What to verify
Business continuity and backup systems. Client and employee arrival. Brand, signage and event needs. Expansion, contraction and term flexibility. Request evidence for the features that control the business decision.
Workplace fit
Test peak attendance, rooms, privacy, collaboration, clients, storage, technology and growth on the actual floorplate. A category label does not establish that the premises supports the program.
Building fit
Confirm access, elevators, HVAC, power, security, accessibility, loading, parking, operating hours and planned capital work.
Commercial fit
Normalize rentable area, rent, recoveries, parking, utilities, incentives, tenant work, term, options and restoration exposure.
Evidence boundary: office availability and quoted economics change. Confirm current premises, authority, area, costs, permitted use and documents for the specific transaction. Read the methodology.