COMMERCIALLY.caOfficeBuildings.ca
OfficeBuildings.ca / Manchester Industrial · Calgary office building record
Manchester Industrial · Calgary office building record

480 36 Ave SE

Office use recorded by City permits (roll code X034) · low-rise office building · built 1978 · 480 36 Ave SE

3D render of 480 36 Ave SE, a 6.6 m low-rise office building in Manchester Industrial, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 480 36 Ave SE highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

480 36 Ave SE is a 6.6 m low-rise office building in Manchester Industrial, Calgary, recorded on the City assessment roll as built in 1978. Its main structure is the 695th tallest office roof of the 775 ranked in this record, and 23rd of 40 in Manchester Industrial. The City assesses the parcel at $5.8M on the 2026 roll, 320th of 822 sites in the record by assessed value. The nearest CTrain platform is 39 Avenue, 778 m away in a straight line. Since 2012 the City has recorded 3 building permits and 2 development permits on the parcel, the largest a $3.5M office permit for alteration, applied for in 2012.

LiDAR roof height6.6 m
Storey-equivalent (derived)2
Footprint4,391 m²
Parcel8,808 m²
Year built (roll)1978
Assessed 2026$5.8M
Structures on parcel2
Nearest CTrain778 m
Civic address
480 36 Ave SE, Calgary, AB
Community
Manchester Industrial (MNI)
City sub-property use
X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
Land use district
I-G — Industrial - General (Industrial)
Height rank
#695 of 785 citywide · #23 of 39 in Manchester Industrial
Footprint to parcel
50% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 090040908
Coordinates
51.022058, -114.052854
Why this building is in the record

The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 4 permits in the City’s Office classes between 2004 and 2016. The building may hold other uses as well. Every building included this way.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

6.6 mN20 mLiDAR roof outlines · City of Calgary · true scale
6.6 m · 3,212 m² · 5.4 m · 1,179 m²
3 m structure5.6 m structure5.8 m structure6.3 m structure6.5 m structure6.8 m structure6.9 m structure7.5 m structure7.7 m structure7.8 m structure8.3 m structure8.4 m structure8.6 m structure10.2 m structure5.4 m · 1,179 m² footprint6.6 m · 3,212 m² footprintN50 mFootprints within 193 m · City of Calgary
Context within 193 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Manchester Industrial median and tallest, and against the city.

480 36 Ave SE6.6 mManchester Industrial median7.1 mManchester Industrial tallest45.2 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: 39 Avenue, 778 m straight-line (route 201).

Plus 15

Outside the Plus 15 network area.

Cycling

No mapped bikeway lies within 400 m of the parcel.

Winter access

No Priority 1 or 2 snow and ice clearing route lies within 30 m of the parcel edge.

Accessible crossing

No accessible pedestrian signal lies within 400 m of the parcel.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

No scheduled Calgary Transit stop lies within 450 m of this parcel on the service day in the City's published schedule.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 090040908 · X034

$0$3.4M$6.9M$10.3M$13.7M200520082011201420172020202320262005 roll: $2.5M2006 roll: $2.8M2007 roll: $3.9M2008 roll: $6.5M2009 roll: $7.1M2010 roll: $5.6M2011 roll: $3.8M2012 roll: $5.5M2013 roll: $7.9M2014 roll: $10.7M2015 roll: $12.7M2016 roll: $9.7M2017 roll: $7.5M2018 roll: $8.3M2019 roll: $5.3M2020 roll: $5.5M2021 roll: $6.5M2022 roll: $4.8M2023 roll: $5.2M2024 roll: $5.2M2025 roll: $5.5M2026 roll: $5.8M$5.8M (2026)
Published values by roll year
Roll yearAssessed valueChange
2005$2.5M—
2006$2.8M11.7%
2007$3.9M39.5%
2008$6.5M68.3%
2009$7.1M9.6%
2010$5.6M-21.0%
2011$3.8M-32.1%
2012$5.5M44.9%
2013$7.9M43.8%
2014$10.7M34.5%
2015$12.7M18.8%
2016$9.7M-24.0%
2017$7.5M-22.3%
2018$8.3M10.1%
2019$5.3M-36.3%
2020$5.5M4.0%
2021$6.5M19.6%
2022$4.8M-27.2%
2023$5.2M8.6%
2024$5.2M1.0%
2025$5.5M5.0%
2026$5.8M5.5%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

00.512012: 0 development permits2012: 1 building permit122013: 1 development permit2013: 0 building permits132014: 1 development permit2014: 1 building permit142015: 0 development permits2015: 0 building permits152016: 0 development permits2016: 1 building permit162017: 0 development permits2017: 0 building permits172018: 0 development permits2018: 0 building permits182019: 0 development permits2019: 0 building permits192020: 0 development permits2020: 0 building permits202021: 0 development permits2021: 0 building permits212022: 0 development permits2022: 0 building permits222023: 0 development permits2023: 0 building permits232024: 0 development permits2024: 0 building permits242025: 0 development permits2025: 0 building permits252026: 0 development permits2026: 0 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 2 since 2012

AppliedPermitCategory · descriptionStatus
2014-03-10DP2014-1016Industrial - Other Areas
NEW: GENERAL INDUSTRIAL - LIGHT (ACCESSORY BUILDING)
Released
Approval
2013-04-18DP2013-1618Change of Use - With Change to Site Plan
NEW: GENERAL INDUSTRIAL - LIGHT (ACCESSORY BUILDING)
Released
Approval

Recent building permits 3 since 2012 · 2 in the City’s office class

AppliedPermitClass · workEst. costStatus
2016-07-21BP2016-084033402 - Office · Alteration
Exterior Alteration - Group D - Dartmouth Place
$300,000Completed
2014-10-24BP2014-167643299 - Storage/Warehouse Misc. · New
New storage and garbage/recycling building
$30,000Completed
2012-09-26BP2012-135193402 - Office · Alteration
Interior Alteration
$3.5MCompleted

Declared estimated project cost across all 3 non-residential building permits on the parcel since 2012: $3.8M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

31 inspection results are published against 2 of the 3 building permits on this parcel, from 2012-12-17 to 2017-01-27. The most recent occupancy inspection was accepted on 2017-01-27. 3 inspections used a life-safety checklist and 3 a barrier-free checklist.

What was inspected

01020Fire separations and fire resistance: 11Fireseparations and fire resistanceEmergency lighting and exit signs: 11Emergencylighting and exit signsBarrier-free: 33Barrier-freeDocuments and directives: 2424Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection12
Acceptable with Conditions10
Not Acceptable8
Acceptable1

Stage

Inspection typeCount
Progress10
Framing10
Occupancy9
Final2
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2017-01-27BP2016-08403OccupancyDIRECTIVESAcceptable Add InspectionTalked to builder. They will get required documents and call for final inspection.
2016-12-30BP2016-08403OccupancyDIRECTIVESNot AcceptableNon called inspection. Please call for final inspection.
2016-11-22BP2016-08403ProgressDIRECTIVESAcceptableNon called progress inspection. Appears all material is in place. When required documents are in place, call for final inspection.
2016-10-25BP2016-08403ProgressDIRECTIVESAcceptable Add InspectionContractor waiting for door front sections with doors.
2016-09-27BP2016-08403ProgressDIRECTIVESAcceptable Add InspectionProgress inspection, 80% complete.
2016-08-30BP2016-08403ProgressDIRECTIVESAcceptable Add InspectionWork has started.
2016-08-30BP2016-08403ProgressDOCUMENTS CommercialAcceptable Add InspectionC1 and/or C2 letters required as per permit conditions for final inspection.
2013-07-18BP2012-13519FinalDOCUMENTS CommercialNot AcceptableC1 and/or C2 letters required
2013-07-18BP2012-13519FinalDIRECTIVESNot AcceptableFile complete upon receipt of documents recall for documents only
2013-05-27BP2012-13519OccupancyDIRECTIVESAcceptable Add InspectionContractor to complete items, then may continue phase 2 and 3 occupancy completed, call for final phase next
2013-05-16BP2012-13519OccupancyDIRECTIVESNot AcceptableCorrect items and RECALL inspection - exterior pre occupancy inspection with dave gallant
2013-05-16BP2012-13519OccupancyEMERGENCY LIGHTING & EXIT SIGNSNot AcceptableExit signage required
2013-05-09BP2012-13519OccupancyBARRIER-FREE BUILDINGSNot Acceptable3.8.3.8 BFree washroom coat hook not more than 1200mm high
2013-05-09BP2012-13519OccupancyBARRIER-FREE BUILDINGSNot Acceptable3.8.3.1 Barrier Free signage required on door

An inspection result is a record of one visit, not a verdict on the building. 8 of these 31 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 0 as of 2026-09-24

No City of Calgary business licence is recorded at this address or inside this parcel.

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 3600 4 St SE10.5 m · built 2011 · Small Office · Manchester Industrial · 296 m
  • 3604 Burnsland Rd SE5.5 m · built 1966 · Small Office · Manchester Industrial · 333 m
  • 311 34 Ave SE4.6 m · built 1960 · Small Office · 2 accounts · Manchester Industrial · 403 m
  • 200 4000 4 St SE9 m · built 2008 · Office use recorded by City permits (roll code X034) · Manchester Industrial · 409 m
  • 400 4000 4 St SE6.3 m · built 2011 · Office use recorded by City permits (roll code X034) · Manchester Industrial · 482 m
  • 4015 7 St SE8.7 m · built 1959 · Office use recorded by City permits (roll code X034) · Highfield · 517 m

480 36 Ave SE questions

Answers drawn from the record.

How tall is 480 36 Ave SE?

The main structure on the parcel has a LiDAR roof height of 6.6 m in The City of Calgary’s 3D building data, a storey-equivalent of about 2 at 3.9 m per storey.

When was 480 36 Ave SE built?

The City’s assessment roll records 1978 as the year of construction.

What is the assessed value of 480 36 Ave SE?

The City of Calgary assesses this parcel at $5.8M in total on the 2026 roll, 320th of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 480 36 Ave SE zoned?

The parcel is designated I-G, Industrial - General, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 480 36 Ave SE?

39 Avenue Station, 778 m in a straight line from the parcel centroid.

Who is in 480 36 Ave SE?

No City of Calgary business licence is recorded at this address or inside the parcel. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 480 36 Ave SE been inspected?

The City publishes 31 inspection results against 2 permits here, between 2012-12-17 and 2017-01-27. 3 used a life-safety checklist such as fire separations, firestopping or emergency lighting. 3 used the barrier-free checklist. The most recent occupancy inspection was accepted on 2017-01-27. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 480 36 Ave SE?

No scheduled Calgary Transit stop lies within 450 m of this parcel in the City's published schedule.

Can staff cycle or get there in winter at 480 36 Ave SE?

No mapped bikeway lies within 400 m. No Priority 1 or 2 clearing route lies within 30 m of the parcel edge. These are straight-line tests against City layers.

Where can visitors park at 480 36 Ave SE?

No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.

Is office space available at 480 36 Ave SE?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.