2213 50 Ave SE

Office use recorded by City permits (roll code X034) · mid-rise office building · built 2015 · 2213 50 Ave SE

3D render of 2213 50 Ave SE, a 15.2 m mid-rise office building in Valleyfield, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 2213 50 Ave SE highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

2213 50 Ave SE is a 15.2 m mid-rise office building in Valleyfield, Calgary, recorded on the City assessment roll as built in 2015. Its main structure is the 353rd tallest office roof of the 775 ranked in this record, and the tallest in Valleyfield. The City assesses the parcel at $5.4M on the 2026 roll, 341st of 822 sites in the record by assessed value. 143 scheduled transit trips call within 300 m of the parcel on a weekday. Since 2012 the City has recorded 4 building permits and 2 development permits on the parcel, the largest an $8.9M office permit for new construction, applied for in 2015.

LiDAR roof height15.2 m
Storey-equivalent (derived)4
Footprint1,535 m²
Parcel8,552 m²
Year built (roll)2015
Assessed 2026$5.4M
Structures on parcel2
Nearest CTrain3.9 km
Civic address
2213 50 Ave SE, Calgary, AB
Community
Valleyfield (VAF)
City sub-property use
X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
Land use district
I-B,I-G
Height rank
#353 of 785 citywide · #1 of 2 in Valleyfield
Footprint to parcel
18% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 201571213
Coordinates
51.008157, -114.007392
Why this building is in the record

The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 1 permit in the City’s Office classes between 2015 and 2015, 1 of them for new office construction. The building may hold other uses as well. Every building included this way.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

15.2 mN20 mLiDAR roof outlines · City of Calgary · true scale
15.2 m · 1,511 m² · 4.8 m · 24 m²
4.8 m · 24 m² footprint15.2 m · 1,511 m² footprintN50 mFootprints within 192 m · City of Calgary
Context within 192 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Valleyfield median and tallest, and against the city.

2213 50 Ave SE15.2 mValleyfield median11.649999999999999 mValleyfield tallest15.2 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: 39 Avenue, 3.9 km straight-line (route 201). Planned Green Line station Lynnwood / Millican is 1.0 km away (SE Segment, per the City’s Green Line map).

Plus 15

Outside the Plus 15 network area.

Cycling

No mapped bikeway lies within 400 m of the parcel.

Winter access

The parcel fronts a Priority 1 snow and ice clearing route, 24 m from its edge. Priority 1 routes are cleared first after a snowfall.

Accessible crossing

No accessible pedestrian signal lies within 400 m of the parcel.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

143 scheduled transit trips call within 300 m of this parcel on a representative weekday, 20 of them between 07:00 and 09:00, across 3 routes and 4 stops. The closest stop is WB 50 AV SE @ 23 ST SE far-side, 192 m away.

Service classTrips on the service day
REGULAR87
BRT56

Routes: 24 Ogden · 147 Starfield Industrial · 302 BRT Southeast/City Centre.

Calgary Transit Scheduling Data (GTFS), service day 2026-09-28 inside the 2026-09-15 to 2026-12-20 service period. A trip is counted once however many stops it calls at inside the radius. Schedules change each service period; this is the schedule, not observed service.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 201571213 · X034

Series not charted. The City’s published values for this roll number change by more than half or double between years, which usually signals a re-numbered, split or partially assessed account rather than a market movement. The published figures are listed below without a trend claim.

Published values by roll year
Roll yearAssessed valueChange
2011$1.1M—
2012$1.3M13.6%
2013$1.2M-0.8%
2014$1.4M10.5%
2015$1.5M9.5%
2016$4.1M175.3%
2017$10.6M157.1%
2018$11.8M10.6%
2019$7.7M-34.1%
2020$8.8M14.2%
2021$7.3M-17.1%
2022$7.0M-4.6%
2023$5.3M-23.6%
2024$5.4M0.7%
2025$5.6M4.1%
2026$5.4M-3.0%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

00.512012: 0 development permits2012: 0 building permits122013: 0 development permits2013: 0 building permits132014: 1 development permit2014: 0 building permits142015: 0 development permits2015: 1 building permit152016: 1 development permit2016: 0 building permits162017: 0 development permits2017: 1 building permit172018: 0 development permits2018: 1 building permit182019: 0 development permits2019: 0 building permits192020: 0 development permits2020: 0 building permits202021: 0 development permits2021: 0 building permits212022: 0 development permits2022: 0 building permits222023: 0 development permits2023: 1 building permit232024: 0 development permits2024: 0 building permits242025: 0 development permits2025: 0 building permits252026: 0 development permits2026: 0 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 2 since 2012

AppliedPermitCategory · descriptionStatus
2016-05-31DP2016-2136Signs - Discretionary Use
NEW: SIGN - CLASS C (FREESTANDING SIGNS)
Cancelled
2014-11-12DP2014-5420Commercial - Other Areas
NEW: OFFICE, INSTRUCTIONAL FACILITY (1 BUILDING)
Released
Approval

Recent building permits 4 since 2012 · 1 in the City’s office class

AppliedPermitClass · workEst. costStatus
2023-05-17BP2023-072297103 - Special Function - Class 1 · Temporary
Special Event Tent
$8,000Completed
2018-05-30BP2018-066217103 - Special Function - Class 1 · New
Outdoor event- Lafarge Family Day
$8,075Completed
2017-04-26BP2017-044357103 - Special Function - Class 1 · New
Tent Structures Temporary
$6,700Completed
2015-04-02BP2015-035203402 - Office · New
Lafarge New Office Building: 2 storey office
$8.9MCompleted

Declared estimated project cost across all 4 non-residential building permits on the parcel since 2012: $8.9M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

21 inspection results are published against 3 of the 4 building permits on this parcel, from 2015-06-12 to 2018-06-15. The most recent occupancy inspection was accepted on 2018-06-15.

What was inspected

0246Documents and directives: 66Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection11
Acceptable with Conditions6
Acceptable3
Not Acceptable1

Stage

Inspection typeCount
Progress15
Occupancy4
Final2
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2018-06-15BP2018-06621Occupancy—Acceptable with ConditionsTents shall be remove by June 20, 2018
2017-05-05BP2017-04435Occupancy—AcceptableNo deficiencies. Tent set up is acceptable.
2016-08-22BP2015-03520Final—AcceptableAll documents received.
2016-08-22BP2015-03520Occupancy—AcceptableProject is complete and acceptable.
2016-07-27BP2015-03520Final—Not AcceptableSubmit Occupancy Application sheet.
2016-06-23BP2015-03520Occupancy—Acceptable Add InspectionWork is acceptable. Call for Occupancy when signatures and documents are complete.
2016-05-26BP2015-03520ProgressDOCUMENTS CommercialAcceptable with ConditionsSprinkler Verification is required at final inspection.
2016-05-26BP2015-03520ProgressDOCUMENTS CommercialAcceptable with ConditionsProvide Canadian Welding Bureau Certificates of Validation at final inspection.
2016-05-26BP2015-03520ProgressDOCUMENTS CommercialAcceptable with ConditionsC1 and/or C2 letters required at final inspection.
2016-05-26BP2015-03520ProgressDOCUMENTS CommercialAcceptable with ConditionsFire Alarm Monitor certificate is required at final inspection.
2016-05-26BP2015-03520ProgressDOCUMENTS CommercialAcceptable with ConditionsFire Alarm Verification is required at final inspection.
2016-03-29BP2015-03520Progress—Acceptable Add InspectionInspected rated shaft liners on parkade ceiling. Lining was found to be acceptable.
2016-02-19BP2015-03520Progress—Acceptable Add InspectionReviewed fire stopping on first and second floors. Work is acceptable. Ok to proceed with boarding.
2016-02-08BP2015-03520Progress—Acceptable Add InspectionFirestopping of bathrooms is acceptable on the top side.

An inspection result is a record of one visit, not a verdict on the building. 1 of these 21 results are recorded as Not Acceptable. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 1 as of 2026-09-24

Licensed businessAddressLicence typeStatusLicensed since
Foothills Ready Mix2213 50 Ave SEContractor (No Provincial Licence Required)Licensed2017

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 2417 51 Ave SE8.1 m · built 2003 · Small Office · Valleyfield · 321 m
  • 6111 36 St SE10.4 m · built 1979 · Small Office · Foothills Industrial · 2.0 km
  • 7011 Ogden Rd SE6.1 m · built 1974 · Small Office · Ogden · 2.1 km
  • 1220 59 Ave SE20.5 m · built 1979 · Office use recorded by City permits (roll code X034) · Burns Industrial · 2.1 km
  • 1212 58 Ave SE4.2 m · built 1973 · Small Office · Burns Industrial · 2.2 km
  • 4303 11 St SE4.9 m · built 1977 · Small Office · Highfield · 2.3 km

2213 50 Ave SE questions

Answers drawn from the record.

How tall is 2213 50 Ave SE?

The main structure on the parcel has a LiDAR roof height of 15.2 m in The City of Calgary’s 3D building data, a storey-equivalent of about 4 at 3.9 m per storey.

When was 2213 50 Ave SE built?

The City’s assessment roll records 2015 as the year of construction.

What is the assessed value of 2213 50 Ave SE?

The City of Calgary assesses this parcel at $5.4M in total on the 2026 roll, 341st of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 2213 50 Ave SE zoned?

The parcel is designated I-B,I-G, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 2213 50 Ave SE?

39 Avenue Station, 3.9 km in a straight line from the parcel centroid.

Who is in 2213 50 Ave SE?

The City of Calgary business licence register lists 1 licensed business at this address or inside the parcel as of 2026-09-24, shown in the occupiers section. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 2213 50 Ave SE been inspected?

The City publishes 21 inspection results against 3 permits here, between 2015-06-12 and 2018-06-15. The most recent occupancy inspection was accepted on 2018-06-15. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 2213 50 Ave SE?

143 scheduled transit trips call within 300 m of the parcel on a representative weekday, 20 of them in the morning peak, across 3 routes. The closest stop is WB 50 AV SE @ 23 ST SE far-side, 192 m away. That is the published schedule for one service period, not observed service, and it counts each trip once however many stops it makes nearby.

Can staff cycle or get there in winter at 2213 50 Ave SE?

No mapped bikeway lies within 400 m. The parcel fronts a Priority 1 snow and ice clearing route. These are straight-line tests against City layers.

Where can visitors park at 2213 50 Ave SE?

No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.

Is office space available at 2213 50 Ave SE?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.