46 Hopewell Way NE

Office use recorded by City permits (roll code X034) · mid-rise office building · built 2015 · 46 Hopewell Way NE

3D render of 46 Hopewell Way NE, a 17.4 m mid-rise office building in Horizon, Calgary, modelled from City of Calgary LiDAR
Rendered by OfficeBuildings.ca from The City of Calgary 3D building outlines and ground elevations, with 46 Hopewell Way NE highlighted among its neighbours. A derived massing model, not a photograph. Explore it in the 3D city.

46 Hopewell Way NE is a 17.4 m mid-rise office building in Horizon, Calgary, recorded on the City assessment roll as built in 2015. Its main structure is the 305th tallest office roof of the 775 ranked in this record, and 2nd of 7 in Horizon. The City assesses the parcel at $4.9M on the 2026 roll, 372nd of 822 sites in the record by assessed value. Since 2012 the City has recorded 1 building permit and 7 development permits on the parcel, the largest a $6.8M office permit for new construction, applied for in 2015.

LiDAR roof height17.4 m
Storey-equivalent (derived)4
Footprint1,016 m²
Parcel6,995 m²
Year built (roll)2015
Assessed 2026$4.9M
Structures on parcel2
Nearest CTrain1.4 km
Civic address
46 Hopewell Way NE, Calgary, AB
Community
Horizon (HOR)
City sub-property use
X034 Roll code X034 (no published description) · all Office use recorded by City permits (roll code X034) sites
Land use district
C-COR3 — Commercial - Corridor 3 (Commercial)
Height rank
#305 of 785 citywide · #2 of 7 in Horizon
Footprint to parcel
14% of the parcel under LiDAR footprints
Parcel pieces
1 titled piece · roll 200538528
Coordinates
51.094207, -113.997355
Why this building is in the record

The City assesses this parcel under roll code X034, for which it publishes no description, so the office-code definition alone would omit it. It is included because The City’s own building permits record office use on the parcel: 1 permit in the City’s Office classes between 2015 and 2015, 1 of them for new office construction. The building may hold other uses as well. Every building included this way.

Massing and site plan

Left: isometric massing of every LiDAR structure on the parcel, at true scale, viewed from the south-west with 3.9 m storey lines. Right: plan of the parcel with surrounding footprints, Plus 15 walkways and nearby stations. Open this building in the 3D city →

17.4 mN20 mLiDAR roof outlines · City of Calgary · true scale
17.4 m · 965 m² · 4.2 m · 51 m²
7.8 m structure10.5 m structure19.6 m structure4.2 m · 51 m² footprint17.4 m · 965 m² footprintN50 mFootprints within 182 m · City of Calgary
Context within 182 m. Grey footprints darken with height; lime is the Plus 15 network.

How it compares

Roof height against the Horizon median and tallest, and against the city.

46 Hopewell Way NE17.4 mHorizon median11.7 mHorizon tallest23.5 mCalgary office median13.8 mCalgary tallest office roof243.2 m

Access

Public-geometry tests only; confirm routes, entrances and hours with the building.

CTrain

Nearest station: Whitehorn, 1.4 km straight-line (route 202).

Plus 15

Outside the Plus 15 network area.

Cycling

The best-rated cycling facility within 400 m of the parcel is a community street (On-Street Bikeway), 308 m away.

Winter access

No Priority 1 or 2 snow and ice clearing route lies within 30 m of the parcel edge.

Accessible crossing

No accessible pedestrian signal lies within 400 m of the parcel.

Straight-line tests against The City of Calgary Calgary Bikeways, Snow and Ice Clearing Priority Routes and Traffic Signals, retrieved 2026-09-24. Bikeways are ranked by the City's comfort level, where 1 is a protected lane and 4 a major street. Snow priority is a clearing order, not a clearing time. An accessible pedestrian signal gives audible and tactile crossing cues; a signal recorded as unknown is not counted as having none.

Transit service

Scheduled Calgary Transit service at the door, not only the distance to a platform.

No scheduled Calgary Transit stop lies within 450 m of this parcel on the service day in the City's published schedule.

Parking

What the City’s own tariff record says about kerbside parking beside this parcel.

No Active paid on-street parking zone lies within 200 m of this parcel in the City’s tariff dataset. That is not a statement that parking is unavailable: free, permit-only and off-street parking are not recorded in this source.

Assessment history

Assessed values are The City of Calgary’s taxation figures by roll year, not sale prices or rents; Alberta does not publish transaction prices.

Roll 200538528 · X034

Series not charted. The City’s published values for this roll number change by more than half or double between years, which usually signals a re-numbered, split or partially assessed account rather than a market movement. The published figures are listed below without a trend claim.

Published values by roll year
Roll yearAssessed valueChange
2005$801,000—
2006$958,00019.6%
2007$1.2M26.3%
2008$1.2M-2.5%
2009$2.6M119.5%
2010$2.2M-15.4%
2011$2.9M30.6%
2012$2.8M-3.5%
2013$2.0M-26.8%
2014$2.3M11.4%
2015$2.5M10.2%
2016$4.5M79.4%
2017$9.2M105.8%
2018$7.3M-19.9%
2019$6.1M-16.5%
2020$5.9M-4.2%
2021$6.0M1.4%
2022$6.0M1.2%
2023$5.1M-15.4%
2024$4.6M-9.6%
2025$4.7M2.6%
2026$4.9M3.2%

Development and building permits

Applications the City has located on this parcel since 2012, from the Development Permits and Building Permits datasets.

0122012: 0 development permits2012: 0 building permits122013: 0 development permits2013: 0 building permits132014: 1 development permit2014: 0 building permits142015: 1 development permit2015: 1 building permit152016: 2 development permits2016: 0 building permits162017: 1 development permit2017: 0 building permits172018: 0 development permits2018: 0 building permits182019: 0 development permits2019: 0 building permits192020: 1 development permit2020: 0 building permits202021: 0 development permits2021: 0 building permits212022: 0 development permits2022: 0 building permits222023: 1 development permit2023: 0 building permits232024: 0 development permits2024: 0 building permits242025: 0 development permits2025: 0 building permits252026: 0 development permits2026: 0 building permits26Development permitsBuilding permits (non-residential)

Recent development permits 7 since 2012

AppliedPermitCategory · descriptionStatus
2023-03-31DP2023-01994Change of Use - Permitted Use
CHANGE OF USE: VEHICLE SALES - MINOR
Cancelled
2020-05-19DP2020-3145Signs - Discretionary Use - Third Party Signs
TEMPORARY USE: SIGN - CLASS G (DIGITAL THIRD PARTY ADVERTISING SIGN - 3 YEARS)
Refused
Refusal
2017-06-01DP2017-2341Signs - Discretionary Use
NEW: SIGN - CLASS E (DIGITAL MESSAGE SIGN)
Refused
Refusal
2016-03-29DP2016-1159Signs - Permitted Use with Relaxation
NEW: SIGN - CLASS B (FASCIA SIGNS - 3)
Released
Approval
2016-02-29DP2016-0741Signs - Discretionary Use
NEW: SIGN - CLASS E (DIGITAL MESSAGE SIGN)
Refused
Refusal
2015-06-19DP2015-2601Commercial - Other Areas
NEW: OFFICE (CHANGE TO HEIGHT)
Released
Approval
2014-08-28DP2014-4187Commercial - Other Areas
NEW: OFFICE
Released
Approval

Recent building permits 1 since 2012 · 1 in the City’s office class

AppliedPermitClass · workEst. costStatus
2015-05-06BP2015-051403402 - Office · New
New Office Building - United Food and Commercial Workers Benevolent Association Calgary
$6.8MCompleted

Declared estimated project cost across all 1 non-residential building permits on the parcel since 2012: $6.8M. Permit descriptions are the City’s records at retrieval; applicant and contractor names are not reproduced.

Inspections

What City inspectors recorded against the permits on this parcel.

38 inspection results are published against 1 of the 1 building permit on this parcel, from 2015-08-25 to 2016-10-13. The most recent occupancy inspection was accepted on 2016-10-13. 8 inspections used a life-safety checklist and 4 a barrier-free checklist.

What was inspected

0510Fire separations and fire resistance: 11Fireseparations and fire resistanceFirestopping: 66FirestoppingBarrier-free: 44Barrier-freeAlarm and suppression: 11Alarmand suppressionDocuments and directives: 1313Documentsand directives

Result of each visit

OutcomeInspections
Acceptable Add Inspection37
Acceptable1

Stage

Inspection typeCount
Progress27
Occupancy6
Foundation3
Framing2
The 14 most recent inspection results
DatePermitStageChecklistOutcomeInspector note
2016-10-13BP2015-05140Occupancy—AcceptableReceived Documents. Close File.
2016-10-11BP2015-05140Occupancy—Acceptable Add InspectionA walkthrough has been completed. This file can be closed upon receipt of documents which can be emailed to Ensure the letters are completely filled out and the Building permit # is recorded.
2016-09-29BP2015-05140Occupancy—Acceptable Add InspectionOccupancy Application still requires signature of Fire SCO
2016-09-29BP2015-05140OccupancyDOCUMENTS CommercialAcceptable Add InspectionC1 and/or C2 letters required from Arch (Davigon/Martin)
2016-09-27BP2015-05140OccupancyDOCUMENTS CommercialAcceptable Add InspectionC1 and/or C2 letters required for Arch (Davignon/Martin), Struct (Conceptacier), Geotech (JASA), Mech (CIMAt) Elec(CIMAt)
2016-09-27BP2015-05140Occupancy—Acceptable Add InspectionWork is nearing completion. Recall inspection when deficiencies are corrected and documents are available.
2016-08-17BP2015-05140ProgressFIRESTOPPINGAcceptable Add InspectionFirestopping is required on services in main floor Elec room ( remove spray foamed insulation).
2016-08-17BP2015-05140ProgressBARRIER-FREE BUILDINGSAcceptable Add Inspection3.8.3.1 Barrier Free signage required on door to washrooms.
2016-08-17BP2015-05140Progress—Acceptable Add InspectionSprinkler drawings and calculations as well as A and B Schedules are to be sent to the plans examiner.
2016-08-17BP2015-05140ProgressFIRESTOPPINGAcceptable Add InspectionFirestopping required in 2nd floor service room.
2016-08-17BP2015-05140ProgressBARRIER-FREE BUILDINGSAcceptable Add Inspection3.8.3.8 BFree washroom coat hook not more than 1200mm high ( see basement universal and women's washroom ).
2016-08-17BP2015-05140Progress—Acceptable Add InspectionWork is nearing completion. Ensure to complete exterior works and deficiencies prior to calling for final.
2016-08-17BP2015-05140ProgressFIRESTOPPINGAcceptable Add InspectionFirestopping required in open conduits through fire separation ( see basement floor Mech Room ).
2016-08-17BP2015-05140ProgressGUARDS & HANDRAILSAcceptable Add Inspection3.4.6.6. Guards required in several areas on the exterior and interior along with stair handrails.

An inspection result is a record of one visit, not a verdict on the building. In the City's process a Not Acceptable result is an ordinary step: the inspector lists what must change and the work is re-inspected, which is why the most common outcome across the record is Acceptable Add Inspection. Most results relate to a single tenant improvement rather than the whole building. Inspector notes are The City of Calgary's own text at retrieval, with contact details removed; applicant and contractor names are never read.

The City of Calgary Building Inspections Results, joined to building permits by permit number, retrieved 2026-09-24.

Occupiers and licensed businesses

The public record of who operates on the parcel, labelled by source.

Businesses licensed by the City on this parcel 0 as of 2026-09-24

No City of Calgary business licence is recorded at this address or inside this parcel.

Not a tenant roster. The City licenses specific business types (retail, food service, personal services, contractors, wholesalers, schools and similar). Most office occupiers such as professional firms need no municipal licence and do not appear here. Matched by civic address and by licence location inside the parcel; home-based licences are excluded.

No individuals are named. The City issues many personal-service licences to people trading under their own name. Suite numbers are never published, and where a licence reads as an individual rather than an organisation the name is withheld and only the licence category is shown. Names of sources this site does not use are omitted.

Nearby office buildings

The six nearest office building sites in the record, by straight-line distance between parcel centroids.

  • 2728 Hopewell Pl NE14.9 m · built 2000 · Office use recorded by City permits (roll code X034) · Horizon · 203 m
  • 2618 Hopewell Pl NE23.5 m · built 2006 · Office use recorded by City permits (roll code X034) · Horizon · 301 m
  • 2435 Pegasus Rd NE6.8 m · built 1998 · Small Office · Pegasus Industrial · 411 m
  • 2735 39 Ave NE11.7 m · built 1980 · Office use recorded by City permits (roll code X034) · Horizon · 678 m
  • 2320 41 Ave NE7 m · built 1977 · Small Office · North Airways · 732 m
  • 2723 37 Ave NE9.1 m · built 1981 · Office use recorded by City permits (roll code X034) · Horizon · 888 m

46 Hopewell Way NE questions

Answers drawn from the record.

How tall is 46 Hopewell Way NE?

The main structure on the parcel has a LiDAR roof height of 17.4 m in The City of Calgary’s 3D building data, a storey-equivalent of about 4 at 3.9 m per storey.

When was 46 Hopewell Way NE built?

The City’s assessment roll records 2015 as the year of construction.

What is the assessed value of 46 Hopewell Way NE?

The City of Calgary assesses this parcel at $4.9M in total on the 2026 roll, 372nd of 822 sites in this record. Assessed value is the City’s figure for property tax, not a sale price or an asking price.

What is 46 Hopewell Way NE zoned?

The parcel is designated C-COR3, Commercial - Corridor 3, under the City of Calgary Land Use Bylaw. Confirm the designation and any amendments with the City before relying on it.

Which CTrain station is closest to 46 Hopewell Way NE?

Whitehorn Station, 1.4 km in a straight line from the parcel centroid.

Who is in 46 Hopewell Way NE?

No City of Calgary business licence is recorded at this address or inside the parcel. Most office occupiers such as professional firms do not need a municipal licence, so the register is not a tenant roster.

Has 46 Hopewell Way NE been inspected?

The City publishes 38 inspection results against 1 permit here, between 2015-08-25 and 2016-10-13. 8 used a life-safety checklist such as fire separations, firestopping or emergency lighting. 4 used the barrier-free checklist. The most recent occupancy inspection was accepted on 2016-10-13. Each result records one visit and most relate to a single tenant improvement, so this is not a verdict on the building.

How good is transit at 46 Hopewell Way NE?

No scheduled Calgary Transit stop lies within 450 m of this parcel in the City's published schedule.

Can staff cycle or get there in winter at 46 Hopewell Way NE?

The best-rated cycling facility within 400 m is a community street, 308 m away. No Priority 1 or 2 clearing route lies within 30 m of the parcel edge. These are straight-line tests against City layers.

Where can visitors park at 46 Hopewell Way NE?

No Active paid on-street parking zone lies within 200 m of this parcel in the City's tariff dataset. Free, permit-only and off-street parking are not recorded in that source, so this is not a statement that parking is unavailable.

Is office space available at 46 Hopewell Way NE?

This profile is built from public records and does not track availability, rents or tenancy. Submit a private requirement and current options in the building or nearby will be confirmed through Commercially.

Public record sources: Current Year Property Assessments (Parcel), Historical Property Assessments (Parcel), Assessment Subproperty Use Codes, 3D Buildings - Citywide (LiDAR roof outlines), Land Use Districts, Transit LRT Stations, Green Line Stations, Plus 15, Historic Resource (Inventory of Evaluated Historic Resources), Development Permits, Building Permits, Calgary Existing Buildings - Performance Metrics (BenchmarkYYC), Calgary Business Licenses, On-Street Parking Zones with Rates, Building Inspections Results, Residential Parking Zones, Snow and Ice Clearing Priority Routes, Traffic Signals, Calgary Bikeways — The City of Calgary, retrieved 2026-09-24. Contains information licensed under the Open Government Licence – City of Calgary. Building names, floor counts and architects, where shown, come from Wikidata (CC0). No brokerage, listing-data or commercial research source is used.

Boundary: Assessed values are the City’s assessment-roll figures for taxation and are not sale prices, asking rents, vacancy or availability; Alberta does not publish transaction prices. LiDAR heights are roof-surface elevations above the lowest ground point at the building perimeter and can differ from architectural heights. Storey equivalents are derived at 3.9 m per storey and are not floor counts. Distances are straight-line. Permit descriptions are the City’s records at retrieval and do not establish current use, tenancy or availability. Read the methodology.