents
—Completed
2021-11-10BP2021-194545301 - Child Care Facility · Alteration
Little Scholars Daycare - Greenview Expansion
$120,000Completed
2021-02-12BP2021-022115203 - Lab · Alteration
Interior alteration for a new tenant - Labco
$250,000Completed
2020-01-28BP2020-010355105 - Day-Care · Alteration
Little Scholars Daycare interior partitioning.
$145,000Completed
2019-07-09BP2019-089015301 - Child Care Facility · Alteration
Interior Alteration - Little Scholars Day Care
$205,000Completed
2019-01-15BP2019-004413402 - Office · Alteration
World Financial Group - Tenant Improvement
$229,000Completed

Declared estimated project cost across all 10 non-residential building permits on the parcel since 2012: $1.1M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

52 inspection results are published against 8 of the 10 building permits on this parcel, from 2013-10-29 to 2023-02-28. The most recent occupancy inspection was accepted on 2020-06-19. 11 inspections used a life-safety checklist and 2 a barrier-free checklist.

What was inspected

01020Fire separations and fire resistance: 66Fireseparations and fire resistanceFirestopping: 55FirestoppingBarrier-free: 22Barrier-freeDocuments and directives: 2424Documentsand directives

Result of each visit

OutcomeInspections
Acceptable with Conditions17
Acceptable Add Inspection17
Not Acceptable12
Acceptable6

Stage

Inspection typeCount
Progress33
Final16
Occupancy3
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2023-02-28BP2022-18918ProgressField Level Hazard Assessment (FLHA)AcceptableField Level Hazard Assessment: Weather-partly cloudy, -13`C, ground snow/ice conditions. Guards, Handrails and Fencing in place. No hazards observed. Hard Hat, Boots and Vest worn.
2023-02-28BP2022-18918ProgressGeneral Inspection ObservationsAcceptableAlteration Inspection Observations were: - Construction as per plans. Received fire alarm VI, Exit signage in place.
2022-07-08BP2022-05538FinalDirectivesAcceptable with ConditionsContractor to complete items, then may continue
2022-07-08BP2022-05538Final—Acceptable with Conditions- Please add additional weight anchorage for tents as discussed.
2022-07-08BP2022-05538FinalGeneral Inspection ObservationsAcceptable with Conditions- Tents set up for seating and food prep area. BBQ located 2.5m away from tent. Dunk tank, mechanical bull on site - no safety concerns.
2022-02-28BP2021-19454FinalDirectivesAcceptableFinal inspection is complete. All required documents have been received.
2022-01-20BP2021-19454ProgressDocuments CommercialAcceptable with ConditionsSchedule C-2 from the Registered Professional of Record To be provided prior to final inspection.
2022-01-20BP2021-19454ProgressDocuments CommercialAcceptable with ConditionsFire Alarm Verification To be provided by final inspection.
2022-01-20BP2021-19454ProgressDocuments CommercialAcceptable with ConditionsRequire Fire Stop Test Design Summary Systems for all service penetrations through demising walls to be provided by final inspection.
2022-01-20BP2021-19454ProgressDocuments CommercialAcceptable with ConditionsSprinkler Verification to be provided to ensure new expansion work (which indicates NO sprinklers were added to new expansion) did not effect the existing system as noted. To be provided by final inspection.
2022-01-20BP2021-19454ProgressDirectivesAcceptable with ConditionsContractor to complete items, then may continue Call for final inspection when ready.
2022-01-20BP2021-19454ProgressFire Resistance & Fire Separations Part 3Acceptable with Conditions3.1.8 Openings in fire separation require closures Proper dampers in existing fire separation to be competed prior to continuing.
2022-01-20BP2021-19454ProgressFire Resistance & Fire Separations Part 3Acceptable with Conditions—
2022-01-20BP2021-19454ProgressDocuments CommercialAcceptable with ConditionsSchedule C-1 from the Coordinating Registered Professional To be provided prior to final inspection.

An inspection result is a record of one visit, not a verdict on the building. 12 of these 52 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 0 as of 2026-09-24

No City of Calgary business licence is recorded at this address or inside this parcel.

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 3916 1 St NE8.3 m · built 1956 · Small Office · Greenview Industrial Park · 711 m
  • 201 38 Ave NE9.9 m · built 1979 · Small Office · Greenview Industrial Park · 768 m
  • 76 Skyline Cres NE8.7 m · built 1982 · Small Office · Skyline West · 894 m
  • 4103 Centre St NW5.6 m · built 1975 · Small Office · Highland Park · 900 m
  • 4803 Centre St NW9.1 m · built 1979 · Small Office · Thorncliffe · 1.0 km
  • 4311 12 St NE6.6 m · built 2007 · Office use recorded by City permits (roll code X034) · Mccall · 1.1 km

625 42 Ave NE questions

Answers drawn from the record.

How tall is 625 42 Ave NE?

The main structure on the parcel has a LiDAR roof height of 4.3 m in The City of Calgary’s 3D building data, a storey-equivalent of about 1 at 3.9 m per storey.

When was 625 42 Ave NE built?

The City’s assessment roll records 1976 as the year of construction.

What is the assessed value of 625 42 Ave NE?

The City of Calgary assesses this parcel at $4.1M in total on the 2026 roll, 419th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 625 42 Ave NE zoned?

The parcel is designated I-G, Industrial - General, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 625 42 Ave NE?

SAIT/ACAD/Jubilee Station, 4.2 km in a straight line from the parcel centroid.

Who is in 625 42 Ave NE?

No City of Calgary business licence is recorded at this address or inside the parcel. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 625 42 Ave NE been inspected?

The City publishes 52 inspection results against 8 permits here, between 2013-10-29 and 2023-02-28. 11 used a life-safety checklist such as fire separations, firestopping or emergency lighting. 2 used the barrier-free checklist. The most recent occupancy inspection was accepted on 2020-06-19. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 625 42 Ave NE?

264 scheduled transit trips call within 300 m of the parcel on a representative weekday, 31 of them in the morning peak, across 3 routes. The closest stop is NB 32 AV NE @ 6 ST NE, 155 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at 625 42 Ave NE?

The best-rated cycling facility within 400 m is a major street, 88 m away. The parcel fronts a Priority 2 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at 625 42 Ave NE?

No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.

Is office space available at 625 42 Ave NE?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.