50 Quarry Park Blvd SE
Office use recorded by City permits (roll code X034) · mid-rise office building · built 2014 · 50 Quarry Park Blvd SE

50 Quarry Park Blvd SE is a 30.5 m mid-rise office building in Douglasdale/Glen, Calgary, recorded on the City assessment roll as built in 2014. Its main structure is the 151st tallest office roof of the 775 ranked in this record, and 2nd of 11 in Douglasdale/Glen. The City assesses the parcel at $46.5M on the 2026 roll, 43rd of 822 sites in the record by assessed value. 125 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 36 building permits and 7 development permits on the parcel, the largest a $22.2M office permit for new construction, applied for in 2013.
- Civic address
- 50 Quarry Park Blvd SE, Calgary, AB
- Community
- Douglasdale/Glen (DDG)
- City sub-property use
- X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
- Land use district
- I-B — Industrial - Business (Industrial)
- Height rank
- #151 of 785 citywide · #2 of 11 in Douglasdale/Glen
- Footprint to parcel
- 19% of the parcel under LiDAR footprints
- Parcel pieces
- 1 titled piece · roll 201376316
- Coordinates
- 50.964294, -114.003606
The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 35 permits in the City’s Office classes between 2012 and 2026, 2 of them for new office construction, and 2 for medical offices. The building may hold other uses as well. Every building included this way.
Massing and site plan
Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →
How it compares
Roof height against the Douglasdale/Glen median and tallest, and against the city.
Access
Public-geometry tests only; confirm routes, entrances and hours with the building.
CTrain
Nearest station: Anderson, 5.1 km straight-line (route 201). Planned Green Line station Quarry Park is 233 m away (SE Segment, per the City’s Green Line map).
Plus 15
Outside the Plus 15 network area.
Cycling
No mapped bikeway lies within 400 m of the parcel.
Winter access
The parcel fronts a Priority 1 snow and ice clearing route, 9 m from its edge. Priority 1 routes are cleared first after a snowfall.
Accessible crossing
No accessible pedestrian signal lies within 400 m of the parcel.
Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.
Transit service
Scheduled Calgary Transit service at the door, not only the distance to a platform.
125 scheduled transit trips call within 300 m of this parcel on a representative weekday, 19 of them between 07:00 and 09:00, across 4 routes and 5 stops. The closest stop is NB 24 ST SE @ Quarry Park BV, 152 m away.
| Service class | Trips on the service day |
|---|---|
| BRT | 111 |
| EXPRESS | 14 |
Routes: 117 McKenzie Towne Express · 131 East Bow Express · 151 New Brighton Express · 302 BRT Southeast/City Centre.
Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.
Parking
What the City’s own tariff record says about kerbside parking beside this parcel.
No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.
Assessment history
Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.
Roll 201376316 · X034
Series not charted. The City’s published values for this roll number change by more than half or double between years, which usually signals a re-numbered, split or partially assessed account rather than a market movement. The published figures are listed below without a trend claim.
Published values by roll year
| Roll year | Assessed value | Change |
|---|---|---|
| 2009 | $3.1M | — |
| 2010 | $3.4M | 7.0% |
| 2011 | $3.3M | -1.8% |
| 2012 | $3.1M | -4.8% |
| 2013 | $3.3M | 5.1% |
| 2014 | $18.3M | 453.9% |
| 2015 | $32.2M | 76.3% |
| 2016 | $133.2M | 313.3% |
| 2017 | $124.8M | -6.3% |
| 2018 | $90.9M | -27.1% |
| 2019 | $541,500 | -99.4% |
| 2020 | $221,500 | -59.1% |
| 2021 | $58.0M | 26085.1% |
| 2022 | $53.8M | -7.3% |
| 2023 | $42.5M | -20.9% |
| 2024 | $44.4M | 4.4% |
| 2025 | $687,500 | -98.5% |
| 2026 | $46.5M | 6663.6% |
Development and building permits
Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.
Recent development permits 7 since 2012
| Applied | Permit | Category · description | Status |
|---|---|---|---|
| 2023-06-15 | DP2023-03996 | Signs - Discretionary Use NEW: SIGN - CLASS B (FASCIA SIGNS) - ILLUMINATION | Released Approval |
| 2022-08-22 | DP2022-05892 | Signs - Permitted Use NEW: SIGN - CLASS B (FASCIA SIGN) | Released Approval |
| 2022-05-09 | DP2022-03185 | Signs - Permitted Use NEW: SIGN - CLASS B (FASCIA SIGN) | Released Approval |
| 2021-11-29 | DP2021-8520 | Signs - Permitted Use NEW: SIGN - CLASS B (FASCIA SIGNS - 2) | Released Approval |
| 2015-06-18 | DP2015-2572 | Signs - Permitted Use NEW: SIGN - CLASS B (FASCIA SIGNS - 2) | Released Approval |
| 2014-11-26 | DP2014-5668 | Change of Use - With Change to Site Plan REVISION: CHANGES TO SITE PLAN: OFFICE (PARKING, LANDSCAPE, PARKADE), NEW: SIGN - CLASS C: FREESTANDING SIGNS (2) | Released Approval |
| 2012-03-23 | DP2012-1123 | Commercial - Other Areas NEW: OFFICE (2 BUILDINGS), SIGN - CLASS C: FREESTANDING SIGNS (4) | Released Approval |
Recent building permits 36 since 2012 · 35 in the City’s office class
| Applied | Permit | Class · work | Est. cost | Status |
|---|---|---|---|---|
| 2026-07-15 | BP2026-13253 | 3402 - Office · Alteration Interior alterations | $800,000 | Issued Permit |
| 2026-07-07 | BP2026-12563 | 3402 - Office · Alteration Interior Alteration- Church of Jesus Christ of Latter-Day Saints | $91,000 | Completed |
| 2026-04-08 | BP2026-05448 | 3402 - Office · Alteration Interior Alterations | $392,000 | Completed |
| 2026-01-12 | BP2026-00407 | 3402 - Office · Alteration Interior Alterations | $228,000 | Completed |
| 2025-12-19 | BP2025-23958 | 3402 - Office · Alteration Interior Alterations | $259,400 | Completed |
| 2025-12-03 | BP2025-23101 | 5299 - Medical Misc. · Alteration Interior alterations - Resprite | $205,000 | Completed |
| 2025-07-25 | BP2025-14539 | 3403 - Office, Medical · Alteration Interior Alteration - Medical Office | $367,000 | Completed |
| 2025-07-23 | BP2025-14313 | 3402 - Office · Alteration Interior Alterations | $2.0M | Completed |
Declared estimated project cost across all 36 non-residential building permits on the parcel since 2012: $61.8M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.
Inspections
What City inspectors recorded against the permits on this parcel.
178 inspection results are published against 31 of the 36 building permits on this parcel, from 2013-04-05 to 2026-08-27. The most recent occupancy inspection was accepted on 2026-04-15. 17 inspections used a life-safety checklist.
What was inspected
Result of each visit
| Outcome | Inspections |
|---|---|
| Acceptable Add Inspection | 119 |
| Acceptable | 37 |
| Acceptable with Conditions | 14 |
| Not Acceptable | 8 |
Stage
| Inspection type | Count |
|---|---|
| Progress | 115 |
| Occupancy | 23 |
| Framing | 22 |
| Final | 18 |
The 14 most recent inspection results
| Date | Permit | Stage | Checklist | Outcome | Inspector note |
|---|---|---|---|---|---|
| 2026-08-27 | BP2026-12563 | Final | All Directives | Acceptable with Conditions | Correct noted deficiencies. No further building inspections are required. |
| 2026-08-12 | BP2026-12563 | Progress | NBC AE 3.3. Safety within Floor Areas | Acceptable with Conditions | NBC AE Division B 3.3.1.20. Transparent Doors and Panels |
| 2026-08-12 | BP2026-12563 | Progress | All Documents | Acceptable with Conditions | NBC AE Division C 2.4.2. Schedules of Professional Involvement C Schedules Required (NBC 2023 AE): Provide C Schedules from the Coordinating Professional and the registered professionals of record, Mechanical. Electrical and provide a copy to the field inspector prior to occupancy or delays/re-inspection fees may occur |
| 2026-08-12 | BP2026-12563 | Progress | All Documents | Acceptable with Conditions | NBC AE Division C 2.4.1.3. Fire Suppression System Designs (Sprinkler VI) |
| 2026-08-12 | BP2026-12563 | Progress | All Directives | Acceptable with Conditions | Customer is advised to book a final inspection prior to occupancy. |
| 2026-07-30 | BP2026-05448 | Progress | NBC AE 3.3. Safety within Floor Areas | Acceptable with Conditions | NBC AE Division B 3.3.1.20. Transparent Doors and Panels 2) The visibility of fully glazed transparent doors, sidelights and panels shall be enhanced through the inclusion of mullions, markings or other elements that a) are visually contrasting, b) are at least 50 mm high, c) extend the full width of the door, sideligh |
| 2026-07-30 | BP2026-05448 | Progress | All Directives | Acceptable with Conditions | Correct noted deficiencies. No further building inspections are required. |
| 2026-04-15 | BP2026-00407 | Final | All Directives | Acceptable | — |
| 2026-04-15 | BP2026-00407 | Occupancy | All Directives | Acceptable | - Occupancy granted. |
| 2026-02-17 | BP2025-23101 | Final | All Directives | Acceptable | No deficiencies noted. No further building inspections required. File Closed. |
| 2026-02-12 | BP2025-23101 | Progress | All Directives | Acceptable with Conditions | Electrical compliance is required prior to occupancy. - EP2025-37496 permit is in issued status and requires final complete and complete |
| 2026-02-12 | BP2025-23101 | Progress | All Directives | Acceptable with Conditions | Correct noted deficiencies and recall building inspection. - Call for final inspection when EP2025-37496 is complete |
| 2026-02-12 | BP2025-23101 | Progress | All Directives | Acceptable with Conditions | No deficiencies noted. No further building inspections are required. - Inspection is conducted. No further inspection required pending EP2025-37496 final to close file |
| 2026-02-06 | BP2025-14313 | Final | All Directives | Not Acceptable | Correct noted deficiencies and recall building inspection. |
An inspection result is a record of one visit, not a verdict on the building. 8 of these 178 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.
The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.
Occupiers and licensed businesses
The public record of who operates on the parcel, labelled by source.
Businesses licensed by the City on this parcel 4 as of 2026-09-24
| Licensed business | Address | Licence type | Status | Licensed since |
|---|---|---|---|---|
| Aecon Water Infrastructure | 28 Quarry Park Blvd SE | Contractor (No Provincial Licence Required) | Licensed | 2023 |
| Aveva Software Canada | 28 Quarry Park Blvd SE | Wholesaler | Renewal pending | 2023 |
| Dyno Nobel Canada | 28 Quarry Park Blvd SE | Wholesaler | Licensed | 2020 |
| Lockerbie & Hole Contracting | 28 Quarry Park Blvd SE | Contractor (No Provincial Licence Required) | Licensed | 2023 |
Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.
No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.
Nearby office buildings
The six nearest office building sites in the record, by straight-line distance between parcel centroids.
Where this building sits in the record
Every collection this building belongs to, from the same public data shown above.
50 Quarry Park Blvd SE questions
Answers drawn from the record.
How tall is 50 Quarry Park Blvd SE?
The main structure on the parcel has a LiDAR roof height of 30.5 m in The City of Calgary’s 3D building data, a storey-equivalent of about 8 at 3.9 m per storey.
When was 50 Quarry Park Blvd SE built?
The City’s assessment roll records 2014 as the year of construction.
What is the assessed value of 50 Quarry Park Blvd SE?
The City of Calgary assesses this parcel at $46.5M in total on the 2026 roll, 43rd of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.
What is 50 Quarry Park Blvd SE zoned?
The parcel is designated I-B, Industrial - Business, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.
Which CTrain station is closest to 50 Quarry Park Blvd SE?
Anderson Station, 5.1 km in a straight line from the parcel centroid.
Who is in 50 Quarry Park Blvd SE?
The City of Calgary business licence register lists 4 licensed businesses at this address or inside the parcel as of 2026-09-24, shown in the occupiers section. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.
Has 50 Quarry Park Blvd SE been inspected?
The City publishes 178 inspection results against 31 permits here, between 2013-04-05 and 2026-08-27. 17 used a life-safety checklist such as fire separations, firestopping or emergency lighting. The most recent occupancy inspection was accepted on 2026-04-15. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.
How good is transit at 50 Quarry Park Blvd SE?
125 scheduled transit trips call within 300 m of the parcel on a representative weekday, 19 of them in the morning peak, across 4 routes. The closest stop is NB 24 ST SE @ Quarry Park BV, 152 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.
Can staff cycle or get there in winter at 50 Quarry Park Blvd SE?
No mapped bikeway lies within 400 m. The parcel fronts a Priority 1 snow and ice clearing route. These are straight-line tests against City layers.
Where can visitors park at 50 Quarry Park Blvd SE?
No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.
Is office space available at 50 Quarry Park Blvd SE?
This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.
Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.
Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.