COMMERCIALLY.caOfficeBuildings.ca
OfficeBuildings.ca / Manchester · Calgary office building record
Manchester · Calgary office building record

5819 2 St SW

Office use recorded by City permits (roll code X034) · mid-rise office building · built 1971 · 5819 2 St SW

3D render of 5819 2 St SW, a 17 m mid-rise office building in Manchester, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 5819 2 St SW highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

5819 2 St SW is a 17 m mid-rise office building in Manchester, Calgary, recorded on the City assessment roll as built in 1971. Its main structure is the 311th tallest office roof of the 775 ranked in this record, and 5th of 21 in Manchester. The City assesses the parcel at $2.5M on the 2026 roll, 576th of 822 sites in the record by assessed value. The nearest CTrain platform is Chinook, 599 m away in a straight line. 215 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 10 building permits and 0 development permits on the parcel, the largest an $840,000 office permit for alteration, applied for in 2013.

LiDAR roof height17 m
Storey-equivalent (derived)4
Footprint938 m²
Parcel1,069 m²
Year built (roll)1971
Assessed 2026$2.5M
Structures on parcel1
Nearest CTrain599 m
Civic address
5819 2 St SW, Calgary, AB
Community
Manchester (MAN)
City sub-property use
X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
Land use district
C-O — Commercial - Office (Commercial)
Height rank
#311 of 785 citywide · #5 of 21 in Manchester
Footprint to parcel
88% of the parcel under LiDAR footprints
Parcel pieces
2 titled pieces · roll 101029692
Coordinates
51.00181, -114.069037
Why this building is in the record

The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 14 permits in the City’s Office classes between 2001 and 2025. The building may hold other uses as well. Every building included this way.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

17 mN20 mLiDAR roof outlines · City of Calgary · true scale
17 m · 938 m²
2.6 m structure2.7 m structure3.5 m structure4.2 m structure4.2 m structure4.2 m structure5.7 m structure6.3 m structure6.8 m structure7.1 m structure7.7 m structure8.2 m structure8.2 m structure8.4 m structure10.3 m structure12 m structure14.1 m structure16.8 m structure22.5 m structure39.5 m structure44.2 m structure17 m · 938 m² footprintN50 mFootprints within 150 m · City of Calgary
Context within 150 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Manchester median and tallest, and against the city.

5819 2 St SW17 mManchester median9 mManchester tallest44.2 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: Chinook, 599 m straight-line (route 201).

Other office buildings near Chinook Station →

Plus 15

Outside the Plus 15 network area.

Cycling

No mapped bikeway lies within 400 m of the parcel.

Winter access

The parcel fronts a Priority 1 snow and ice clearing route, 19 m from its edge. Priority 1 routes are cleared first after a snowfall.

Accessible crossing

The nearest accessible pedestrian signal is at Chinook Tunnel Entrance and Macleod Trail, 326 m from the parcel. The closest signalised crossing, 58 Avenue and 2 Street at 57 m, has no accessible signal recorded.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

215 scheduled transit trips call within 300 m of this parcel on a representative weekday, 25 of them between 07:00 and 09:00, across 3 routes and 7 stops. The closest stop is EB 58 AV SW @ 3 ST SW, 57 m away.

Service classTrips on the service day
REGULAR215

Routes: 9 Dalhousie Station/Chinook Station · 10 City Hall/Southcentre · 81 Macleod Tr S.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 101029692 · X034

$0$1.5M$2.9M$4.4M$5.8M200520082011201420172020202320262005 roll: $2.3M2006 roll: $2.5M2007 roll: $3.5M2008 roll: $4.7M2009 roll: $4.9M2010 roll: $3.9M2011 roll: $3.1M2012 roll: $3.4M2013 roll: $4.8M2014 roll: $4.6M2015 roll: $5.2M2016 roll: $5.4M2017 roll: $4.8M2018 roll: $2.7M2019 roll: $2.9M2020 roll: $3.2M2021 roll: $2.7M2022 roll: $2.0M2023 roll: $1.8M2024 roll: $2.4M2025 roll: $2.5M2026 roll: $2.5M$2.5M (2026)
Published values by roll year
Roll yearAssessed valueChange
2005$2.3M—
2006$2.5M9.3%
2007$3.5M41.5%
2008$4.7M33.6%
2009$4.9M4.9%
2010$3.9M-20.5%
2011$3.1M-21.7%
2012$3.4M11.8%
2013$4.8M41.5%
2014$4.6M-5.4%
2015$5.2M13.1%
2016$5.4M3.9%
2017$4.8M-10.2%
2018$2.7M-43.9%
2019$2.9M5.2%
2020$3.2M12.6%
2021$2.7M-15.6%
2022$2.0M-24.7%
2023$1.8M-10.3%
2024$2.4M32.8%
2025$2.5M3.3%
2026$2.5M-1.2%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

0242012: 0 development permits2012: 2 building permits122013: 0 development permits2013: 1 building permit132014: 0 development permits2014: 0 building permits142015: 0 development permits2015: 4 building permits152016: 0 development permits2016: 0 building permits162017: 0 development permits2017: 0 building permits172018: 0 development permits2018: 0 building permits182019: 0 development permits2019: 0 building permits192020: 0 development permits2020: 0 building permits202021: 0 development permits2021: 0 building permits212022: 0 development permits2022: 0 building permits222023: 0 development permits2023: 0 building permits232024: 0 development permits2024: 0 building permits242025: 0 development permits2025: 3 building permits252026: 0 development permits2026: 0 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 0 since 2012

None located on this parcel since 2012.

Recent building permits 10 since 2012 · 7 in the City’s office class

AppliedPermitClass · workEst. costStatus
2025-08-29BP2025-169283402 - Office · Alteration
Office Interior Alteration
$50,000Completed
2025-08-12BP2025-156373710 - Massage · Alteration
Interior Alterations
—Completed
2025-02-21BP2025-029933402 - Office · Alteration
Interior Alterations
$200,000Completed
2015-11-23BP2015-151803402 - Office · Alteration
interior alteration to exsiting office
$92,500Completed
2015-08-05BP2015-099865299 - Medical Misc. · Alteration
New Tenant - Group D
$150,000Completed
2015-06-12BP2015-070443402 - Office · Alteration
Office alteration
$65,000Completed
2015-03-03BP2015-021984002 - Vacant · Alteration
Interior demolition
$12,000Completed
2013-11-25BP2013-175823402 - Office · Alteration
Exterior Cladding
$840,000Completed

Declared estimated project cost across all 10 non-residential building permits on the parcel since 2012: $1.5M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

19 inspection results are published against 7 of the 10 building permits on this parcel, from 2012-05-04 to 2025-11-06. 2 inspections used a life-safety checklist.

What was inspected

051015Fire separations and fire resistance: 11Fireseparations and fire resistanceFirestopping: 11FirestoppingDocuments and directives: 1515Documentsand directives

Result of each visit

OutcomeInspections
Acceptable11
Acceptable Add Inspection5
Not Acceptable3

Stage

Inspection typeCount
Progress8
Framing6
Final5
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2025-11-06BP2025-15637ProgressAll DirectivesAcceptableNo infractions noted. Call for Final Inspection next.
2025-06-18BP2025-02993FinalAll DocumentsNot AcceptableNBC AE Division C 2.4.2. Schedules of Professional Involvement - Missing documents for Architect for C1 and C2 sign offs.
2025-06-18BP2025-02993FinalAll DirectivesNot AcceptableCorrect noted deficiencies and recall building inspection. - Recall inspection when all documentations can be provided to SCO.
2016-02-12BP2015-09986FinalDIRECTIVESNot AcceptableFinal inspection, Fire SCO has to approve. Ok to occupy at this time. Temporary occupancy. Call for inspection once Fire has signed off.
2016-01-08BP2015-15180ProgressFIRE RESISTANCE & FIRE SEPARATIONS PT 3Acceptable Add InspectionRevised plan reflects that the west demising wall is framed and drywalled to the underside of the roof deck. This may not be necessary depending on future tenant in the adjoining space. Plans should reflect the construction.
2016-01-08BP2015-15180ProgressDOCUMENTS CommercialAcceptable Add InspectionFire Alarm Verification required for Final.
2016-01-08BP2015-15180ProgressDOCUMENTS CommercialAcceptable Add InspectionOccupancy Application required at Final with sign off from electrical, mechanical, plumbing, and Fire.
2016-01-08BP2015-15180ProgressDOCUMENTS CommercialAcceptable Add Inspectionrequired for Final.
2016-01-08BP2015-15180ProgressDIRECTIVESAcceptable Add InspectionFirestopping of floor penetrations complete. Ok to continue with construction.
2015-12-22BP2015-09986FramingDIRECTIVESAcceptableFirestopping in walls complete. Ok to continue.
2015-12-02BP2015-09986FramingDIRECTIVESAcceptableContractor can drywall one side of walls. Leave other side open so Firestopping can be inspected. Ok to drywall area above slab on grade.
2015-12-02BP2015-09986FramingDIRECTIVESAcceptableContractor to complete items, then may continue . Call for progress inspection once Firestopping can be inspected.
2015-12-02BP2015-09986FramingFIRESTOPPINGAcceptableFire stopping to be an approved tested method. Holes where services pass through main floor need to be firestopped. Old holes or openings not being used need to be firestopped also. A Firestopping contractor should complete this work after services are installed. Listings of Firestopping used can be supplied by this co
2015-12-02BP2015-09986FramingDOCUMENTS CommercialAcceptableSprinkler Verification required for Final inspection. Sprinkler moves and additions are required. Sprinkler Contractor needs to be contracted.

An inspection result is a record of one visit, not a verdict on the building. 3 of these 19 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 2 as of 2026-09-24

Licensed businessAddressLicence typeStatusLicensed since
D Luxe Agency5819 2 St SWPhotographerLicensed2025
Kinetica Plus5819 2 St SWMassage Centre (Commercial), Personal Service (Fitness Conditioning), Retail Dealer - PremisesRenewal pending2025

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 307 57 Ave SW44.2 m · built 1981 · Office Condo · Manchester · 38 m
  • 5824 2 St SW12 m · built 1979 · Office use recorded by City permits (roll code X034) · Manchester · 59 m
  • 5810 2 St SW8.2 m · built 1979 · Small Office · Manchester · 62 m
  • 5800 2 St SW8.2 m · built 1979 · Small Office · Manchester · 79 m
  • 222 58 Ave SW22.5 m · built 1981 · Office use recorded by City permits (roll code X034) · Manchester · 103 m
  • 5807 1A St SW7.7 m · built 1979 · Small Office · Manchester · 107 m

5819 2 St SW questions

Answers drawn from the record.

How tall is 5819 2 St SW?

The main structure on the parcel has a LiDAR roof height of 17 m in The City of Calgary’s 3D building data, a storey-equivalent of about 4 at 3.9 m per storey.

When was 5819 2 St SW built?

The City’s assessment roll records 1971 as the year of construction.

What is the assessed value of 5819 2 St SW?

The City of Calgary assesses this parcel at $2.5M in total on the 2026 roll, 576th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 5819 2 St SW zoned?

The parcel is designated C-O, Commercial - Office, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 5819 2 St SW?

Chinook Station, 599 m in a straight line from the parcel centroid.

Who is in 5819 2 St SW?

The City of Calgary business licence register lists 2 licensed businesses at this address or inside the parcel as of 2026-09-24, shown in the occupiers section. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 5819 2 St SW been inspected?

The City publishes 19 inspection results against 7 permits here, between 2012-05-04 and 2025-11-06. 2 used a life-safety checklist such as fire separations, firestopping or emergency lighting. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 5819 2 St SW?

215 scheduled transit trips call within 300 m of the parcel on a representative weekday, 25 of them in the morning peak, across 3 routes. The closest stop is EB 58 AV SW @ 3 ST SW, 57 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at 5819 2 St SW?

No mapped bikeway lies within 400 m. The parcel fronts a Priority 1 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at 5819 2 St SW?

No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.

Is office space available at 5819 2 St SW?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.