COMMERCIALLY.caOfficeBuildings.ca
OfficeBuildings.ca / Skyline East · Calgary office building record
Skyline East · Calgary office building record

5055 11 St NE

Office use recorded by City permits (roll code X034) · mid-rise office building · built 2000 · 5055 11 St NE

3D render of 5055 11 St NE, an 18.2 m mid-rise office building in Skyline East, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 5055 11 St NE highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

5055 11 St NE is an 18.2 m mid-rise office building in Skyline East, Calgary, recorded on the City assessment roll as built in 2000. Its main structure is the 290th tallest office roof of the 775 ranked in this record, and the tallest in Skyline East. The City assesses the parcel at $7.9M on the 2026 roll, 238th of 822 sites in the record by assessed value. 102 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 5 building permits and 5 development permits on the parcel, the largest a $3.6M office permit for alteration, applied for in 2021.

LiDAR roof height18.2 m
Storey-equivalent (derived)5
Footprint1,738 m²
Parcel17,979 m²
Year built (roll)2000
Assessed 2026$7.9M
Structures on parcel3
Nearest CTrain4.1 km
Civic address
5055 11 St NE, Calgary, AB
Community
Skyline East (SKE)
City sub-property use
X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
Land use district
I-B — Industrial - Business (Industrial)
Height rank
#290 of 785 citywide · #1 of 5 in Skyline East
Footprint to parcel
10% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 024024507
Coordinates
51.098185, -114.037451
Why this building is in the record

The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 5 permits in the City’s Office classes between 2010 and 2021. The building may hold other uses as well. Every building included this way.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

18.2 mN20 mLiDAR roof outlines · City of Calgary · true scale
18.2 m · 1,686 m² · 3.4 m · 42 m² · 2.9 m · 10 m²
3.2 m structure5.5 m structure5.8 m structure6.2 m structure6.7 m structure8.1 m structure8.5 m structure8.8 m structure9.5 m structure9.7 m structure10 m structure2.9 m · 10 m² footprint3.4 m · 42 m² footprint18.2 m · 1,686 m² footprintN50 mFootprints within 237 m · City of Calgary
Context within 237 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Skyline East median and tallest, and against the city.

5055 11 St NE18.2 mSkyline East median8.5 mSkyline East tallest18.2 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: Whitehorn, 4.1 km straight-line (route 202).

Plus 15

Outside the Plus 15 network area.

Cycling

No mapped bikeway lies within 400 m of the parcel.

Winter access

The parcel fronts a Priority 1 snow and ice clearing route, 15 m from its edge. Priority 1 routes are cleared first after a snowfall.

Accessible crossing

The nearest accessible pedestrian signal is at 49 Avenue and Aviation Boulevard, 323 m from the parcel. The closest signalised crossing, 53 Avenue/Aviation Park and 11 Street at 222 m, has no accessible signal recorded.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

102 scheduled transit trips call within 300 m of this parcel on a representative weekday, 15 of them between 07:00 and 09:00, across 1 route and 5 stops. The closest stop is NB 11 ST NE @ 49 AV NE, 87 m away.

Service classTrips on the service day
REGULAR102

Routes: 32 Huntington/Sunridge.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 024024507 · X034

$0$4.3M$8.5M$12.8M$17.0M200520082011201420172020202320262005 roll: $9.1M2006 roll: $10.1M2007 roll: $13.1M2008 roll: $13.8M2009 roll: $15.8M2010 roll: $8.1M2011 roll: $10.0M2012 roll: $10.5M2013 roll: $12.9M2014 roll: $13.5M2015 roll: $15.4M2016 roll: $15.5M2017 roll: $13.9M2018 roll: $12.2M2019 roll: $9.9M2020 roll: $9.1M2021 roll: $10.7M2022 roll: $5.6M2023 roll: $6.1M2024 roll: $7.2M2025 roll: $8.0M2026 roll: $7.9M$7.9M (2026)
Published values by roll year
Roll yearAssessed valueChange
2005$9.1M—
2006$10.1M11.5%
2007$13.1M29.8%
2008$13.8M5.2%
2009$15.8M14.3%
2010$8.1M-48.5%
2011$10.0M22.7%
2012$10.5M5.1%
2013$12.9M23.2%
2014$13.5M4.6%
2015$15.4M13.9%
2016$15.5M0.9%
2017$13.9M-10.5%
2018$12.2M-12.2%
2019$9.9M-18.6%
2020$9.1M-8.1%
2021$10.7M16.9%
2022$5.6M-47.5%
2023$6.1M8.9%
2024$7.2M17.2%
2025$8.0M12.2%
2026$7.9M-2.0%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

0122012: 1 development permit2012: 2 building permits122013: 0 development permits2013: 0 building permits132014: 0 development permits2014: 1 building permit142015: 1 development permit2015: 0 building permits152016: 0 development permits2016: 0 building permits162017: 0 development permits2017: 0 building permits172018: 1 development permit2018: 1 building permit182019: 0 development permits2019: 0 building permits192020: 0 development permits2020: 0 building permits202021: 0 development permits2021: 1 building permit212022: 2 development permits2022: 0 building permits222023: 0 development permits2023: 0 building permits232024: 0 development permits2024: 0 building permits242025: 0 development permits2025: 0 building permits252026: 0 development permits2026: 0 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 5 since 2012

AppliedPermitCategory · descriptionStatus
2022-04-15DP2022-02589Signs - Permitted Use with Relaxation
NEW: SIGN - CLASS B (FASCIA SIGNS - 3) - SIGNABLE AREA
Released
Approval
2022-02-05DP2022-00769Signs - Permitted Use with Relaxation
NEW: SIGN - CLASS B (FASCIA SIGNS - 3) - SIGNABLE AREA
Released
Approval
2018-04-17DP2018-1527Temporary Structure
TEMPORARY USE: OFFICE (ACCUMULATOR)
Released
Approval
2015-04-14DP2015-1441Temporary Structure
TEMPORARY USE: OFFICE (ACCUMULATOR) - 3 YEARS
Expired
Approval
2012-04-25DP2012-1655Temporary Structure
TEMPORARY USE: OFFICE (ACCUMULATOR) - 3 YEARS
Expired
Approval

Recent building permits 5 since 2012 · 4 in the City’s office class

AppliedPermitClass · workEst. costStatus
2021-11-26BP2021-202993402 - Office · Alteration
Tricycle & Burnco
$3.6MCompleted
2018-11-05BP2018-146573402 - Office · Alteration
interior alteration - public washrooms
$60,000Completed
2014-01-08BP2014-002133402 - Office · Alteration
Fire alarm upgrade
$23,000Completed
2012-08-15BP2012-113342399 - Indust/Utility Misc. · New
Temp Structure - testing unit on skids
$5,000Completed
2012-03-30BP2012-035843402 - Office · Alteration
Interior Partioning
$147,000Completed

Declared estimated project cost across all 5 non-residential building permits on the parcel since 2012: $3.9M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

21 inspection results are published against 5 of the 5 building permits on this parcel, from 2012-06-27 to 2022-12-20. The most recent occupancy inspection was accepted on 2014-02-27. 2 inspections used a life-safety checklist.

What was inspected

0510Fire separations and fire resistance: 11Fireseparations and fire resistanceDocuments and directives: 1212Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection16
Acceptable with Conditions3
Acceptable2

Stage

Inspection typeCount
Progress14
Final6
Occupancy1
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2022-12-20BP2021-20299FinalField Level Hazard Assessment (FLHA)Acceptable with ConditionsField Level Hazard Assessment: Conditions were extremely cold and snowy. No unsafe conditions identified. Safety boots and vest worn.
2022-12-20BP2021-20299FinalDirectivesAcceptable with ConditionsContractor to complete items, then may continue Occupancy granted
2022-12-20BP2021-20299FinalGeneral Inspection ObservationsAcceptable with ConditionsAlteration Inspection Observations were: Alteration completed as per submitted documentation. C1 and C2 schedules received reviewed and to be uploaded to file as required. Sprinkler and fire VI¿S received, reviewed and to be uploaded to file as required. Current deficiencies are as noted.
2022-05-31BP2021-20299Final—Acceptable Add InspectionReceived partial C1/C2's Arch, Elec, Sprinkler Vi, Fire Stop Systems. Still outstanding is the new FA system and new RTU's. A letter from Johnson Controls stating that new FA devices are scheduled for Aug 2022. Permission is granted to start using the building under the constraints of the emergency plan.
2022-05-25BP2021-20299Final—Acceptable Add InspectionContractor is wanting partial use of the building while waiting for new RTU's and parts for the FA system. An Interim Fire Watch plan has be submitted with the help of the Fire Marshal. In order to gain partial use a partial C1 is required from the Coordinating Professional stating what areas are approved, and the Spri
2022-05-25BP2021-20299FinalFire Resistance & Fire Separations Part 3Acceptable Add Inspection3.1.8.11 Self-closer required on door in fire separation and doors are to be labeled, (see Mech Rm doors on the lower floor.
2022-02-09BP2021-20299ProgressFire StoppingAcceptable Add InspectionFire stopping to be an approved tested method. Provide systems for each application.
2022-02-09BP2021-20299Progress—Acceptable Add InspectionWork is proceeding. Reviewed fire stopping on 3rd floor. Discussed possible Phasing of floors for finals. Life safety systems are to be maintained throughout and a letter from the Cooridinating Professional will be required stating that field reviews I those areas are complete ant area are ready to be re occupied.
2022-02-09BP2021-20299ProgressDocuments CommercialAcceptable Add InspectionSprinkler Verification is required
2022-02-09BP2021-20299ProgressDocuments CommercialAcceptable Add InspectionFire Alarm Verification is required.
2022-02-09BP2021-20299ProgressDocuments CommercialAcceptable Add InspectionC1 and/or C2 letters required
2018-12-03BP2018-14657Progress—Acceptable Add InspectionNo one on site. Demo has started. Ensure to maintain existing non conforming barrier free design. Call when ready for final.
2014-02-27BP2014-00213Occupancy—AcceptableReceived fire alarm verification file complete
2013-08-08BP2012-11334ProgressDIRECTIVESAcceptablestructure installed and in use

An inspection result is a record of one visit, not a verdict on the building. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 0 as of 2026-09-24

No City of Calgary business licence is recorded at this address or inside this parcel.

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 1107 53 Ave NE8.1 m · built 2008 · Office use recorded by City permits (roll code X034) · Skyline East · 176 m
  • 1001 53 Ave NE8.5 m · built 1980 · Small Office · Skyline East · 205 m
  • 5160 Skyline Way NE8.3 m · built 1979 · Small Office · Skyline East · 299 m
  • 76 Skyline Cres NE8.7 m · built 1982 · Small Office · Skyline West · 482 m
  • 808 55 Ave NE11.9 m · built 1983 · Office use recorded by City permits (roll code X034) · Skyline East · 702 m
  • 1111 57 Ave NE12 m · built 2002 · Office use recorded by City permits (roll code X034) · Deerfoot Business Centre · 823 m

5055 11 St NE questions

Answers drawn from the record.

How tall is 5055 11 St NE?

The main structure on the parcel has a LiDAR roof height of 18.2 m in The City of Calgary’s 3D building data, a storey-equivalent of about 5 at 3.9 m per storey.

When was 5055 11 St NE built?

The City’s assessment roll records 2000 as the year of construction.

What is the assessed value of 5055 11 St NE?

The City of Calgary assesses this parcel at $7.9M in total on the 2026 roll, 238th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 5055 11 St NE zoned?

The parcel is designated I-B, Industrial - Business, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 5055 11 St NE?

Whitehorn Station, 4.1 km in a straight line from the parcel centroid.

Who is in 5055 11 St NE?

No City of Calgary business licence is recorded at this address or inside the parcel. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 5055 11 St NE been inspected?

The City publishes 21 inspection results against 5 permits here, between 2012-06-27 and 2022-12-20. 2 used a life-safety checklist such as fire separations, firestopping or emergency lighting. The most recent occupancy inspection was accepted on 2014-02-27. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 5055 11 St NE?

102 scheduled transit trips call within 300 m of the parcel on a representative weekday, 15 of them in the morning peak, across 1 route. The closest stop is NB 11 ST NE @ 49 AV NE, 87 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at 5055 11 St NE?

No mapped bikeway lies within 400 m. The parcel fronts a Priority 1 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at 5055 11 St NE?

No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.

Is office space available at 5055 11 St NE?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.