808 55 Ave NE
Office use recorded by City permits (roll code X034) · low-rise office building · built 1983 · 808 55 Ave NE

808 55 Ave NE is an 11.9 m low-rise office building in Skyline East, Calgary, recorded on the City assessment roll as built in 1983. Its main structure is the 444th tallest office roof of the 775 ranked in this record, and 2nd of 5 in Skyline East. The City assesses the parcel at $6.9M on the 2026 roll, 269th of 822 sites in the record by assessed value. Since 2012 the City has recorded 11 building permits and 3 development permits on the parcel, the largest a $905,574 day-care permit for alteration, applied for in 2014.
- Civic address
- 808 55 Ave NE, Calgary, AB
- Community
- Skyline East (SKE)
- City sub-property use
- X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
- Land use district
- I-B — Industrial - Business (Industrial)
- Height rank
- #444 of 785 citywide · #2 of 5 in Skyline East
- Footprint to parcel
- 45% of the parcel under LiDAR footprints
- Parcel pieces
- 1 titled piece · roll 024006322
- Coordinates
- 51.102866, -114.044229
The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 5 permits in the City’s Office classes between 2003 and 2015. The building may hold other uses as well. Every building included this way.
Massing and site plan
Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →
How it compares
Roof height against the Skyline East median and tallest, and against the city.
Access
Public-geometry tests only; confirm routes, entrances and hours with the building.
CTrain
Nearest station: Whitehorn, 4.8 km straight-line (route 202).
Plus 15
Outside the Plus 15 network area.
Cycling
No mapped bikeway lies within 400 m of the parcel.
Winter access
The parcel fronts a Priority 2 snow and ice clearing route, 9 m from its edge. Priority 2 routes are cleared after the Priority 1 network.
Accessible crossing
No accessible pedestrian signal lies within 400 m of the parcel.
Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.
Transit service
Scheduled Calgary Transit service at the door, not only the distance to a platform.
No scheduled Calgary Transit stop lies within 450 m of this parcel on the service day in the City's published schedule.
Parking
What the City’s own tariff record says about kerbside parking beside this parcel.
No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.
Assessment history
Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.
Roll 024006322 · X034
Series not charted. The City’s published values for this roll number change by more than half or double between years, which usually signals a re-numbered, split or partially assessed account rather than a market movement. The published figures are listed below without a trend claim.
Published values by roll year
| Roll year | Assessed value | Change |
|---|---|---|
| 2005 | $2.3M | — |
| 2006 | $2.5M | 7.0% |
| 2007 | $3.7M | 49.6% |
| 2008 | $9.5M | 159.2% |
| 2009 | $3.0M | -68.4% |
| 2010 | $5.2M | 73.8% |
| 2011 | $5.4M | 3.3% |
| 2012 | $5.4M | -0.7% |
| 2013 | $6.1M | 13.1% |
| 2014 | $10.3M | 70.6% |
| 2015 | $12.5M | 20.9% |
| 2016 | $11.6M | -6.9% |
| 2017 | $12.2M | 4.6% |
| 2018 | $8.8M | -27.5% |
| 2019 | $6.9M | -21.8% |
| 2020 | $9.2M | 33.5% |
| 2021 | $7.8M | -15.2% |
| 2022 | $6.4M | -18.4% |
| 2023 | $5.3M | -16.8% |
| 2024 | $5.4M | 1.3% |
| 2025 | $5.4M | 0.6% |
| 2026 | $6.9M | 27.8% |
Development and building permits
Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.
Recent development permits 3 since 2012
| Applied | Permit | Category · description | Status |
|---|---|---|---|
| 2014-12-18 | DP2014-6048 | Change of Use - Permitted Use CHANGE OF USE: OFFICE | Released Approval |
| 2014-01-20 | DP2014-0201 | Change of Use - Discretionary Use or Relaxations Required CHANGE OF USE: COUNSELLING SERVICE, OFFICE - RELAXATION OF REQUIRED PARKING STALLS | Released Approval |
| 2013-11-08 | DP2013-4665 | Change of Use - With Change to Site Plan EXTERIOR RENOVATIONS: POST-SECONDARY LEARNING INSTITUTION (SIDING, WINDOWS, DOORS, STAIRS, RAMP); CHANGE OF USE: POST-SECONDARY LEARNING INSTITUTION | Released Approval |
Recent building permits 11 since 2012 · 4 in the City’s office class
| Applied | Permit | Class · work | Est. cost | Status |
|---|---|---|---|---|
| 2026-02-18 | BP2026-02479 | 2199 - Indust/Manufacture Misc. · Alteration Interior alterations | $5,000 | Completed |
| 2026-01-08 | BP2026-00295 | 5299 - Medical Misc. · Alteration Elevated Abilities | — | Cancelled |
| 2025-12-03 | BP2025-23162 | 4002 - Vacant · Alteration Interior Alteration | $50,000 | Issued Permit |
| 2025-06-10 | BP2025-11076 | 3204 - Warehouse/Office · Alteration Classification Change/Interior Alterations | $112 | Completed |
| 2025-02-13 | BP2025-02628 | 3204 - Warehouse/Office · Alteration | $1 | Refused |
| 2016-06-29 | BP2016-07370 | 5105 - Day-Care · Alteration Interior Alterations | $34,554 | Completed |
| 2015-08-25 | BP2015-11098 | 3402 - Office · Alteration C4i Interior Alteration | $307,000 | Completed |
| 2014-12-18 | BP2014-19218 | 3402 - Office · Alteration Leasehold improvement. | $92,003 | File Closed |
Declared estimated project cost across all 11 non-residential building permits on the parcel since 2012: $2.2M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.
Inspections
What City inspectors recorded against the permits on this parcel.
37 inspection results are published against 7 of the 11 building permits on this parcel, from 2013-11-20 to 2026-04-17. 2 inspections used a life-safety checklist and 3 a barrier-free checklist.
What was inspected
Result of each visit
| Outcome | Inspections |
|---|---|
| Acceptable | 14 |
| Acceptable Add Inspection | 14 |
| Not Acceptable | 9 |
Stage
| Inspection type | Count |
|---|---|
| Progress | 21 |
| Final | 16 |
The 14 most recent inspection results
| Date | Permit | Stage | Checklist | Outcome | Inspector note |
|---|---|---|---|---|---|
| 2026-04-17 | BP2026-02479 | Final | All Directives | Acceptable | No deficiencies noted. No further building inspections required. File Closed. |
| 2025-09-25 | BP2025-11076 | Final | All Directives | Acceptable | No further building inspections required. Permission to occupy granted. |
| 2025-09-04 | BP2025-11076 | Final | All Directives | Not Acceptable | Correct noted deficiencies and recall building inspection. The owner to recall the inspection and on the day of the inspection have the required the required letters ready to email to the building safety codes officer doing the inspection on that day. Please do not email any documentation to the person named at the bot |
| 2025-09-04 | BP2025-11076 | Final | All Documents | Not Acceptable | NBC AE Division C 2.2.2.1. General Information Required (Changes or Revisions to work) An as built plan to be provided for the man door that has been filled in and the overhead door with wall built in front of the overhead door opening. The plan to include location of the two doors, and details of framing and materials |
| 2016-12-21 | BP2015-11098 | Final | — | Acceptable | Close file. |
| 2016-08-19 | BP2016-07370 | Progress | — | Acceptable | Work is complete. Close file. |
| 2016-07-18 | BP2015-11098 | Final | — | Acceptable Add Inspection | I spoke to Tom about the verification letters. The info required is as per " Fire Alarm and Fire Suppression Verification and Test Certificates" Standata 06-BCI-001-R1. Call for final inspection when ready. |
| 2016-07-18 | BP2015-11098 | Final | — | Acceptable Add Inspection | Received FA ad Sprinkler Verifications. Call 311 to arrange for a final walkthrough. |
| 2016-01-28 | BP2015-11098 | Final | BARRIER-FREE BUILDINGS | Not Acceptable | Barrier free washroom is not permitted to be lockable from the outside. |
| 2016-01-28 | BP2015-11098 | Final | DIRECTIVES | Not Acceptable | Correct and RECALL inspection. |
| 2016-01-28 | BP2015-11098 | Final | BARRIER-FREE BUILDINGS | Not Acceptable | 3.8.3.13 showers d) have a bevelled threshold not more than 13 mm higher than the finished floor |
| 2016-01-28 | BP2015-11098 | Final | DOCUMENTS Commercial | Not Acceptable | Fire alarm and sprinkler verification received are not acceptable. Both documents must reference the specific code or NFPA being used. |
| 2016-01-28 | BP2015-11098 | Final | FIRESTOPPING | Not Acceptable | Fire stopping incomplete from underside of washroom in parking garage. |
| 2016-01-27 | BP2015-11098 | Final | DIRECTIVES | Not Acceptable | Correct and RECALL inspection. -uncover fire stopping for inspection. |
An inspection result is a record of one visit, not a verdict on the building. 9 of these 37 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.
The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.
Occupiers and licensed businesses
The public record of who operates on the parcel, labelled by source.
Businesses licensed by the City on this parcel 1 as of 2026-09-24
| Licensed business | Address | Licence type | Status | Licensed since |
|---|---|---|---|---|
| Nanotess | 816 55 Ave NE | Manufacturer | Licensed | 2025 |
Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.
No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.
Nearby office buildings
The six nearest office building sites in the record, by straight-line distance between parcel centroids.
Where this building sits in the record
Every collection this building belongs to, from the same public data shown above.
808 55 Ave NE questions
Answers drawn from the record.
How tall is 808 55 Ave NE?
The main structure on the parcel has a LiDAR roof height of 11.9 m in The City of Calgary’s 3D building data, a storey-equivalent of about 3 at 3.9 m per storey.
When was 808 55 Ave NE built?
The City’s assessment roll records 1983 as the year of construction.
What is the assessed value of 808 55 Ave NE?
The City of Calgary assesses this parcel at $6.9M in total on the 2026 roll, 269th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.
What is 808 55 Ave NE zoned?
The parcel is designated I-B, Industrial - Business, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.
Which CTrain station is closest to 808 55 Ave NE?
Whitehorn Station, 4.8 km in a straight line from the parcel centroid.
Who is in 808 55 Ave NE?
The City of Calgary business licence register lists 1 licensed business at this address or inside the parcel as of 2026-09-24, shown in the occupiers section. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.
Has 808 55 Ave NE been inspected?
The City publishes 37 inspection results against 7 permits here, between 2013-11-20 and 2026-04-17. 2 used a life-safety checklist such as fire separations, firestopping or emergency lighting. 3 used the barrier-free checklist. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.
How good is transit at 808 55 Ave NE?
No scheduled Calgary Transit stop lies within 450 m of this parcel in the City's published schedule.
Can staff cycle or get there in winter at 808 55 Ave NE?
No mapped bikeway lies within 400 m. The parcel fronts a Priority 2 snow and ice clearing route. These are straight-line tests against City layers.
Where can visitors park at 808 55 Ave NE?
No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.
Is office space available at 808 55 Ave NE?
This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.
Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.
Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.