OfficeBuildings.ca / Sunridge · Calgary office building record
Sunridge · Calgary office building record

2850 Sunridge Blvd NE

Office use recorded by City permits (roll code X034) · low-rise office building · built 1997 · 2850 Sunridge Blvd NE

3D render of 2850 Sunridge Blvd NE, a 13.8 m low-rise office building in Sunridge, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 2850 Sunridge Blvd NE highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

2850 Sunridge Blvd NE is a 13.8 m low-rise office building in Sunridge, Calgary, recorded on the City assessment roll as built in 1997. Its main structure is the 382nd tallest office roof of the 775 ranked in this record, and 2nd of 12 in Sunridge. The City assesses the parcel at $8.5M on the 2026 roll, 223rd of 822 sites in the record by assessed value. 102 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 11 building permits and 2 development permits on the parcel, the largest a $5.5M office permit for alteration, applied for in 2018.

LiDAR roof height13.8 m
Storey-equivalent (derived)4
Footprint6,712 m²
Parcel46,521 m²
Year built (roll)1997
Assessed 2026$8.5M
Structures on parcel1
Nearest CTrain959 m
Civic address
2850 Sunridge Blvd NE, Calgary, AB
Community
Sunridge (SUN)
City sub-property use
X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
Land use district
I-B — Industrial - Business (Industrial)
Height rank
#382 of 785 citywide · #2 of 12 in Sunridge
Footprint to parcel
14% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 202920187
Coordinates
51.077863, -113.995088
Why this building is in the record

The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 9 permits in the City’s Office classes between 2004 and 2023, and 1 for medical offices. The building may hold other uses as well. Every building included this way.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

13.8 mN20 mLiDAR roof outlines · City of Calgary · true scale
13.8 m · 6,712 m²
3.2 m structure3.5 m structure6.6 m structure7.5 m structure9.4 m structure22.1 m structure13.8 m · 6,712 m² footprintN50 mFootprints within 260 m · City of Calgary
Context within 260 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Sunridge median and tallest, and against the city.

2850 Sunridge Blvd NE13.8 mSunridge median12.1 mSunridge tallest24.8 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: Rundle, 959 m straight-line (route 202).

Plus 15

Outside the Plus 15 network area.

Cycling

The best-rated cycling facility within 400 m of the parcel is a major street (On-Street Bikeway), 321 m away.

Winter access

The parcel fronts a Priority 2 snow and ice clearing route, 11 m from its edge. Priority 2 routes are cleared after the Priority 1 network.

Accessible crossing

No accessible pedestrian signal lies within 400 m of the parcel.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

102 scheduled transit trips call within 300 m of this parcel on a representative weekday, 14 of them between 07:00 and 09:00, across 1 route and 4 stops. The closest stop is WB Sunridge BV @ 29 ST NE, 95 m away.

Service classTrips on the service day
REGULAR102

Routes: 32 Huntington/Sunridge.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 202920187 · X034

$0$2.8M$5.7M$8.5M$11.3M202220232024202520262022 roll: $9.8M2023 roll: $10.0M2024 roll: $10.5M2025 roll: $8.4M2026 roll: $8.5M$8.5M (2026)
Published values by roll year
Roll yearAssessed valueChange
2022$9.8M—
2023$10.0M1.7%
2024$10.5M5.1%
2025$8.4M-20.4%
2026$8.5M1.9%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

01232012: 0 development permits2012: 0 building permits122013: 0 development permits2013: 1 building permit132014: 0 development permits2014: 1 building permit142015: 0 development permits2015: 0 building permits152016: 0 development permits2016: 0 building permits162017: 0 development permits2017: 0 building permits172018: 1 development permit2018: 3 building permits182019: 0 development permits2019: 1 building permit192020: 1 development permit2020: 0 building permits202021: 0 development permits2021: 2 building permits212022: 0 development permits2022: 0 building permits222023: 0 development permits2023: 2 building permits232024: 0 development permits2024: 0 building permits242025: 0 development permits2025: 1 building permit252026: 0 development permits2026: 0 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 2 since 2012

AppliedPermitCategory · descriptionStatus
2020-12-23DP2020-8312Change of Use - Discretionary Use or Relaxations Required
CHANGE OF USE: MEDICAL CLINIC
Released
Approval
2018-07-31DP2018-3665Signs - Discretionary Use
NEW: SIGN - CLASS B (FASCIA SIGNS - 2), SIGN - CLASS C (FREESTANDING SIGN)
Released
Approval

Recent building permits 11 since 2012 · 7 in the City’s office class

AppliedPermitClass · workEst. costStatus
2025-03-28BP2025-054155301 - Child Care Facility · Alteration
PaceKids Sunridge - Interior alterations
$2.2MCompleted
2023-07-21BP2023-117163403 - Office, Medical · Alteration
Interior alterations
$44,200Completed
2023-05-10BP2023-067315299 - Medical Misc. · Alteration
Maple Respiratory Clinic Tenant Fit-Out
$450,000Completed
2021-02-22BP2021-026355299 - Medical Misc. · Alteration
Interior alterations
$415,000Completed
2021-02-12BP2021-022455299 - Medical Misc. · Alteration
Leasehold improvements
$25,000Completed
2019-03-28BP2019-031443402 - Office · Alteration
Interior alterations
$605,400Completed
2018-11-12BP2018-149323402 - Office · Alteration
Interior Alterations - Leasehold Improvements
$333,600Completed
2018-07-03BP2018-086153402 - Office · Alteration
Interior Alteration - Group D
$5.5MCompleted

Declared estimated project cost across all 11 non-residential building permits on the parcel since 2012: $11.2M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

52 inspection results are published against 10 of the 11 building permits on this parcel, from 2013-06-14 to 2025-08-08. The most recent occupancy inspection was accepted on 2025-08-08. 1 inspection used a life-safety checklist and 1 a barrier-free checklist.

What was inspected

01020Firestopping: 11FirestoppingBarrier-free: 11Barrier-freeDocuments and directives: 2323Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection26
Acceptable17
Not Acceptable5
Acceptable with Conditions4

Stage

Inspection typeCount
Final24
Progress22
Framing4
Occupancy2
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2025-08-08BP2025-05415OccupancyAll Occupancy PermitAcceptableOccupancy Permit Emailed To:
2025-08-08BP2025-05415FinalAll DirectivesAcceptableNo deficiencies noted. No further building inspections are required. Final building inspection completed on this scope of work. All trade permits are completed and no deficiencies to report. Closing BP file and issuing Occupancy Permit
2023-09-05BP2023-11716FinalGeneral Inspection ObservationsAcceptableAlteration Inspection Observations were: Vestibule has all surfaces finished, sprinkler head, exit signage, rated door, fire extinguisher. Firestopping noted at penetrations through P21 assembly. Demising wall (P01) in place, taping noted at vertical joints. Proposed D-to-D occupancies, no rating. Collected paper copie
2023-09-05BP2023-11716FinalField Level Hazard Assessment (FLHA)AcceptableField Level Hazard Assessment: Weather cloudy, smoky and dry. No unsafe conditions identified. PPE worn.
2023-09-05BP2023-11716FinalDirectivesAcceptableNo Infractions Noted - No Further BLDG. Inspections Required
2023-09-01BP2023-11716ProgressDocuments CommercialNot AcceptableRequire Fire Stop Test Design Summary Please do not email any documentation to the person named at the bottom of this notice.
2023-09-01BP2023-11716ProgressGeneral Inspection ObservationsNot AcceptableSpoke to Matt by phone he indicated that all work is completed including drywall come on no framing inspection was performed prior to the drywall being installed.
2023-09-01BP2023-11716ProgressDocuments CommercialNot AcceptableSprinkler Verification Please do not email any documentation to the person named at the bottom of this notice.
2023-09-01BP2023-11716ProgressDirectivesNot AcceptableCall 311 to book an inspection No inspection performed. Before calling the inspection the builder/owner, must have the required documents are available on site for the building safety codes officer doing the inspection on that day. Please do not email any documentation to the building safety codes officer named at the
2021-06-30BP2021-02635Final—AcceptableWork is complete. Don¿t received. Close file.
2021-04-26BP2021-02635FramingDOCUMENTS CommercialAcceptable with ConditionsSprinkler Verification Are required at final inspection
2021-04-26BP2021-02635FramingDIRECTIVESAcceptable with ConditionsContractor to complete items, then may continue Ok to drywall call final next
2021-04-26BP2021-02635FramingDOCUMENTS CommercialAcceptable with ConditionsBuilder to ensure all trade permits are complete at time of occupancy inspection
2021-04-26BP2021-02635FramingDOCUMENTS CommercialAcceptable with ConditionsFire Alarm Verification Are required at final inspection

An inspection result is a record of one visit, not a verdict on the building. 5 of these 52 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 1 as of 2026-09-24

Licensed businessAddressLicence typeStatusLicensed since
Maple Respiratory Group2850 Sunridge Blvd NERetail Dealer - PremisesLicensed2026

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 2827 Sunridge Blvd NE12.3 m · built 1998 · Office use recorded by City permits (roll code X034) · Sunridge · 197 m
  • 59 3131 27 St NE9.8 m · built 2016 · Office Condo · Sunridge · 244 m
  • 201 3151 27 St NE13.7 m · built 2017 · Office Condo · 7 accounts · Sunridge · 260 m
  • 355 3132 26 St NE12.2 m · built 1995 · Office Condo · 6 accounts · Sunridge · 288 m
  • 2583 29 St NE8.1 m · built 1998 · Office use recorded by City permits (roll code X034) · Sunridge · 292 m
  • 2752 Sunridge Way NE12 m · built 2015 · Office use recorded by City permits (roll code X034) · Sunridge · 626 m

Where this building sits in the record

Every collection this building belongs to, from the same public data shown above.

2850 Sunridge Blvd NE questions

Answers drawn from the record.

How tall is 2850 Sunridge Blvd NE?

The main structure on the parcel has a LiDAR roof height of 13.8 m in The City of Calgary’s 3D building data, a storey-equivalent of about 4 at 3.9 m per storey.

When was 2850 Sunridge Blvd NE built?

The City’s assessment roll records 1997 as the year of construction.

What is the assessed value of 2850 Sunridge Blvd NE?

The City of Calgary assesses this parcel at $8.5M in total on the 2026 roll, 223rd of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 2850 Sunridge Blvd NE zoned?

The parcel is designated I-B, Industrial - Business, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 2850 Sunridge Blvd NE?

Rundle Station, 959 m in a straight line from the parcel centroid.

Who is in 2850 Sunridge Blvd NE?

The City of Calgary business licence register lists 1 licensed business at this address or inside the parcel as of 2026-09-24, shown in the occupiers section. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 2850 Sunridge Blvd NE been inspected?

The City publishes 52 inspection results against 10 permits here, between 2013-06-14 and 2025-08-08. 1 used a life-safety checklist such as fire separations, firestopping or emergency lighting. 1 used the barrier-free checklist. The most recent occupancy inspection was accepted on 2025-08-08. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 2850 Sunridge Blvd NE?

102 scheduled transit trips call within 300 m of the parcel on a representative weekday, 14 of them in the morning peak, across 1 route. The closest stop is WB Sunridge BV @ 29 ST NE, 95 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at 2850 Sunridge Blvd NE?

The best-rated cycling facility within 400 m is a major street, 321 m away. The parcel fronts a Priority 2 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at 2850 Sunridge Blvd NE?

No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.

Is office space available at 2850 Sunridge Blvd NE?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.