100 Westhills Way SW
Office use recorded by City permits (roll code X034) · multi-building campus parcel · built 2010 · 100 Westhills Way SW

100 Westhills Way SW is a 13 m multi-building campus parcel in Signal Hill, Calgary, recorded on the City assessment roll as built in 2010. The parcel is a campus of 5 LiDAR-mapped structures across 136,769 m², so it is kept out of the height rankings. The City assesses the parcel at $28.9M on the 2026 roll, 70th of 822 sites in the record by assessed value. 212 scheduled transit trips call within 450 m of the parcel on a weekday. Since 2012 the City has recorded 6 building permits and 6 development permits on the parcel, the largest a $17.2M office permit for new construction, applied for in 2014.
- Civic address
- 100 Westhills Way SW, Calgary, AB
- Community
- Signal Hill (SIG)
- City sub-property use
- X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
- Land use district
- DC — Direct Control (Direct Control)
- Height rank
- —
- Footprint to parcel
- 8% of the parcel under LiDAR footprints
- Parcel pieces
- 1 titled piece · roll 202364196
- Coordinates
- 51.012378, -114.170734
The City assesses this land holding as 1 accounts on one parcel of 136,769 m², carrying 5 separate LiDAR-mapped structures. Figures on this page that sum or take a maximum across the parcel therefore describe the whole holding, not one building, and it is excluded from the height rankings for that reason.
The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 2 permits in the City’s Office classes between 2014 and 2024, 1 of them for new office construction. The building may hold other uses as well. Every building included this way.
Massing and site plan
Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →
How it compares
Roof height against the Signal Hill median and tallest, and against the city.
Access
Public-geometry tests only; confirm routes, entrances and hours with the building.
CTrain
Nearest station: Sirocco, 2.9 km straight-line (route 202).
Plus 15
Outside the Plus 15 network area.
Cycling
The best-rated cycling facility within 400 m of the parcel is a major street (On-Street Bikeway), 294 m away.
Winter access
The parcel fronts a Priority 1 snow and ice clearing route, 21 m from its edge. Priority 1 routes are cleared first after a snowfall.
Accessible crossing
No accessible pedestrian signal lies within 400 m of the parcel.
Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.
Transit service
Scheduled Calgary Transit service at the door, not only the distance to a platform.
212 scheduled transit trips call within 450 m of this parcel on a representative weekday, 24 of them between 07:00 and 09:00, across 4 routes and 2 stops. The closest stop is SB Stewart GR @ S. of Richmond RD SW, 384 m away. Nothing lies within 300 m, so this is measured at 450 m.
| Service class | Trips on the service day |
|---|---|
| REGULAR | 211 |
| SCHOOL | 1 |
Routes: 6 Killarney/26 Av SW · 22 Richmond Rd SW · 93 Coach Hill/Westbrook Station · 789 A E Cross/ Signal Hill.
Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.
Parking
What the City’s own tariff record says about kerbside parking beside this parcel.
No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.
Assessment history
Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.
Roll 202364196 · X034
Series not charted. The City’s published values for this roll number change by more than half or double between years, which usually signals a re-numbered, split or partially assessed account rather than a market movement. The published figures are listed below without a trend claim.
Published values by roll year
| Roll year | Assessed value | Change |
|---|---|---|
| 2017 | $15.6M | — |
| 2018 | $16.3M | 4.0% |
| 2019 | $41.7M | 156.6% |
| 2020 | $22.9M | -45.1% |
| 2021 | $23.1M | 0.9% |
| 2022 | $24.4M | 5.5% |
| 2023 | $23.2M | -5.0% |
| 2024 | $23.0M | -0.6% |
| 2025 | $28.5M | 23.8% |
| 2026 | $28.9M | 1.5% |
Development and building permits
Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.
Recent development permits 6 since 2012
| Applied | Permit | Category · description | Status |
|---|---|---|---|
| 2025-08-15 | DP2025-04745 | Change of Use - With Change to Site Plan CHANGES TO SITE PLAN: MUNICIPAL MAINTENANCE AND SERVICE FACILITY | Pending Release Approval |
| 2025-05-22 | DP2025-03046 | Change of Use - With Change to Site Plan CHANGES TO SITE PLAN: MUNICIPAL MAINTENANCE AND SERVICE FACILITY | Cancelled |
| 2024-04-29 | DP2024-03022 | Change of Use - With Change to Site Plan CHANGES TO SITE PLAN: MUNICIPAL MAINTENANCE AND SERVICE FACILITY | Released Approval |
| 2021-02-26 | DP2021-1254 | Temporary Structure CHANGES TO SITE PLAN: MUNICIPAL MAINTENANCE AND SERVICE FACILITY (STORAGE TANKS); TEMPORARY USE: MUNICIPAL MAINTENANCE AND SERVICE FACILITY (STORAGE BUILDING) | Released Approval |
| 2019-06-11 | DP2019-2996 | Temporary Structure CHANGES TO SITE PLAN: MUNICIPAL MAINTENANCE AND SERVICE FACILITY (STORAGE TANKS) | Released Approval |
| 2016-09-12 | DP2016-3740 | Change of Use - With Change to Site Plan REVISION: OFFICES, SIGNS - CLASS B, SIGNS - CLASS C (REVISIONS TO DP2014-0310) | Released Approval |
Recent building permits 6 since 2012 · 2 in the City’s office class
| Applied | Permit | Class · work | Est. cost | Status |
|---|---|---|---|---|
| 2024-12-12 | BP2024-25735 | 3299 - Storage/Warehouse Misc. · Demolition | — | Completed |
| 2024-11-27 | BP2024-24814 | 2399 - Indust/Utility Misc. · Addition Partial enclosure of an existing lean-to structure. | $180,831 | Completed |
| 2024-11-25 | BP2024-24652 | 2399 - Indust/Utility Misc. · New Construction of a fabric covered steel structure approximately 900 sqquare meters in building area | $918,917 | Completed |
| 2024-09-09 | BP2024-19055 | 3402 - Office · Alteration Interior alterations | $434,000 | Completed |
| 2016-09-01 | BP2016-10330 | 3299 - Storage/Warehouse Misc. · New 2 New Buildings F2 and F3 | $8.5M | Completed |
| 2014-08-29 | BP2014-13650 | 3402 - Office · New New 3 storey office building | $17.2M | Completed |
Declared estimated project cost across all 6 non-residential building permits on the parcel since 2012: $27.2M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.
Inspections
What City inspectors recorded against the permits on this parcel.
20 inspection results are published against 4 of the 6 building permits on this parcel, from 2015-09-14 to 2025-07-03. 2 inspections used a life-safety checklist.
What was inspected
Result of each visit
| Outcome | Inspections |
|---|---|
| Acceptable Add Inspection | 15 |
| Acceptable | 3 |
| Not Acceptable | 2 |
Stage
| Inspection type | Count |
|---|---|
| Progress | 16 |
| Final | 4 |
The 14 most recent inspection results
| Date | Permit | Stage | Checklist | Outcome | Inspector note |
|---|---|---|---|---|---|
| 2025-07-03 | BP2024-24652 | Final | All Directives | Acceptable | No deficiencies noted. No further building inspections are required. |
| 2025-06-25 | BP2024-24652 | Final | All Documents | Not Acceptable | NBC AE Division C 2.4.2. Schedules of Professional Involvement - Structural C-2 schedule submitted. The following are still required: C1 from coordinating registered professional C2s for architecture, mechanical, electrical, and geotechnical scopes of work The remaining five schedules can be submitted by uploading them |
| 2025-06-25 | BP2024-24652 | Final | All Directives | Not Acceptable | Inspections can be booked at inspections.calgary.ca - No further on-site inspections are required. Submit or uploaded schedules and schedule inspection to allow for documents to be processed and occupancy to be granted. |
| 2025-05-02 | BP2024-24814 | Progress | All Directives | Acceptable | No deficiencies noted. No further building inspections are required. |
| 2025-03-21 | BP2024-19055 | Final | All Directives | Acceptable | No deficiencies noted. No further building inspections are required. |
| 2017-07-12 | BP2014-13650 | Progress | DIRECTIVES | Acceptable Add Inspection | Contractor to complete items, then may continue |
| 2017-07-12 | BP2014-13650 | Progress | FIRE RESISTANCE & FIRE SEPARATIONS PT 3 | Acceptable Add Inspection | 3.1.9 Service penetration, seal by firestop system , in progress. |
| 2017-07-12 | BP2014-13650 | Progress | DOCUMENTS Commercial | Acceptable Add Inspection | Occupancy Application |
| 2017-07-12 | BP2014-13650 | Progress | DOCUMENTS Commercial | Acceptable Add Inspection | Sprinkler Verification |
| 2017-07-12 | BP2014-13650 | Progress | DOCUMENTS Commercial | Acceptable Add Inspection | Pile Verification including screw piles. |
| 2017-07-12 | BP2014-13650 | Progress | DOCUMENTS Commercial | Acceptable Add Inspection | C1 and/or C2 letters required |
| 2017-07-12 | BP2014-13650 | Progress | FIRE RESISTANCE & FIRE SEPARATIONS PT 3 | Acceptable Add Inspection | Fire separations in progress. |
| 2017-07-12 | BP2014-13650 | Progress | DOCUMENTS Commercial | Acceptable Add Inspection | Fire Alarm Monitor |
| 2017-07-12 | BP2014-13650 | Progress | DOCUMENTS Commercial | Acceptable Add Inspection | Fire Alarm Verification |
An inspection result is a record of one visit, not a verdict on the building. 2 of these 20 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.
The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.
Occupiers and licensed businesses
The public record of who operates on the parcel, labelled by source.
Businesses licensed by the City on this parcel 0 as of 2026-09-24
No City of Calgary business licence is recorded at this address or inside this parcel.
Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.
No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.
Nearby office buildings
The six nearest office building sites in the record, by straight-line distance between parcel centroids.
Where this building sits in the record
Every collection this building belongs to, from the same public data shown above.
100 Westhills Way SW questions
Answers drawn from the record.
How tall is 100 Westhills Way SW?
The main structure on the parcel has a LiDAR roof height of 13 m in The City of Calgary’s 3D building data, a storey-equivalent of about 3 at 3.9 m per storey.
When was 100 Westhills Way SW built?
The City’s assessment roll records 2010 as the year of construction.
What is the assessed value of 100 Westhills Way SW?
The City of Calgary assesses this parcel at $28.9M in total on the 2026 roll, 70th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.
What is 100 Westhills Way SW zoned?
The parcel is designated DC, Direct Control, under the City of Calgary Land Use Bylaw. Under Direct Control the permitted uses are set by the site’s own bylaw rather than by a standard district. Confirm the designation and any amendments with the City before relying on it.
Which CTrain station is closest to 100 Westhills Way SW?
Sirocco Station, 2.9 km in a straight line from the parcel centroid.
Who is in 100 Westhills Way SW?
No City of Calgary business licence is recorded at this address or inside the parcel. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.
Has 100 Westhills Way SW been inspected?
The City publishes 20 inspection results against 4 permits here, between 2015-09-14 and 2025-07-03. 2 used a life-safety checklist such as fire separations, firestopping or emergency lighting. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.
How good is transit at 100 Westhills Way SW?
212 scheduled transit trips call within 450 m of the parcel on a representative weekday, 24 of them in the morning peak, across 4 routes. The closest stop is SB Stewart GR @ S. of Richmond RD SW, 384 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.
Can staff cycle or get there in winter at 100 Westhills Way SW?
The best-rated cycling facility within 400 m is a major street, 294 m away. The parcel fronts a Priority 1 snow and ice clearing route. These are straight-line tests against City layers.
Where can visitors park at 100 Westhills Way SW?
No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.
Is office space available at 100 Westhills Way SW?
This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.
Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.
Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.